Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Geology of Kalgoorlie

    CHAPTER 1 - GENERALIn the introduction to this chapter a general account is given of the growth of the mining industry in Western Australia from J88G, when the output of gold for the whole State was o

    Jan 1, 1912

  • AUSIMM
    Proactive Measures for Fatality Prevention in the Mining Industry ù Why Fatalities Persist While Lost Time Injuries Decline

    The traditional measure of Lost Time Injury Frequency Rate (LTIFR) as a measure of improvement in safety performance is recognised as inadequate and misleading, lulling managers into believing that sa

    Jan 1, 2003

  • AUSIMM
    Gold Recovery on the Shotover River

    Gold was first discovered on the Shotover by Thomas Arthur in 1862, and soon there were over 3000 miners working on the river. It has often been called the richest river in the world. Most countries p

    Jan 1, 1983

  • AUSIMM
    Evaluation of Crown Pillar Burst Potential in Cut-and-Fill Vein Mining

    By J M. Marwan, B Tang

    Strain-type rockbursts, or strainbursts, are characterised by a localised violent failure. Their cause is attributed primarily to the sudden release of strain energy, which accumulates in a volume of

    Jan 1, 2001

  • AUSIMM
    Update on Precious Metals in Deep Geothermal Waters of the Taupo Volcanic Zone (TVZ)

    By K L. Brown

    Sampling and analyses of deep waters from Wairakei and Rotokawa geothermal systems indicate a wide range of precious metal concentrations (<0.1 to 23 ppb Au; 6 to 2400 ppb Ag), suggesting that east

    Jan 1, 2006

  • AUSIMM
    The Resource Management Act 1991, Where to From Now?

    By J Morton

    The Resource Management Act 1991 represented an innovative and unique piece of planning and environmental legislation when it was introduced. Since the Act was passed into law in 1991 it has been subj

    Jan 1, 2004

  • AUSIMM
    Criteria for the Design of Emergency Refuge Stations for an Underground Metal Mine

    By G P. Bates

    The rationale for the design of the Emergency Egress (escape andentrapment) strategy for one underground metal mine has beenpreviously described (Brake, 1999). Two of the key conclusionsfor this mine,

    Jan 1, 1999

  • AUSIMM
    Fractals and Spatial Geometry - An Application to Veins in the Otago Schist

    Most people are familiar with Euclidean dimensions: zero for a point; one for a line; two for a plane; and three for a volume. Howeverbobjects are not actually Euclidean, but lie somewhere between Euc

    Jan 1, 1992

  • AUSIMM
    Environmental Investigations and Procedures to Support Mining Consent Applications

    By M Foster

    The new environmental legislation of 1986 was left incomplete and to date remains so. The 'missing' process by which environmental consideration should be applied was never embodied in law a

    Jan 1, 1988

  • AUSIMM
    Increased Productivity through Short-Term Scheduling and Management Operating Systems at the Hilton Mine

    By A Clark

    When production targets are not being reached it is essential to determine what the operating problems are so that remedial action can be taken. It is also imperative that all persons who are part of

    Jan 1, 1998

  • AUSIMM
    The Practice of De-Silverizing Base Bullion at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    THE de-silverizing of base bullion at the Port Pirie works is carried out in accordance with the principles of the well-known Parkes process. The base bullion produced by the blast furnace department

    Jan 1, 1922

  • AUSIMM
    Interpreting the Story of the Mining Landscape - Using Geotourism for Sustainable Community Development (cb7e1858-6c7d-4615-9ebd-70f3f9d5c5cc)

    Landscape interpretation, geology and mining history is being successfully used to explore options for sustainable community tourism product development. Recent work by the author in Europe and Austra

    Jun 1, 2010

  • AUSIMM
    Silver and Tin Distribution between Copper Matte and Fayalite Slag

    By D R. Swinbourne, T Lehner

    Study of the distribution of minor elements between copper matte andfayalite slag is important in determining appropriate methods tomaximise the recovery of valuable metals and the rejection of harmfu

    Jan 1, 1999

  • AUSIMM
    Planning of Open Cut Mining

    The increased cost of imported oil fuels, coupled with our understandable reluctance to commit ourselves to the use of nuclear energy, has resulted in a renewed reliance on coal as a primary source of

    Jan 1, 1976

  • AUSIMM
    Gold Concentrations at Waiotapu Geothermal Area and Deposition in Geothermal Systems

    By K L. Brown

    In the Waiotapu geothermal area only Champagne Pool, 109 ng/L, and Waiotapu Geyser, 7.6 ng/L, have dissolved Au concentrations greater than 5 ng/L and most springs have concentrations less than 2 ng/L

    Jan 1, 2004

  • AUSIMM
    Lithospheric Footprints of Giant Orogenic Gold Systems

    By R J. Goldfarb, A B. Christie, D I. Groves

    Small orogenic gold deposits have the same deposit-scale geological and geochemical features as those that characterise giant orogenic gold systems (>16 Moz Au). Therefore, a broader-scale approach

    Jan 1, 2005

  • AUSIMM
    The Role of Flash Flotation in Reducing Overgrinding of Nickel at WMCÆs Leinster Nickel Operation

    By J McQuie

    The concentrator at WMCÆs Leinster Nickel Operation has operated with flash flotation in the grinding circuit since the early 1990s. There has always been a positive correlation between flash flotatio

    Jan 1, 2005

  • AUSIMM
    Optimum Equipment Management Through Life Cycle Costing

    Large mining operations need equipment that consistently performs as expected. The most effective way of ensuring this is to have a defined life cycle with an optimised maintenance strategy. The deter

    Dec 6, 2010

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • AUSIMM
    Residence Time Distribution for a Cold Model Rotary Kiln

    By M O. Tade, M W. Sze

    The particle dynamics of a mixture of coal and zircon system wasstudied in a scaled-down cold model of an industrial kiln. Thefactors investigated in the study were rotational speed (N),zircon-to-coal

    Jan 1, 1998