Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Public Consultation in Mine Rehabilitation Planning. Morwell Eastern Overburden Dump - A Case StudyBy Eddy B. W, Washusen J. A, Wulff R. T
The State Electricity Commission of Victoria (SECV) has been con- tinuously involved in the extraction of brown coal from open cut mines in Victoria's Latrobe Valley for over 60 years, but have
Jan 1, 1989
-
Fires in Metalliferous MinesAs a number of underground fires have unfortunately happened in the Broken Hill mining district, the writer trusts that a paper dealing with such a subject may prove of interest. To simplify matters,
Jan 1, 1911
-
Improving Health and Safety Through Conveyor System Training in a Virtual EnvironmentBy R Engle, R P. McMahan, D A. Bowman, S Schafrik, W Thabet
Preventing injuries and fatalities related to conveyor system use in the mining industry is important and increases uptime while decreasing lost time. The research presented here is funded by the Nati
Jan 1, 2008
-
Design Parameters for the Central Thickened Discharge Method for Tailings DisposalThe central thickened discharge system of tailings disposal takes advantage of the natural beach slope formed by sub-aerially discharged tailings, and the non-segregating properties of thickened tai
Jan 1, 1991
-
The Role of the Commonwealth Government in Relation to the Mining IndustryThe Australian Constitution specifies certain powers of the Commonwealth Government to be used in its capacity as the national government. Certain of these broad powers result in the Com- monwealth
Jan 1, 1978
-
Dependence of the variance of lot average on the sampling mode and heterogeneity type of the lotBy P Minkkinen
"Pierre Gy showed in his early works that the results in estimating the variance of the mean value of continuous lots depends on sampling mode (random, stratified or systematic), except in the theoret
May 9, 2017
-
Resource and Reserve Calculations - The Experience at BHP-Utah Coal LimitedThe process of evaluating orebodies at the feasibility study stage is extremely important. In recent times many groups have indicated that they would like ore reserve estimation to be numeric and o
Jan 1, 1990
-
Innovative Approach to Open Pit Edge ProtectionBy N Redwood, N Fowkes, A Bassom, S Durkin
"It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat
Nov 15, 2016
-
Perth City Rail Tunnel Project - Overview, Geotechnical Conditions and Building ProtectionBy M Grinceri
The New MetroRail City Project was completed in 2007 in Perth, Western Australia. The project included construction of two underground stations, twin bored rail tunnels of 1.4 km combined length and c
Jan 1, 2008
-
Risk Management of a Gold Heap Leach ProjectOne of the biggest drawbacks of deciding upon a heap leach method of treating gold ore is the risk associated with the full-scale production heaps not performing as predicted by the testwork. This p
Jan 1, 1994
-
Integrating Data, Applications and UsersBy McAuley T. J
Computer software is an integral part of mining operations today with many sites using six or more software packages on a daily basis. However, the use of these different programs generates the need
Jan 1, 1995
-
Metallurgical Factors Affecting the Throughput and Efficiency of Mount Isa Heavy Medium PlantBy Scott IA, Jefferson C, Dipasquale S
This paper describes the use of modelling and simulation techniques in the analysis of the heavy medium plant at the Lead/Zinc Concentrator of Mount Isa Mines Limited. The objective of the study i
Jan 1, 1987
-
Introduction of Trackless Haulage at Long Shaft Kambalda Nickel OperationsBy Eyers G. C
Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production wa
Jan 1, 1988
-
Heritage Conservation of the Big River Mine, Reefton GoldfieldLike almost any other 19th century mining area, the West Coast saw its 20th century scrapping era when machinery which had been installed in seemingly inaccessible places was somehow dragged out again
Jan 1, 1996
-
Introduction of Battery Powered Coal Haulers into Board and Pillar Panel ProductionPowercoal Pty Ltd operates eight underground coal mines in New South Wales and produces coal for both domestic power stations and the export market. Approximately 40% of total production is from conti
Jan 1, 1998
-
Impact of Quartzite Additions on Hot Metal SiliconBy Waters A. G, Nightingale R. J
The quartzite added at the blast furnace for the purpose of adjusting the chemistry of the burden inputs is shown to have a disproportionate impact on both the level and the variability of the hot met
Jan 1, 1994
-
Understanding Tailings Geochemistry - Continuous Learning and Innovation When Planning for Mine ClosureBy N Kawashima, R St C Smart, A M. Robertson
This paper focuses on a case study at a base metal mine located in a tropical semi-arid area of Western Australia (WA). It is demonstrated that understanding the geochemical nature of the mine tailing
Jul 10, 2012
-
A Method of Assessing the Efficiency of Powered Supports in ServiceBy Bigdy D. N
The paper describes a system for providing mine management with a continuous indication of the effectivness of longwall coalface powered supports in controlling roof-to-floor convergence. The syst
Jan 1, 1988
-
Unconventional Use of the Subsurface, Illustrated by Examples from the Nordic CountriesIn the hard rocks of the Nordic countries of Norway, Sweden and Finland underground works have a long tradition. Today the subsurface has been taken into use for a wide variety of purposes. In thi
Jan 1, 1987
-
Overview of the White Rock Tungsten Deposit, New South WalesBy G D. Carman
White Rock is a reduced tungsten-tin skarn deposit near Rye Park, New South Wales. This abstract summarises the depositÆs mining and exploration history, and current exploration by Paradigm Metals Ltd
Jan 1, 2008