Search Documents

  • AUSIMM
    Management of Technical Risk for the Ravensthorpe Nickel Project

    By R Fury, I Skepper, D White, G Miller

    Although the Pressure Acid Leaching (PAL) of nickel laterites has been conducted at Moa Bay, Cuba, since the early 1960s, the commissioning delays generally encountered by the æsecond generationÆ of P

    Jan 1, 2004

  • SME
    Application of Dot Tunneling Method to Construction of Multi¬service Utility Tunnel Adjacent to Important Structures

    By Akihiro Higashide, Roy H. Patten

    The DOT Tunneling method combines two conventional earth pressure balance shield machines in an overlapping cylindrical arrangement. The method allows two tunnels to be driven simultaneously with mini

    Jan 1, 1995

  • SME
    Performance Of The Lorraine Mine Site Cover To Limit Oxygen Migration

    By Bruno Bussière, Michel Aubertin, Anne-Marie Dagenais, Johanne Cyr

    A five steps remediation program was commissioned in 1998 for the acid generating Lorraine mine site, located in the Témiscamingue region, Quebec, Canada. It included, as the main expenditure, a cover

    Jan 1, 2005

  • ISEE
    High Resolution Seismic Refractin Temography for Determining Depth of Blast Induced Damage in a Mine Wall

    By J A. Singer, S R. Iverson, C A. Link

    High resolution seismic refraction tomography has proved to be a useful tool to effectively estimate depth of blast induced damage in a mine face. Excavation blast damage can be as shallow as 1 to 2m

    Jan 1, 2009

  • ISEE
    3D Computer Simulation of Bench Blasting with Precise Delay Timing

    By Dale S. Preece

    "Detonation delay timing has been an important aspect of quality rock blasting for decades. Detonators that enable delay timing have improved over the years especially with the recent advent of precis

    Jan 1, 2009

  • DFI
    Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USA

    By P. B. Kelleher

    Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,

    Jan 1, 1989

  • AUSIMM
    Manganese Recovery from Tyrrhenian Nodules by Hydrometallurgical Treatment

    By D Pilone

    The Tyrrhenian micro-nodules, findable at low depths (200/600 m under s l) are a reasonable reserve of manganese. They can be easily and cheaply recovered but do not contain valuable metals as in the

    Jan 1, 2000

  • AUSIMM
    The exploration history, geology and metallurgy of a High Sulphidation Epithermal gold deposit at Wafi River, Papua New Guinea

    By Lewis PJ, Halfpenny R, Craighead GA

    Exploration drilling by Joint Venture partners CRA Exploration Pty Ltd and Elders Mining PNG Pty Ltd has discovered a signif- icant copper and gold deposit at the Wafi River prospect, 60km WSW of L

    Jan 1, 1991

  • AUSIMM
    Application of Ultrafiltration and Reverse Osmosis for Mine Wastewater Reuse

    By J Wei, A Yo, R Levy

    Waste water reuse from municipal and industrial effluents is becoming increasingly important in many areas around the world. Water scarcity, local regulation and environmental impact are driving many

    Jan 1, 2009

  • AUSIMM
    Effect of Lattice Impurities on Electronic Properties and Surface Adsorption of Sphalerite - A Density-Functional Theory Study

    Effect of Lattice Impurities on Electronic Properties and Surface Adsorption of Sphalerite - A Density-Functional Theory Study

    Sep 13, 2010

  • ISEE
    Visualization of Cratering in an Underwater Environment

    By D. J. Goodings, R. J. Bonenberger, H. U. Leiste, W. L. Foumey

    This paper describes a series of two-dimensional tests conducted and filmed with a high-speed (500 frames per second) video camera. The purpose of these tests was to provide a better understanding of

    Jan 1, 2000

  • AUSIMM
    Pit Water Management in a Mine Planning Cycle, Olympic Dam Case Study

    By D Barclay, S Mercer, S Wright

    Mine water management is often an afterthought in mine planning processes and can introduce significant risks to projects when studied as a stand alone component at a later stage in the mine design. I

    Jan 1, 2009

  • AUSIMM
    A Geological Model for Gold Mineralisation at Reefton, New Zealand

    By G J. Corbett, P Magner, M McKenzie

    Structures formed during ductile deformation have been reactivated during the later brittle mineralisation process. Two generations of folding are classified as: early recumbent megascopic FI folds an

    Jan 1, 1997

  • SME
    Utilization Of Belt Air To Ventilate Working Sections In Underground Coal Mines

    By F. Calizaya

    This paper describes the basic requirements for the utilization of belt air to ventilate working sections at remote locations in relation to the main fans. It highlights the risks involved, potential

    Jan 1, 2008

  • AIME
    Reservoir Engineering - General - Three-Phase Reservoir Simulation

    By E. H. Herron, J. H. Perry

    Mathematical simulation of reservoir behavior may be used to help understand reservoir processes and to predict reservoir behavior, thereby leading to the most economically desirable form of exploitat

    Jan 1, 1970

  • SAIMM
    Bindura Nickel Smelter - From Decommissioning, Care And Maintenance, To Plant Re-Start

    By A. Mboma

    Keywords: Furnace, decommissioning, care and maintenance, re-start, funding, nickel Bindura Nickel Corporation (BNC) operates two nickel mines, and treats concentrates from these mines as well as

    Jan 1, 2011

  • NIOSH
    Enhanced Surface Control For Roof And Rib Support

    By Stephen C. Tadolini, Dennis R. Dolinar

    The risk of injury caused by minor roof falls continues to increase in underground mining. Most ground control injuries result from small rock falls that occur in a supported area, but do not involve

  • AUSIMM
    The Aberfoyle Vein System Rossarden, Tasmania

    The Aberfoyle Tin Mine lies on a wide sloping bench about 2,000-2,500 ft. above sea level, at Rossarden, 14 miles north of Avoca, in north-eastern Tasmania. The quartz-cassiterite veins were discovere

    Jan 1, 1957

  • SME
    L-73 Tunnel, Woodbury, Minnesota

    By Michael B. Gilbert

    The Woodbury L-73 Tunnel involved the design and construction of a 96-inch tunnel driven through 8,080 lf of very difficult ground conditions. Anticipated ground and groundwater conditions consisted o

    Jan 1, 2008

  • SME
    Hydrogeologic Characterization and Mining Impact Analysis of a Low-Yield, Fractured Granite Mining, Metallurgy and Exploration (86a3e080-80de-4150-963a-4695a76dda43)

    By Michael Day, Paul Kos, Scott Brinton

    A hydrogeologic characterization and impact analysis was performed for a proposed quarry at the Hitch Rack Ranch located in the Little Turkey Creek watershed southwest of Colorado Springs, Colorado. C