Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams Mine

    By David Evans, David Barnes, Robert Raponi

    "The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind

    Jan 1, 1997

  • CIM
    Automated Real-Time Elementary Analysis of Drill Dust using LIBS Technology

    By Karl Nienhaus

    The BGMR has developed a method for an online-analysis during drilling processes in cooperation with Fraunhofer Institute for Laser Technology in Aachen and various industrial partners. This allows fo

    Oct 1, 2009

  • CIM
    Comparison of Uranium Solvent Extraction Strip Options

    By Deon van Tonder, Chuck Edwards

    "Solvent extraction is used in many acid leach uranium circuits to upgrade and purify the uranium bearing solution prior to final product precipitation. A number of strip options are available to reco

    Jan 1, 2013

  • CIM
    A Feasibility Study on the Use of Desulphurized Tailings to Control Acid Mine Drainage

    By Mostafa Benzaazoua, Bruno Bussière, Philippe Poirier, Denis Bois

    "Environmental desulphurisation is an attractive alternative for the management of acid generating tailings. Non selective froth flotation is the most commonly used method to produce desulphurized tai

    Jan 1, 2004

  • CIM
    Frother and Collector Effects on Flotation Cell Hydrodynamics and Their Implication on Circuit Performance (c615fbc8-d724-48ab-a36a-7fd85aca4c5e)

    By J. E. Nesset

    "Significant progress has been made over the past few years on characterizing and understanding the hydrodynamic properties of frothers and collectors and their effect on flotation performance. This n

    Jan 1, 2010

  • CIM
    Design Considerations for Mine Waste Management at the Meadowbank Gold Project

    By Cameron J. Clayton

    Cumberland Resources Ltd. is currently planning to develop the Meadowbank Gold Project located some 70 km north of Baker Lake, Nunavut in the eastern Canadian Arctic region. The Meadowbank Gold Projec

    May 1, 2004

  • CIM
    Prospecting for Gold: Self-Assembly on Old CDs

    By Hua-Zhong Yu

    Gold is one of the most widely used substrate materials for self-assembly. Self-assembled monolayers (SAMs) prepared from alkanethiols and their derivatives on gold are the most reliable and well-stud

    Oct 1, 2003

  • CIM
    Metallurgical Testwork on Harmony Project Ore

    By K. Gie Tan, Frank Wright

    "Misty Mountain Gold Limited (MGL - TSE VSE, MGLCF - NASDAQ) of Vancouver, owns the Harmony Gold Project located in the Queen Charlotte Islands of British Columbia. The deposit contains a mineable res

    Jan 1, 2000

  • CIM
    Flotation at Les Mines Selbaie

    By Adam Wright

    "Les Mines Selbaie have been producing copper and zinc concentrates from the A-1 ore zone since 1986. This paper reviews major developments in flotation practice over that period. Firstly, ore blendin

    Jan 1, 1995

  • CIM
    Functional Performance of Ball Milling

    By K. Wood, R. McIvor, P. Blythe, M. Lavallee

    A new analytical approach for characterizing and improving the performance of ball milling is presented. Individual ball mill circuit design and operating variables can be related to overall circuit p

    Jan 1, 1990

  • CIM
    On The Floatability of Gold Grains

    By Stephen L. Chryssoulis, Daniela Venter, Stamen Dimov

    "Comparative surface analysis of floated and rejected free gold grains from a number of full scale benefication plants and from pilot plant testwork, has shown silver (the most common impurity in gold

    Jan 1, 2003

  • CIM
    Real Time Performance Management in Metallurgical Operations

    By O. A. Bascur, J. Patrick. Kennedy

    "The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic

    Jan 1, 2004

  • CIM
    Influence of Shear Surface Geometry on Deformation Processes in Massive Landslides

    By K. S. Kalenchuk

    Massive landslides display complex deformation processes. For instance, slope movements of the Downie Slide, monitored using borehole inclinometers, extensometers, and survey monuments, show considera

    May 1, 2009

  • CIM
    Removal of Organic Carbon with a Jameson Cell at Red Dog Mine

    By Todd Smith, Brigitte Lacouture, Greg Anderson, David Lin

    "The lead and zinc flotation circuits at Red Dog Mine are preceded by a preflotation circuit which recovers naturally-floating organic carbon contained in the ore. Organic carbon is a potential contam

    Jan 1, 2008

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    Successful Design of the NICO Grinding Circuit for Unusually Hard Ore

    By Mike Samuels, John Starkey

    "This paper examines test results and grinding mill design for the recent Fortune Minerals’ NICO Project, located in the Northwest Territories. SAG milling and rod milling options are compared. Rod mi

    Jan 1, 2010

  • CIM
    Maximising Concentrate Revenues at the Xstrata Copper Kidd Concentrator

    By G. R. Morin, A. R. Leggett

    "In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous

    Jan 1, 2013

  • CIM
    Frother Analysis: Procedure and Plant Experiences

    By James A. Finch, Stéphanie Gélinas

    "A colorimetric technique, originally developed for methyl iso butyl carbinol (MIBC) based on the Komarowsky reaction, has been extended to a wide range of common mineral flotation frothers. The proce

    Jan 1, 2007

  • CIM
    Encapsulation of Mercury in Gossan Tailings Murray Brook Mine, New Brunswick, Canada

    By Robert Harris, Peter Pheeney

    "The Murray Brook gold mine operated from September 1989 to March 1991. Approximately 1.2 million tonnes of gossan were mined from an open pit and treated at a rate of 900 tonnes per day. The facility

    Jan 1, 2001

  • CIM
    Reduced Energy Consumption at Kidd Creek through Pressure Filtration Technology

    By S. Pinard, J. MacLellan, G. Ehlert

    "The Kidd Creek concentrator is looking actively for alternative technology as means of reducing operating costs in their concentrate handling section. The use of pressure and vacuum filters to elimin

    Jan 1, 1992