Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Base Metal Massive Sulfide Deposits at the Winter Hill and Frenchman Head Prospects, Avalon Zone, Newfoundland

    By D. H. C. Wilton, W. A. Sears

    "Abstract-The 682.8 ± 1.6 Ma Tickle Point Group consists mainly of rhyolite flows and tuffs with- in the Avalon Zone of the Appalachian Orogen in Newfoundland. Stratabound massive sulfide mineralizati

    Jan 1, 1996

  • CIM
    Statistical Control in the Evaluation of an Asbestos Deposit

    By Robert F. Shurtz

    This paper discusses and compares methods of statistical analysis of the information relating to the evaluation of an asbestos deposit. From a study of 10-ft. lengths of drill core, the separate effec

    Jan 1, 1966

  • CIM
    Elemental Sulfur Removal from Hydrometallurgical Leach Residue via Polysulfides: Process Considerations

    By K. Hawboldt, J. E. Halfyard, C. Bottaro, I. A. Harrison

    "The removal of elemental sulfur from leach residues derived from massive sulfide concentrates via hydrometallurgical routes has been demonstrated in a laboratory setting by converting water-insoluble

    Jan 1, 2012

  • CIM
    Developing a Diamond Deposit in Saskatchewan

    By Shawn Harvey

    HIGHLIGHTS of STAR DIAMOND PROJECT Initial underground bulk sample 4,048 ct / 25,253 tonnes: US$135/carat: 3,050 ct March 2005 $116 million financing: Newmont takes 9.9% SGF Prefeasibility study

    May 1, 2006

  • CIM
    Rabbit Lake project - history of exploration and general geology

    By D. M. Ward

    "The uranium deposits upon which the Rabbit Lake project story is based are located at the eastern margin of the Athabasca Basin just west of Wollaston Lake in northern Saskatchewan. This paper provid

    Jan 1, 1989

  • CIM
    The Highmont Copper-Molybdenum Deposits, Highland Valley, British Columbia

    By A. J. Reed, W. R. Bergey, Carr. J. M.

    "The Highmont copper-molybdenum deposits are at Gnawed Mountain in the Highland Valley porphyry copper district, 125 miles northeast of Vancouver. This district is near the center of the lower Jurassi

    Jan 1, 1971

  • CIM
    Adequacy of Ontario's Water Resources

    By A. K. Watt

    "The availability of fresh water to meet present and future needs in Ontario is of concern to an increasing number of people. Rain and snow are the source of our potable water and provide, on the aver

    Jan 1, 1967

  • CIM
    Operations at Canadian Copper Refiners Limited

    By G. Bridgstock, S. S. Forbes, E. M. Elkin

    "OPERATIONS at Canadian Cop-per Refiners Limited, since the refinery was established in 1931, have been described in previous papers ( 1,2). Since then the refinery has treated the entire copper outpu

    Jan 1, 1960

  • CIM
    Some Aspects of Industrial Safety in British Columbia

    By W. K. A. Congreve

    Introduction Less than a hundred years ago the engineer was able to do his job without concern for the science that underlay his practices or for the men who operated his machines. But toward the e

    Jan 1, 1948

  • CIM
    Valorization of Low-Grade Copper-Cobalt Ore from the Mukondo Mine by Heap Leaching and Solvent Extraction

    By M. B. Kime, E. K. Kanowa

    "Heap leaching of low-grade copper-cobalt oxidized ore and solvent extraction of copper, cobalt, manganese, and zinc were investigated. Heap-leaching parameters were optimized using agitated and tray

    Jan 1, 2017

  • CIM
    Commissioning of the BIOX and ASTER™ Processes at the Runruno Gold Project

    By M. Savella

    The Runruno Gold Project is located on the island of Luzon, approximately 200 km north of Manilla in the Philippines. The mine is a surface mine operation and use the proven BIOX® and carbon in leach

    Jan 1, 2017

  • CIM
    Rock Drilling with Tungsten Carbide Bits

    By J. H. Fulton

    Summary Considerable test work has been done with the detachable type of carbide bit. In general, these bits improved drilling operations, but at a bit cost .greater than was compensated for by the

    Jan 1, 1950

  • CIM
    Slope Stability at Lac Jeannine

    By J. M. Réjean Gagnon

    "Quebec Cartier Mining Company is currently mining a low-grade iron ore deposit in northeastern Quebec. The Company is producing some 8,000,000 dry gross tons of concentrates per year, grading about 6

    Jan 1, 1968

  • CIM
    Integrated Water Cyclone Plants for Coal Preparation

    By J. Visman

    "Cyclone separators of different design are being used in increasing numbers in the coal industry of today. One recent addition, the Compound Water Cyclone, is finding application in the North America

    Jan 1, 1968

  • CIM
    Elemental Sulphur Recovery in Western Canada

    By M D. Winning

    The historical development of the elemental sulphur recovery industry in Western Canada is reviewed for the period 1952 to 1965. A brief technical description of a typical modified Claus sulphur recov

    Jan 1, 1965

  • CIM
    Sheep Creek Gold Mining Camp

    By R. A. McGuire

    THE recorded production of the Sheep Creek camp from 1900, when the Yellowstone Mining Company first put its mill into operation, to the present day is in excess of $17,500,000. Of this total, $2,500,

    Jan 1, 1942

  • CIM
    Directive 019 Historique

    ? Élaboration de la Directive 019 (1982) ? Objectifs: ? Protection de l ?environnement ? Procédure administrative pour analyse et évaluation environnementale ? Officialisée en 1989 ? pas eu de m

    May 1, 2001

  • CIM
    Electrolytic Zinc From Fume Produced From Trail Lead Blast-Furnace Slags

    By W. H. Hannay

    Introduction The subject matter of this paper will be treated under two heads: (1) experimental work and the development of the purification system, and (2) the operation of the commercial plant. Dur

    Jan 1, 1934

  • CIM
    Chapter 7. The Joint Venture Relation

    By Karl J. C. Harries

    "7.1. INTRODUCTIONThis chapter addresses the joint venture and examines a number of general concepts of the joint venture relationship. Chapter 8 looks at some specific concepts related to the provisi

    Jan 1, 2003

  • CIM
    Stratigraphy, Mineralogy, Geochemistry, and Genesis of the Au-Rich Volcanogenic Massive Sulfide (Vms) System from the Bate Verte Peninsula, NW Newfoundland, Canada: The 1806 Zone As An Example From The Ming Mine, Rambler Camp

    By P. J. Sylvester, S. J. Piercey, S. Maloney, S. M. Brueckner, L. Pilgrim, D. Hyde, G. Ogilvie

    The 1806 zone is part of a Au-rich volcanogenic massive sulfide deposit at the Rambler Camp on the Baie \/erte Peninsula, northwestern Newfoundland, and is characterized by high Au grades (3.97 g/t),

    Jan 1, 2011