Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Underground Space and Urban Planning in Australia - Are They Compatible?

    This paper discusses the potential role of underground space and tunnelling in urban planning in Australia. The paper gives examples of the infrastructure and commercial applications of underground sp

    Jan 1, 1999

  • AUSIMM
    Risk Assessment in Mine Rehabilitation Planning: Using the Option of an Above Ground Tailings Containment at Ranger Uranium Mine as an Example

    By Riley S. J

    Ranger Uranium Mine is located within the Alligator Rivers Region of the Northern Territory of Australia and surrounded by the World Heritage listed Kakadu National Park (Figure 1). The mining oper

    Jan 1, 1994

  • AUSIMM
    Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to Closure

    By J McCluskey, N Barros

    "Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c

    Nov 24, 2014

  • AUSIMM
    Maldon to Dombarton Rail Link – Design Development of the Avon Tunnel

    By A Bagis, T Baker

    In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct

    Sep 17, 2014

  • AUSIMM
    Use of Robust Design Methodology for Production Scale Definition in Open Pit Mining

    By M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova

    "Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus

    Nov 15, 2016

  • AUSIMM
    Applying Risk Management to the Mining Industry

    By Neville WE, Parkinson J

    One of the earliest recorded risk management schemes was implemented by the boatmen of the Yangtze river some 4,000 years ago.. Between them they arranged for shipments to be split up in such a wa

    Jan 1, 1986

  • AUSIMM
    Remodelling the Purnama Deposit – An Interpretation Case Study from G-Resources Martabe Project, Indonesia

    By A N. Kusnanto, D Sims, L Henim, S Crispin, J Hertrijana

    The high sulfidation Purnama Au-Ag deposit located on the Indonesian island of Sumatra entered production in mid-2012 following a two-year program of construction and development. Discovered in 1997 f

    Aug 18, 2014

  • AUSIMM
    Application of three lines model in resource and reserve estimation and reporting

    By D Hope, D K. Mukhopadhyay, J D. Harvey

    South32 (S32), a globally diversified mining and metals company, is listed on securities exchanges around the world (ASX, JSE, LSE), with its primary listing being on the Australian Securities Exchang

    May 24, 2023

  • AUSIMM
    Development of an empirical geo-metallurgical model that unlocks value of the mineral resources at Yandi Mine

    By P Gilroy

    In recent technical investigations that were triggered from ore for rail shortfalls at Yandi, BHP Iron ore has identified a gap in resource knowledge relating to geo-metallurgical characteristics that

    Nov 21, 2018

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • AUSIMM
    Canadian and American Guidelines on Ore Reserve Reporting, and a Comparison with those Proposed for Australia

    By McCarthy J

    In both the U.S.A. and Canada regulations concerning the reporting on mineral resources and especially ore reserves have been established. The regulations are virtually identical for the two countri

    Jan 1, 1987

  • AUSIMM
    A Meso-Scale Column Test for Co-Mixed Tailings and Waste Rock

    By G Johnson, G W. Wilson

    The settlement and drainage behaviour of co-mix, or mixtures of waste rock and tailings, are examined in a column study. Three co-mix profiles were observed for settlement, drainage, and pore water pr

    Jan 1, 2003

  • AUSIMM
    Management of dilution and mining recovery to maximise value

    By R Urie

    Dilution and loss of ore during the mining process invariably occur in all underground mining operations. This dilution and ore loss can have a significant effect on the performance and value generate

    Mar 29, 2023

  • AUSIMM
    Quality programs (QAQC) on Sample Stations – a prerequisite to achieve standards requirements and perform a robust reconciliation

    By O Dominguez

    Mine value chain reconciliation (MVC) is a necessary procedure to evaluate a mine’s performance against the assumptions and models used to plan mining and processing operations. Using nomenclature fro

    Mar 22, 2022

  • AUSIMM
    Developments in Tube Bundle Gas Monitoring

    By M Watkinson

    Tube bundle monitoring systems have come a long way from their first introduction to coal mining in the late 1960s/1970s. Early developments in the United Kingdom (UK) commenced with single gas analys

    Aug 31, 2015

  • AUSIMM
    Modelling of liquid/liquid interface movement during spindle rotation of refractory – slag corrosion test

    By Y Chung, B Choi, H Lee

    Numerous studies have explored refractory corrosion in the presence of slag and/or metal, utilising the Finger Rotating Test (FRT). Recent experimental results revealed that corrosion initially increa

    Jun 19, 2024

  • AUSIMM
    Integrated Dredging Automation

    Most mining dredges are adapted from canal/harbour dredges. Their automation and control systems are generally not designed for integrated mining operations. Consequently they have a number of limitat

    Jan 1, 2001

  • AUSIMM
    A Brief Resume of the Smelting Plant

    THE Company's smelting equipment consists of three blast furnaces, supplied with blast from two sets of vertical piston blowers, each capable of delivering 8000 cub. ft. of air per minute at a pr

    Jan 1, 1918

  • AUSIMM
    Natural Semiconductor Minerals as Visible Light-Induced Photocatalysts Applied for Pollutant Degradation

    By A Lu, C Wang

    The natural semiconducting mineral rutile and sphalerite exhibited highly photocatalytic activities on degradation of methyl orange under visible light irradiation. The isomorphous substitutions of ho

    Jan 1, 2008

  • AUSIMM
    Visualising risk – proactive is better than reactive

    By S Withell, K Sheehan

    Whitehaven Coal (WHC) is undergoing a transformative journey, deeply committed to the principles of a High Reliability Organisation (HRO) and the establishment of a mature, interdependent culture foun

    Apr 16, 2024