Search Documents

  • CIM
    A Benchmarking Tool for Assessing Flotation Cell Performance

    By Jan E. Nesset, James A. Finch, Wei Zhang

    "Bubbles are unquestionably the heart of the flotation process. Their size and combined surface area are largely what drive the recovery process. This suggests that plant engineers should be aware of

    Jan 1, 2012

  • AUSIMM
    Capital and Operating Cost Eestimation for Open Pit Mining Equipment

    Background information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c

    Jan 1, 1990

  • AUSIMM
    Comparative evaluation of manual sampling and Outotec MSA 2/50 metallurgical slurry sampler

    By J Loimi, P Minkkinen, T Korpela

    The head loss caused by metallurgical sampling for slurry streams can be reduced by metallurgical sampler design. When the process volumetric flow rate is reduced by vertical static cutters before the

    May 9, 2017

  • SME-ICGCM
    Comparison Of Predictions And Measurements Of Subsidence Caused By Underground Mining In Northern Appalachia

    By H. J. Siriwardane

    This paper presents results from three case studies involving longwall mine panels at which the measured ground movements were compared with the numerical model predictions based on the finite element

    Jan 1, 1988

  • DFI
    Ground Support for Shafts and Underground Construction Using Artificial Ground Freezing – Sophia Spoortunnel Rotterdam (Nl) – Cern Geneva (CH) – Leipzig (DE) – Berlin (DE)

    By Helmut Hass, Marco Ziller

    "Abstract: 1 Sophia Spoortunnel Marco Ziller, Trevi S.p.A.:For the construction of 14 cross passages connecting the twin tunnels of the Sophiaspoortunnel the Artificial Ground Freezing technique was a

    Jan 1, 2014

  • CIM
    The Upgrading of Primary Gold Gravity Concentrates

    By Bryn Harris, Liming Huang, Andre Laplante

    "This paper reviews flowsheets generally used in gold rooms to upgrade primary gravity concentrates particularly those of Knelsons. It is concluded that even for small operations, which treat between

    Jan 1, 1999

  • AUSIMM
    Shaft Excavation Using the Borehole Rising Method

    This paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of

    Jan 1, 1959

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • SME
    Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill Grout

    By Lorenzo Pellegrini

    The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and

  • SME
    New Opportunities for Energy Development on Indian Reservations

    By Daniel H. Israel

    Indian tribes own a substantial portion of the West's minerals. More importantly, Indian reservations contain coal, oil and gas, uranium, and oil shale reserves in unusually large and unencumbere

    Jan 6, 1980

  • AUSIMM
    Hydrometallurgical Extraction of Tungsten from Low Grade Residue Dumps

    The alkaline ethylenediamine tetra-acetic acid (EDTA) leach process for extracting tungsten from scheelite (CaW04) ores has been examined for the treatment of low grade (<0.5 per cent WO,) residue

    Jan 1, 1983

  • SAIMM
    Development And Implementation Of An Electrically-Powered Stope Rockdrill For Tautona Mine - Synopsis

    By A van Jaarsveld

    Environmentally-friendly, safe and cost-effective technology for stope drilling has successfully been introduced at TauTona mine. It has enabled the problem of inadequate compressed air pressure and i

    Jan 1, 2008

  • SME
    Challenges In CFD Modeling Of Air Flow In Open-Pit Mines

    By K. V. Raj

    In the mining industry, computational fluid dynamics (CFD) modeling is used extensively to simulate air flow in underground mines. CFD modeling of pollutant transport in open-pit mines is relatively n

    Feb 27, 2013

  • SME
    A Tale Of Two Pit Lakes: Initial Results Of A Three-Year Study Of The Main Zone And Waterline Pit Lakes Near Houston, BC

    By G. Lawrence, R. Pieters, A. Leung, T. Pedersen

    The Main Zone and Waterline pit lakes at the Equity Silver Mine near Houston, BC (Canada) are the sites of a new 3-yr research program with three primary goals: 1) understanding controls on metal con

    Jan 1, 2002

  • DFI
    The Effects Of System Components On The Deflection Of MSE Retaining Walls

    By Scott C. Vollmer

    This paper seeks to examine some of the technical factors influencing the deflection of Mechanically Stabilized Earth (MSE) retaining walls based on the authors' field observation of numerous str

    Jan 1, 2003

  • DFI
    Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - Introduction

    By Michael W. Neill, O&apos

    The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec

    Jan 1, 1989

  • DFI
    Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - Summary

    By William D. Spielvogel

    The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t

    Jan 1, 1994

  • NIOSH
    IC 8689 Basic Estimated Capital Investment And Operating Costs For Underground Bituminous Coal Mines - Mines With Annual Production Of 1.03 To 3.09 Million Tons From A 48-Inch Coalbed - Revision Of Information Circular 8641

    By Sidney Katell

    This Bureau of Mines study estimates capital investment, operating costs, and selling prices for three underground bituminous mines producing coal with annual production ranging from 1.03 to 3.09 mill

    Jan 1, 1975

  • SAIMM
    Evaluation of floor heaving in galleries by numerical analysis

    By M. Yavuz, M. Aksoy, G. Once, M. Iphar

    This paper is concerned with a study on the floor heaving in the transport road of the GLI Omerler Colliery in Tuncbilek-Turkey. This gallery has been opened at the depth of 200 m through the formatio

    Jan 1, 2003

  • SAIMM
    Sonic injection into a PGM Peirce-Smith converter: CFD modelling and industrial trials

    By G. A. Bezuidenhout, J. P. T. Kapusta, D. K. Chibwe

    "Peirce-Smith converters (PSCs) are extensively used in the copper, nickel, and platinum group metals industries. The typical converting operation involves lateral purging of air into molten matte thr

    Jan 1, 2015