Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Planning for underground mining at Savage River Iron Ore Mine

    By U Singh

    This paper presents the evolution of the studies and strategic plans to extend the life of operations at the Savage River iron ore project in north-western Tasmania. The current Life-of-Mine (LOM) pla

    Mar 29, 2023

  • AUSIMM
    Autonomous Haul System Savings – It’s Not about Less Truckies but Better Truckies!

    By R Price, B H. Miller

    "The rise of autonomous haul truck fleets may have been initially driven by the rapid escalation of the cost of equipment operators, but the actual improvements reported by the major iron ore miners f

    Nov 15, 2016

  • AUSIMM
    Surface Mining and Legacy Mining Communities in South Wales, UK

    By R N. Humphries, R J. K Thompson

    Large-scale coal mining in South Wales dates back to the late 18th and early 19th centuries with the birth of ironmaking on an industrial scale. This rapidly gave rise to new and large communities wit

    Jul 16, 2014

  • AUSIMM
    New tools for ground control in freeze shaft sinking

    By J Franz, S Bock, N Hentrich

    Artificial ground freezing is the unrivalled method for groundwater control during mine shaft sinking. Moreover, ground freezing may also provide temporary ground support. The fast development of fibr

    Nov 30, 2018

  • AUSIMM
    Preconcentration at Mt Carbine Tungsten Mine using sensor-based ore sorting

    By R Kroukamp, G Rech

    CRONIMET Australia in cooperation with Speciality Metals International, the mining lease holder of the Mt Carbine Tungsten mine, have demonstrated the preconcentration and processing of large (>12 mil

    Nov 10, 2020

  • AUSIMM
    Analysis of Twin Road Tunnels Using Numerical Modelling Techniques

    By D R. Wines

    The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi

    Mar 8, 2011

  • AUSIMM
    AGL Energy, Loy Yang and GHD – a Further Case Study in Alliancing: Ten Years on

    By J Missen, P Currie, J Bohan, D Clark

    AGL is one of Australia’s leading integrated energy companies and the largest ASX listed owner, operator and developer of renewable energy and thermal generation in the country. AGL owns and operates

    Jun 22, 2016

  • AUSIMM
    Processing of Magnetite Iron Ores - Comparing Grinding Options

    By A Jankovic, D David, P Payne

    Although the majority of current steel production is supported by iron ore sourced from high-grade haematite deposits, the long-term growing demand for steel has led to higher raw material prices and

    Jan 1, 2009

  • AUSIMM
    Beyond NPV - A Review of Valuation Methodologies and Their Applicability to Water in Mining

    By D Brereton, C J. Moran

    In this era of rising focus on the social and environmental costs and benefits of mining operations, the valuation methodologies used to assess such impacts become increasingly important. Within an in

    Jan 1, 2006

  • AUSIMM
    Introduction of Electric L.H.D.Æs at Rosebery Engineering Aspects

    Production implications of the introduct- ion of electric L.H.D. units in sublevel open stoping and pillar recovery at Rosebery are covered by Faulkner (1982) and Carlton (1982). The following engin

    Jan 1, 1982

  • AUSIMM
    Mineralisation Styles and Geochemistry in the Paddy's Flat Gold District, Meekatharra, Western Australia

    By Kavanagh M. E, Henley R. W

    The Meekatharra mining district lies in the northern pan of the Murchison Province of the Archaean Ynlgam block of Western Australia. Since dis- covery of the Paddy's Flat belt in the district i

    Jan 1, 1991

  • AUSIMM
    Iron Ore Geometallurgy – Examining the Influence of Ore Composition on Sinter Phase Mineralogy and Sinter Strength

    By M I. Pownceby, N A. S Webster, J Manuel, N Ware

    The properties of iron ore sinter – commonly defined by measures of tumble strength, reduction degradation and reducibility – have a major impact on blast furnace performance. These properties are lar

    Jul 13, 2015

  • AUSIMM
    Footwall Stability at the LKAB's Kiruna Sublevel Caving Operation, Sweden

    By C DahnTr-Lindqvist

    The Kiruna mine produced about 19 Mt processed iron ore in 1999 using sublevel caving. General failure in the hangingwall has been widely studied and its mechanism is rather well understood. Failure i

    Jan 1, 2000

  • AUSIMM
    Metal Allocation and Grade Control at Kambalda NIckel Mines

    The nickel operations at Kambalda consist of mining thin massive to disseminated Ni sulphide orebodies from 10 individual mines of variable grade.Daily sampling involves visual estimation of the grade

    Jan 1, 1990

  • AUSIMM
    Wireless System for Monitoring Cave-back Propagation

    By S Steffen, S Talu, J Poulsen, G Watt, A van As, J S. Ooi

    The economic success of cave mining projects is significantly influenced by the secondary fragmentation size distribution of the caved orebody and making the fragmented ore available for extraction. I

    May 9, 2016

  • AUSIMM
    The Canadian Experience ù Disclosure Standards for Mineral Projects

    After considerable input from the mining industry, the Canadian Securities Administrators (CSA) finalised National Instrument 43-101: Standards of Disclosure for Mineral Projects. This Instrument, whi

    Jan 1, 2002

  • AUSIMM
    Copper Converter Slag Treatment at Mount Isa Mines Limited, Mount Isa, Qld

    By Hare S. M, Lumsdaine I, O&apos

    Converter slag assaying 3.7 per cent Cu is produced by Mount Isa copper smelter at a rate of up to 180 000 tonnes per annum.Priority is given to the processing of ore, however concentrator capacity pe

    Jan 1, 1993

  • AUSIMM
    Methane Explosions at High Volume and Low Concentration

    The most frequent initiation of coal dust explosion results from the ig- nition of high methane volumes, often at low concentration close to the minimum flammability limit, by a weak ignition sour

    Jan 1, 1988

  • AUSIMM
    Recovery of Iron Ore Fines and Ultrafines from Tailings by Using Wet High-intensity Magnetic Separation – JONES WHIMS

    By M Gerards, M Steinberg, T Graham

    The quality and quantity of Australia’s secondary deposits, which include tailings streams and tailings dams, are higher than most countries’ primary deposits. In addition, these secondary deposits ha

    Jul 13, 2015