Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Permanent Rockbolts - The Problems are in the DetailBy R Bertuzzi
Permanent rock bolts in civil engineering are taken as having to serve their design purpose for at least 50 years. In many projects the design life is specified as greater than 100 years. A review of
Jan 1, 1999
-
Reducing Carbon Dioxide Emissions From Mount Isa OperationsUntil early-1997, Mount Isa Mines Limited (MIM) generated electrical power for most of north-west Queensland. The discoveries of many new orebodies in the region meant the inevitable increase in power
Jan 1, 1998
-
Direct Pressure Leaching of Australian Zinc ConcentratesBy Weir D. R, Doyle B. N
The Sherritt Zinc Pressure Leaching Process is based upon the direct pressure leaching of zinc sulphide or lead-zinc bulk sulphide concentrates to produce zinc sulphate in solution and elemental su
Jan 1, 1989
-
Oxidative Leaching of Chalcopyrite in a Chloride-Sulphate LixivantBy Pollard D. M
Chalcopyrite samples from two different localities were leached in oxygenated mixed chloride-sulphate lixivants at elevated temperatures and atmospheric pressure. The oxidation of chalcopyrite was
Jan 1, 1987
-
Recent Changes in ERA - Ranger Mine Acid Leach CircuitBy M W Kearns
The ERA - Ranger Mine ore processing operation consists of a sulphuric acid leach followed by counter current decantation and solvent extraction circuits. The most expensive unit processing operatio
Jan 1, 1994
-
Open stope design; beyond the Stability GraphBy B McFadyen, Y Potvin, K Woodward
The Australian Centre for Geomechanics (ACG) held two workshops in 2019—one in Australia and one in Canada—to discuss processes and methods currently used in the mining industry for stope design and r
Mar 15, 2021
-
An Experimental Investigation to Evaluate Gas Flow Characteristics of CoalBy McPherson M. J
An experimental investigation was carried out to determine the various gas flow characteristics of bituminous coal samples. Adsorption and desorption tests were first conducted to estimate the qua
Jan 1, 1988
-
A New Texture Analysis Technique for GeometallurgyBy K Nguyen
The advances in computerised processors and digital microscopic imaging have enabled more studies that attempt to quantify textural information from rock images. However, a texture classification syst
Sep 29, 2013
-
Bioflotation of Sarcheshmeh Copper Sulfide OreBy Y S. M Tabatabaei, R Hosseini Tabata
Application of Acidithiobacillus ferrooxidans bacteria to flotation of Sarcheshmeh low-grade copper sulfide ore was studied. Sarcheshmeh low-grade ore contains pyrite, which causes some problems in th
Jan 1, 2004
-
Towards a mining metaverse – spatial computing meets digital twins for remote operationsBy M Yahyaei, P Knights, M S. Kizil, J Qu
Digital Twins (DTs) are transforming business operations across many industries through their accurate representations of physical entities enabled by IoT technologies.
Sep 1, 2024
-
Pilot Tunnel and Blast Enlargement for Vibration ControlBy Lunardi P, Pelizza S
The link between the Lecco bypass and major road SS36 (Italy) requires the construction of a double two-way tunnel (through the mount San Martino carbonatic massif). The tunnel excavating section
Jan 1, 1987
-
Optimising Concentrator Returns: In-Stream Analysis and Process Control at Zawar Mines, IndiaHindustan Zinc Limited has successfully installed an In-Stream Analysis and Process Control System in the flotation section of the Balaria Lead-Zinc concentrator at Zawar Mines. The system comprises
Jan 1, 1991
-
Simulation of Copper Heap Leaching as an Aid to Design and OperationBy Mansor A. N
Results are reported for the computer simulation of heap leaching of mixed copper oxide and sulphide ores. They resemble those obtained from testwork in terms of a substantial peak in the copper co
Jan 1, 1989
-
Prediction of Groundwater Flow in Fissured Limestone, Blendevale Prospect, Western AustraliaCurrent problems in predicting sub-surface strata movement and fracture development due to longwall mining have highlighted the need for more accurate, dependable methods of physical modelling of r
Jan 1, 1988
-
Introduction to the ProjectThe mining activities on the North Mine leases have, over the years, followed the orebody from the shallower depths at the southern end of the lease as it continued northwards at progressively increas
Jan 1, 1957
-
Comparison Of The Economics Of Truck Haulage And Shaft Hoisting Of Ore From Mining OperationsBy Barnes E. L S
With the introduction of diesel powered loading and hauling equipment, a number of Australian mines producing less than one million tonnes per year from shallow orebodies have been dev- eloped by d
Jan 1, 1973
-
Review of Australian Dewatering Practice for Fine Coal and TailingsThe issue of fine coal and tailings dewatering has become of increasing concern to many coal preparation operators, both in Australia and overseas due to a variety of factors. Increasing mechanisat
Jan 1, 1991
-
Some Installation, Operational and Maintenance Aspects of Diesel Engine Power Plant, Gold Mines of Kalgoorlie LTD., W.A.This paper describes the oil engihe plant owned and operated by Gold Mines .of Kalgoorlie Limited, and gives some details of installation, operational, and maintenance experiences which have arisen du
Jan 1, 1945
-
Research on Dust Control for High Production Longwall Mining in AustraliaBy Lama RD
The paper outlines the development in the control of dust in Australia over the last 20 years. Factors influencing dust make at the faces are discussed. The effect of high production systems is an
Jan 1, 1988
-
Coal Firing of Sirosmelt ProcessesBy Taylor RN
A simple apparatus for delivering pulverized coal as fuel to a SIROSMELT lance is described, and its performance in smelting tests is evaluated. Using the pulverized coal as fuel, the SIROSMELT fu
Jan 1, 1987