Search Documents

  • AUSIMM
    The Fall and Rise of the Feasibility Study

    The theme of this paper is the development of-the project feasibility study which includes discussion of the work which is carried out in preparing the project feasibility study, the necessary eval

    Jan 1, 1990

  • SME
    Main fan energy management

    South Africa?s primary electricity supplier, Eskom, provides incentives to reduce power demand during critical times by granting capital through a Demand Side Management programme. DSM encourages the

    Jan 1, 2009

  • AUSIMM
    A Review of Best Practice in Gravity Circuit Design and Operation

    By A Bax, G Wardell-Johnson, A Giblett, W Staunton

    This paper presents a number of key considerations for process development testwork as a reliable basis for the inclusion of gravity separation in gold recovery flowsheets. Operating data, experiences

    Jul 15, 2013

  • IIMP
    Solutionizing - Soluciones en sistemas de aire comprimido

    By Javier Támara

    Para aumentar la productividad de la empresa minera es necesario conocer el sistema de aire -en tanto se prioriza los intereses de los clientes, y así se puede suplir todos los componentes necesarios

    Aug 25, 2002

  • DFI
    Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? Synopsis

    By G. Price

    The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less

    Jan 1, 2010

  • SME-ICGCM
    Roof Control In Longwall Faces - Geological And Geotechnical Characteristics And IT Solution For Prediction (50d59152-95b6-444a-a8f2-4ae0c4262f3f)

    By Holger Witthaus

    Various seam conditions had been examined during longwall production at RAG German hard coal mines. Based on the field data a prediction method was developed considering separation planes as influenci

    Jan 1, 2009

  • ISEE
    Determination of Blast Vibration Limits by Direct Strain Measurement

    By Adrian Moore, Alan Richards, Andrew Brodbeck

    Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str

  • CIM
    Towards a Better Understanding of Stirred Milling Technologies - Estimating Power Consumption and Energy Use

    By Jonathan Allen, Peter Radziszewski

    "Stirred mill technology dates back to 1928 where the idea to use “an agitator and spherical grinding media” was presented. The year 1948 saw the successful application of DuPont’s “sand mill” for pig

    Jan 1, 2014

  • CIM
    A New Potential Standard in Monitoring and Optimizing Deposit Control in Mining Process Waters

    By W. J. González

    "With the increasing demand for minerals, technologies to maximize mineral recovery are paramount to a mine’s economic success. Many mining process waters have the potential to form calcium-based inor

    Jan 1, 2014

  • DFI
    New Possibilities for Quality Assurance of Diaphragm Wall Joints

    By Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider

    "Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc

    Jan 1, 2014

  • NIOSH
    RI 6014 Composition And Mechanical Properties Of Selected Cold-Mold And Skull-Cast Titanium Alloys ? Summary

    By E. D. Calvert

    The objective of this research was to examine variations in melting and forging practice for four titanium-base alloys and to determine their effect on the resultant product. Of particular interest wa

    Jan 1, 1962

  • CIM
    Teck’s Secondary Leaching Technology

    By H. M. Lizama, R. L. Stephens

    Secondary leaching of previously leached supergene copper ore has been developed and implemented at Teck’s Quebrada Blanca operations. This consists of using in-situ leaching techniques aided by geoph

    Jan 1, 2019

  • ISEE
    Vibration Control Blasting for Low Stability Final Wall

    By Greg Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Jan 1, 2018

  • AIME
    Institute of Metals Division - Primary Recrystallization Textures in Cold Rolled Si-Fe Crystals

    By C. G. Dunn, P. K. Koh

    The primary recrystallization textures of 11 single crystals cold rolled 70 pct were determined. The effect of crystal orientation on recrystallization behavior was investigated also and found to be l

    Jan 1, 1957

  • AUSIMM
    Construction of Reinforced Concrete Chimney at Yallourn Briquetting Works

    The principal dirnensions of the chimney were fixed as follows: Height from formation to coping, 328 ft. 8 in.; inside diameter concrete shell, 13 ft. Gin.; inside diameter of the 4~-in. brick lining.

    Jan 1, 1924

  • AUSIMM
    A Review of The Literature on The Chemistry and Metallurgy of Tantalum and Columbium

    In 1801, Hatchett discovered the oxide of a new element while he was examining a heavy black mineral from Haddam, America, which had been presented to the British Museum. He named the mineral Columbit

    Jan 1, 1943

  • NIOSH
    IC 8065 Conversion Of Coal To Fluid Fuels: Abstracts Of Selected German Patent Applications ? Introductions And Summary

    By Ignaz Lichtig

    [IN CONNECTION with its work on the conversion of coal to liquid cud gaseous fuels,3 the Bureau of Mines has always striven to keep informed of developments in this and related fields so that unnecess

    Jan 1, 1961

  • TMS
    A Thermodynamic Model For The Reaction Zone Of Lead Blast Furnace

    By Pengfu Tan

    A thermodynamic model has been developed to predict the distribution behaviors of Cu, Fe, S, O, Pb, Zn, As, and heat balance in a lead blast furnace. The modeling results have been validated by the pl

    Jan 1, 2005

  • DFI
    Application Of Neurofuzzy Approach To Estimate Duration And Evaluate Delay For Diaphragm Wall And Barrette Construction

    By Thoedtida Thipparat

    The diaphragm walls and barrettes are very important to the constructions of multi-storeyed buildings, elevated expressways, subway railway stations, etc. Uncertainties particularly increase in accord

    Jan 1, 2006

  • AUSIMM
    Mining on Narrow Lodes

    THE object of this paper is to review certain features in connection with the mining of narrow lodes, say up to 20 ft. or so wide. The types of ore-body to which it is intended to refer are those whic

    Jan 1, 1912