Search Documents

  • SME
    Design, Excavation, Support Of A Large Diameter Coal Mine Access Decline Using A Tunnel Boring Machine

    By Steve Polegato, J. Coady Marsh, Gary Landry

    The Donkin-Morien Mine in Cape Breton, Nova Scotia, has successfully completed the excavation of a 7.6m (25-ft) diameter access decline over a distance of 3.5km out under the Atlantic Ocean. The tunne

    Jan 1, 1985

  • ISEE
    Spherical Element Bulking Mechanisms for Modeling Blasting Induced Rock Motion (64700483-5a3c-4893-9e17-9d150ed129be)

    By Dale S. Preece, Lee M. Taylor

    Accurate computer prediction of the muck pile produced by a conventional blast requires modeling of the physics that occurs during the rock motion phase of a blast. The ability to predict the motion a

    Jan 1, 1990

  • SAIMM
    Briquetted Chrome Ore Fines Utilisation In Ferrochrome Production At Zimbabwe Alloys

    By N. N. Malila, N. R. Shoko

    The ever-increasing pressure on the profit margins of ferro-chrome producers and the gradual depletion of deposits of rich hard lumpy chrome ores calls for the ferrochrome industry to maximise the use

    Jan 1, 2004

  • SAIMM
    Pre-sink shaft safety analysis using wireline geophysics

    By N. Andersen

    During the preliminary design phases and feasibility study of a proposed vertical shaft, a vertical diamond drill-hole is normally drilled on the site. This paper outlines how rock mass characteristic

    Jan 1, 2015

  • DFI
    Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile Construction

    By Andrew L. Peterson

    CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac

    Jan 1, 1997

  • ISEE
    Desensitization and Malfunction of Cap-Sensitive Explosives and Delay Detonators (3c055ade-7146-4060-a860-4133718a0454)

    By Michael S. Wieland

    This report focuses on the U.S. Bureau of Mines research regarding desensitization and malfunction of delay detonators and cap-sensitive explosives. Delay blasting in underground coal generates tremen

    Jan 1, 1992

  • CIM
    Benchmarking Red Dog Ores using Modal Analysis and its Correlation with Observed Metallurgy

    By David Lin

    "Modal data from Red Dog Main Pit ores were collected and analysed on a size-by-size basis. The Main Pit data were compared to data from composite samples of Red Dog Aqqaluk ores. The data revealed th

    Jan 1, 2002

  • DFI
    Tied-Down Boat Section Construction

    By Romano J. Micciche

    One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High

    Jan 1, 1994

  • CIM
    Use of Functional Performance Models to Increase Plant Grinding Efficiency

    By O. M. Arafat, J. A. Finch

    "The Functional Performance Equation calculated from a plant grinding survey defines two distinct ball mill circuit efficiencies and how they relate to total production rate through the target grind s

    Jan 1, 2017

  • AUSIMM
    The Influence of Pyrite on the Pulp Chemistry and Copper Flotation Response of a Chalcopyrite Ore

    By L Teixeira, C J. Greet, P Karageorgos

    Pyrite is ubiquitous within copper ores, and presents significant challenges to most operations in terms of its impact on copper sulfide concentrate grade and recovery.Samples of ore containing from 3

    Sep 7, 2015

  • CIM
    Process Development at the Raglan Concentrator

    By Joe Holmes, Peter Langlois

    "Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high

    Jan 1, 2001

  • SME
    Holistic planning and approval of sustainable lignite mining and utilization

    By L. Kulik, J. den Drijver

    Rhenish lignite will continue to play an indispensible role in the energy mix of the German Federal Republic for a long time to come. The use of lignite for electricity generation, upgrading and, if n

    Jan 1, 2011

  • IIMP
    Variación de parámetros de resistencia y deformabilidad de macizos rocosos basándose en dos criterios de falla y la influencia de la voladura: Aplicación a la minería superficial evaluando geostadísticamente la probabilidad de ruptura y la estabili

    By Luis Martín Tejeda

    El presente texto señala cómo los parámetros geotécnicos de resistencia y deformabilidad pueden generar mayor confiabilidad en un estudio técnico. En este sentido, la literatura geotécnica indica que

    Sep 19, 2006

  • SME-ICGCM
    Towards a Real Time Response to Changing Strata Conditions on a Longwall

    By P. Trueman

    A project is underway to convert a validated methodology to a system that will permit the near real time interpretation of loading data from longwall powered supports, allowing rapid adaptation of min

    Jan 1, 2006

  • NIOSH
    RI 8730 Sealing Openings in Abandoned Mines by Pneumatic Stowing

    By Slavoljub D. Maksimovic

    The Bureau of Mines, through a memorandum of agreement with the State of Ohio, tested a method of constructing seals in abandoned mine openings in Ohio by means of pneumatic stowing of crushed limesto

    Jan 1, 1982

  • CIM
    In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?

    By L. Vollert

    In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme

    Jan 1, 2019

  • SAIMM
    Added Value Long Steel Products Produced At MSSA Newcastle Works

    By A. J. Potgieter, C. Hill, A. Humpel, D. S. Magudulela, V. Scholtz, A. Coetzee

    Keywords: Pyrometallurgy, long steel products, coke, sinter, blast furnace, steel plant Located in Northern KwaZulu Natal, Mittal Steel South Africa Newcastle works produces roughly 1.8 million to

    Jan 1, 2006

  • IIMP
    Utilización del Programa GoldSim para aplicaciones de planeamiento estratégico

    By Siegfried Arce

    Existen muchas herramientas para la gestión de proyectos. Sin embargo, éstos no están en capacidad de realizar análisis de riesgos y evaluar alternativas que consideren incertidumbre. En ese sentido,

    Aug 25, 2002

  • DFI
    Uncertainty And Bias In Evaluation Of LRFD Ultimate Limit State For Axially Loaded Driven Piles

    By James A. Schneider

    Selection of resistance factors within Load and Resistance Factor Design (LRFD) requires accurate assessment of uncertainty and bias in load and resistance. To date, many studies have focused predomin

    Jan 1, 2009

  • DFI
    American Practice In Design And Installation Of Driven Piles For Structure Support

    By Hal W. Hunt

    Heavier loading and more efficient equipment is helping to keep driven piles competitive in America. Better Knowledge and testing of soils and support materials make it practical to use higher stresse

    Jan 1, 1987