Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final Design

    By E C. F Hamman

    Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock

    Jan 1, 2007

  • AUSIMM
    Improving stope extraction in the Hidden Secret orebody at Mt Charlotte Gold Mine

    By B Lance, D O’Brien

    The Hidden Secret ore body is located within the Mt Charlotte underground mining system in Kalgoorlie, Western Australia. Mineralisation of the Hidden Secret ore body is lode style and therefore diffe

    Mar 15, 2021

  • AUSIMM
    Vibration control blasting for low stability final walls

    By G Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Nov 30, 2018

  • AUSIMM
    Collaboration and change management, keys to successful automation implementation

    By D Kilkenny, D Nardini, P Kline

    This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate

    Mar 15, 2021

  • AUSIMM
    Design and testing of high capacity surface support

    By T Roberts, S Talu

    Steel wire weld mesh is a common industry standard surface support used in underground mining, traditionally installed with mining drills during the bolting cycle. As underground mining depth and stre

    Nov 30, 2018

  • AUSIMM
    Development of a Predictive Geometallurgical Recovery Model for the La Colosa, Porphyry Gold Deposit, Colombia

    By S Leichliter

    La Colosa, Colombia is a large gold-porphyry deposit currently undergoing feasibility studies by AngloGold Ashanti. This period of development allows the opportunity to apply innovative and emerging t

    Sep 5, 2011

  • AUSIMM
    An initial review of conceptual alternative layouts for production areas in Kiirunavaara mine

    By F K. Altuntov

    The study presented in this paper is based on the Kiirunavaara underground mine located in the northern part of Sweden. The deposit is mined using the sublevel caving (SLC) mining method. This paper b

    Mar 29, 2023

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    Practical measures of process efficiency and opportunity

    By G R. Ballantyne, A N. Mainza, M S. Powell, M Evertsson

    Quantifying the performance of a comminution circuit relative to the potential that can be achieved is a standard requirement in justifying operating practice (the stick) and seeking operational upsid

    Aug 24, 2022

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Effects of Shear on the Behaviour of Polymer-treated Slurries

    By D Reid, A Fourie

    The in-pipe treatment of slurries with polymer addition shortly prior to deposition is a noteworthy emerging technology of increasing popularity. Although polymer treatment has been shown to substanti

    Jul 27, 2015

  • AUSIMM
    Driving Haulage Productivity Improvements through Industry–Academia Collaboration

    By R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch

    "The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e

    Nov 15, 2016

  • AUSIMM
    Improving the Performance of Precipitator Tanks in an Alumina Refinery Using CFD Modelling

    By A Manzoori, M T. Shadloo

    This paper describes a CFD modelling study which was carried out to investigate possible improvements in the design of an alumina precipitator tank at the Jajarm plant of Iran Alumina Company. In part

    Jan 1, 2006

  • AUSIMM
    Mine to mill study – Bond Work index as factor for intrusive and non-intrusive rock type

    By W F. E Ouedraogo

    This study data has been collected on a three-month period from November 2020 to January 2021 and based on three different pits: Vindaloo Main, Vindaloo Central and Bouere. Both pits having specific g

    Jun 22, 2022

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    Support Performance Prediction for Hydraulic Fills

    By Hill J. R M, McDonald M. M

    A prediction technique for support perfor- mance of hydraulic backfill in narrow stopes is applied to two stopes separated vertically by a sill pillar. Predicted stope wall closures and fill pressu

    Jan 1, 1973

  • AUSIMM
    Project Selection and Process Development for Mining Juniors

    By L Lorenzen, H Muller

    "Every year a large number of projects are evaluated by small listed and unlisted mining companies that are hoping to find the ideal project, which will catapult them from a mining junior status to th

    May 24, 2012

  • AUSIMM
    A Review of Processing at the Cannington Ag/Pb/Zn Mine

    By G Clarke

    Commissioning of the Cannington processing plant began in October 1997. The nameplate capacity (of 1.55 million tonnes of ore per annum) was achieved relatively quickly. Since then (like many mines) t

    Jan 1, 2007

  • AUSIMM
    Testing and quantifying geological uncertainty (or a gram of drill data is worth a kilogram of geological interpretation)

    By M P. Murphy, C M. D Barton

    When developing a new underground mine, the geological interpretation that guides the mineral resource is crucial to the preparation of a reliable ore reserve. In preparing a robust geological model t

    May 24, 2023

  • AUSIMM
    Study of the Adsorption of Metal Ions onto Pyroxene

    By V Malysiak, N J. Shackleton

    In the flotation of platinum group minerals pyroxene is a major gangue mineral. This study shows using zeta potential and ToF-SIMS analyses that when pyroxene is exposed to copper, nickel and/or calci

    Jan 1, 2005