Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Filtered tailings – an iron ore experience

    By L Vimercati, R Williams

    Transitioning to a green future requires the mining industry to adopt sustainable practices. Filtered tailings are become a key expectation of the communities we operate in and are growing in a number

    Sep 18, 2023

  • AUSIMM
    Data Metallogenica ù Around the Pacific Rim and Across the World

    By A D. T Goode

    Data Metallogenica (DM) is unique as a global mineral sample collection and deposit database with over 70 000 rock samples and a wide range of descriptive, photographic and measurement data. Subscribe

    Jan 1, 2004

  • AUSIMM
    Ventilation and Refrigeration Design for the Access and Ore Production Decline to the Deep Copper Orebody at the Mount Isa Mine

    By Nixon C. A

    The exploration of Mount Isa Mines' new copper source will require the development of a five kilometre 4.7 x 5.5 metre blind decline commencing 1000m below the surface and extending to 1600m

    Jan 1, 1988

  • AUSIMM
    Cover Grouting for Development Headings at The Jarrah Decline, Boddington Gold Mine

    Jarrah Decline is currently the only underground operation at the Boddington Gold Mine, (BGM). The mine is located 120 km SE from Perth in WA, with mineralisation hosted within deeply weathered felsi

    Jan 1, 1990

  • AUSIMM
    Methodology for Selecting Borehole Samples of Iron Ore for Mineral Processing Characterisation

    By G J. I dos Santos

    The risk assessment of mining projects is directly related to the possible failure in estimating, and as estimates are made from sampling results, this activity should be done in a judicious and plann

    Jul 11, 2011

  • AUSIMM
    On-site Process Mineralogy – Linking Departments and Disciplines with the Common Goal of Increasing Plant Performance

    By D Morgan, K Jones

    "In March 2015 Northparkes Mines (NPM) installed a process mineralogy facility on-site. The laboratory included a TESCAN TIMA scanning electron microscope (SEM) and was the first SEM facility to be co

    Oct 10, 2016

  • AUSIMM
    Preparing for Uncertain Mineral Futures - A Survey of AusIMM Members on the Future Issues and Drivers for the Australian Minerals Industry

    By C Mason, A Littleboy

    This paper presents the results of a large scale survey of The Australasian Institute for Mining and Metallurgy (AusIMM) membership. This survey aimed to understand and define the key issues and drive

    Jan 1, 2009

  • AUSIMM
    Grade Control in the Southern Middleback Ranges ù A Case Study

    By G Solly, S Parsons, P Leevers, S Ni

    Hematite ore has been mined in the Southern Middleback Ranges as blast furnace feed for the steelworks at Whyalla, by what was then BHP, since 1991. With the floating of BHP Integrated Steel as OneSte

    Jan 1, 2005

  • AUSIMM
    The Effect of Seasonal Variations on the Performance of Mineral Processing Plants – A Case Study of Deposit-10/11A Mine of NMDC Ltd

    By S Das

    Deposit-10/11A is situated in the iron rich Bailadila region of India comprising haematite ore of average grade 65 per cent Fe. The deposit production line was commissioned in the year 2002 having a c

    Jul 11, 2011

  • AUSIMM
    Blasting Harmonics and Controlling Peak Particle Velocity

    By T J. Laing, A B. Richards, A J. Moore

    Blastholes fired in a pattern with a constant initiation delay create a frequency in the ground vibration similar to that from a percussion instrument, such as a drum, in the air. A constant firing de

    Aug 24, 2015

  • AUSIMM
    Implementation of an Advanced Milling and Flotation Control System at Mopani Mufulira Copper Mine

    By B E. De Gee, N Viviers, A Naidoo

    In 2013 the Mopani Copper Mine Mufulira plant in Zambia embarked on a project that was aimed at improving concentrator recoveries. The project commenced with the automation of the milling and flotatio

    Sep 1, 2014

  • AUSIMM
    Discovering New Orebodies - Creation of an Exploration Database, Morning Star Gold Mine, Victoria

    By Kentwell D. J, Cusak C. J, Harvey-Kelly F. E L, M D. Goodz

    The Morning Star Gold Mine presents an example of a prolific operation with considerable historical records, mine workings, drill hole logs and countless plans from greater than 20 adjacent mines wh

    Jan 1, 1997

  • AUSIMM
    Implementation of Acoustic Arrays for Semi-autogenous Grinding Mill?Operation

    By R Wynn, R A. Pax, S Mann, B Cornish

    The semi-autogenous grinding (SAG) mill at the MMG Century operation has failing load cells that are essential to the control strategy used to stabilise the mill. Currently, mill-bearing pressure is u

    Sep 1, 2014

  • AUSIMM
    "Sampling and Test Work Protocol Development for Geometallurgical Characterisation of a Sheeted Vein Gold Deposit"

    By Y Xie, L O’Connor, S C. Dominy

    "Sheeted vein gold deposits are characterised by multiple subparallel veins and free milling gold. In situ heterogeneity of mineralisation results in grade and process parameter variability, which wil

    Jun 15, 2016

  • AUSIMM
    Problems of the Slurry Shield Method and Their Counter Measures

    This paper first describes the essentials of the slurry shield method and its achievements, then problems encountered during driving tunnels and their countermeasures, and finally shows problems t

    Jan 1, 1976

  • AUSIMM
    Thiosulfate Process for Treating Gold Concentrates

    By P Breuer, X Dai, A Bergamin, D Hewitt

    "Copper-ammonia-thiosulfate?leaching of gold has been researched for several decades as a potential alternative to cyanidation. However, this technology has not yet been applied commercially due to ma

    Sep 26, 2013

  • AUSIMM
    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Sep 13, 2010

  • AUSIMM
    The Lake Rotokaua Sulphur Deposit

    The Lake Rotokaua sulphur deposit, near Taupo, New Zealand, is a lacustrine sedimentary ore body, 220 acres in area and from 7 ft to 96 ft thick, containing, within the area drilled to date, some 20

    Jan 1, 1971

  • AUSIMM
    The Development and Operation of a Continuous Tapping Lead Blast Furnace at Port Pirie

    On the 17th November, 1964, a new No., 2 lead blast furnace was blown in at Port Pirie. The furnace departed from previous designs by incorporating a centrally located continuous tapper for both l

    Jan 1, 1975

  • AUSIMM
    The High Productive Operation of a Small Blast Furnace

    By Fukui M

    An increase in pig iron output by 50 per cent was aimed at after re-lining No.2 blast furnace of NAKAYAMA STEEL WORKS. This had to be achieved by increasing both the furnace volume (from 673 to 757

    Jan 1, 1980