Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Integrated Mine Planning and Geotechnical Engineering for Northeast BC Coal Mines (e0f0a96a-bfee-4155-90c5-5f00d9cd48ef)

    By Richard Dawson

    Presentation Outline? Northeast BC Coal Fields Overview and History ?New mines and projects in development ?Design Issues for steeply dipping footwall slopes ?Design issues for angle-of-repose was

    May 1, 2006

  • CIM
    International Geological Correlation Programme (IGCP) Project 502: Global Comparison of Volcanic-hosted Massive Sulphide (VMS) Districts: The controls on distribution and timing of VMS deposits

    By Rodney Allen

    Background: Development of the Project ?European GEODE collaboration 1999: considers possible projects, including a VMS project, to continue after GEODE ?GEODE-CODES-Canada collaboration 1999: Quest

    Apr 1, 2005

  • CIM
    Study of Elemental Sulfur Formation in the Fluid Bed Dryer Baghouse

    By J. Lui

    Inco Copper Cliff Smelter commissioned two new Inco flash furnaces in 1991/1993 as part of its S02 abatement program. Each flash furnace is equipped with a fluid bed dryer. The ~ 12 wt% water content

    Jan 1, 2007

  • CIM
    Development and Implementation of Pyrometallurgical Processing of Primary Gold Concentrate with High Stannum Content

    By A. Y. Senchenko, S. G. Rybkin, A. V. Aksenov

    In gravity processing of gold-containing ore the target produced concentrate which is high gold grade primary concentrate contains a significant amount of cassiterite (SnO2). The plant attempts aiming

    Jan 1, 2016

  • CIM
    Economic Factors of Hydraulic Rock Drilling Equipment

    By R. G. Bradbury

    The paper uses two hypothetical, but typical, situations to show that hydraulic rock drilling equipment has very significant economic advantages over pneumatic equipment both in drifting applications

    Jan 1, 1979

  • CIM
    Monitoring of Dynamic Bolts for High Stress Mining

    By F. Charette

    The paper reviews the requirements of the instrumentation required to monitor mining excavations in a high stress environment, and the development plan to instrument the D-Bolt in such a fashion as to

    Jun 1, 2012

  • CIM
    New Dimensions in Seismic Data Interpretation for Burst-Prone Mines

    By P. K. Kaiser

    3-D virtual reality (VR) visualization has opened new opportunities for complex 3D (x, y, z), 4D (x, y, z, t) or even nD data interpretation. The integration of common earth models (3D geologic data),

    Apr 1, 2005

  • CIM
    Commissioning and Operation of the Ag Mills at the Aitik Expansion Project

    By S. Markstrom

    The Boliden AITIK copper mine is located 100 kilometres north of the Arctic Circle in northern Sweden. A pre-feasibility study was conducted in 2005 with the aim of increasing the capacity of the exis

    Jan 1, 2012

  • CIM
    Celestite in Canada

    By P. R. A. Andrews, R. K. Collings

    "There are more than thirty-five deposits or occurrences of celestite in Canada, chiefly in Newfoundland, Nova Scotia, New Brunswick, Ontario and British Columbia. Deposits of economic interest are th

    Jan 1, 1991

  • CIM
    Equipment adaptation to tile Canadian North at Iron Ore Company of Canada

    By R. E. G. Caines, P. Alport

    "Operating heavy equipment in Labrador, where the winters are 8 months long and the temperature frequently drops below -40°F (-40°C) for days and sometimes weeks presents unique problems in both the o

    Jan 1, 1984

  • CIM
    Computer assisted economic analysis to select a stoping method

    By R. R. Tatiya

    "The ultimate aim of a mine design is to determine the development work involved and resources required by adopting one or more specific alternatives. A part of the process is the production of mining

    Jan 1, 1998

  • CIM
    Effect of compost and soil covers on radon emanation from uranium tailings

    By M. Silver, R. H. McCorkell

    The effects of covering materials on radon emanations from uranium mine mill tailings were investigated. Granular materials with air in the spaces allow radon to pass freely. Moist covers of compost o

    Jan 1, 1987

  • CIM
    Mechanical Properties of Degradable Magnesium Implants in Dependence of the Implantation Duration

    By Chr. Krause

    Within the scope the collaborative research centre 599 (Medical University of Hanover, University of Veterinary Medicine Hanover, University of Hanover) the behaviour of the degradation of magnesium m

    Jan 1, 2006

  • CIM
    Current and future demand for aggregate in the Edmonton region

    By W. A. D. Edwards

    "The Edmonton region accounted for 40% of Alberta's sand and gravel production in 1981 (about 12 million m3). Most of this production was by commercial operations (75%) for use in essential publi

    Jan 1, 1989

  • CIM
    Deep Shaft Hoisting at Laronde - The Penna Shaft Hoisting Plant

    By Bennett McLaughlin

    AGNICO-EAGLE started sinking the Penna Shaft in 1995 with a hoisting plant capable of hoisting 1,800 tonnes per day from a 2,240 metre deep shaft. Exploration success lead to the installation of a hoi

    May 1, 2001

  • CIM
    Mechanized narrow vein mining at the Dome Mine, Timmins, Ontario

    By Brian E. Robertson

    "This paper summarizes work carried out at the Dome Mine to mechanize the mining of narrow veins of less than 1.5 m in width by the introduction of new mining methods and specifically designed electri

    Jan 1, 1986

  • CIM
    Interactive computer modelling of truck haulage systems

    By L. K. Nenonen

    "Given the properties, locations and quantities of material to be hauled and the dump locations and capacities, the designer wishes to select the type and number of trucks and loading equipment requir

    Jan 1, 1982

  • CIM
    ISO 26000 Does It Make a Difference

    By Joanne G. Petrini

    ISO 26000 Unique Process Unique Personality ?Almost 10 years in the making ?What type of standard is this? Different type of ISO Standard ISO 26000 Structure and Substance ?Principles ?Core Su

    May 1, 2011

  • CIM
    Alternative technology to decrease the environmental impact of gold milling a progress report on CANMET research activities in this field

    By R. E. Molnar, P. A. Riveros, V. M. McNamara

    "This paper describes some recent research done at CANMET in the areas of ion exchange and A VR (Acidification- Volatilization Reneutralization), as applied to the recovery of gold and cyanide, respec

    Jan 1, 1993

  • CIM
    Blast optimization and stability enhancement through geotechnical mapping at Highland Valley Copper

    By D. Assmus, S. Daly

    "Poor fragmentation, high toe areas, excessive shovel wear and tear and frequent re-drilling and blasting of certain tough waste rock zones in the Lomex pit in the early 1980snecessitateda better unde

    Jan 1, 1992