Search Documents

  • ISEE
    The Influence of Damping on Computer Simulations of Rock Motion: Computer Modeling of Gas Flow and Gas Loading of Rock in a Bench Blasting Environment

    By Steven D. Knudsen, Dale S. Preece

    Computer modeling of the blasting process can aid in gaining an understanding of the physics controlling the process. The sequence of events in a blast occur so rapidly and in such a violent environme

    Jan 1, 1992

  • NIOSH
    OFR-35(1)-73 Evaluation Of Mine Electrical Systems With Respect To Safety, Technology, Economics And Legal Considerations - Volume I ? Introduction

    By Robert Stefanko

    This report, rather than attempting to replace previous annual reports, supplements, and more importantly, coordinates and summarizes the entire effort. Even with such restrictions, the report is volu

    Jan 1, 1973

  • IOM3
    A future in coal: viable or not?

    By G. Kill

    Although other energy commodities have developed successful futures contracts, long-term contracts still dominate the coal market. To establish whether coal markets will develop in the same way, coal

    Aug 1, 1994

  • CIM
    Maximisation des revenus et du rendement financier par l’optimisation de I’information, de la planification et des pratiques minières*

    By M. Vallée

    "RÉSUMÉDurant les 10 dernières années, les améliorations dans le contrôle des limites des sautages et les arpentages après l’exploitation ont fourni des informations préalables et post facto sur les l

    Jan 1, 2005

  • CIM
    Ore Handling for the McArthur River and Cigar Lake Projects

    By Chuck Edwards

    "The development of two large, high-grade uranium projects has been proposed for northern Saskatchewan. The projects are now under review by a joint federal/provincial panel. The McArthur River projec

    Jan 1, 1997

  • DFI
    Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their Analyses

    By Eiji Kojima

    In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn

    Jan 1, 2006

  • DFI
    High Capacity Rock Anchors At The Bear Mountain Bridge

    By Frederick C. Rhyner

    This paper describes the design and construction of two high-capacity rock anchors to restrain a supplementary backstay for the Bear Mountain Bridge, which is a suspension bridge spanning the Hudson R

    Jan 1, 2010

  • SME
    Field Application of NTH Fracture Classification at the Second Manapouri Tailrace Tunnel, New Zealand

    By Don F. Macfarlane

    This paper describes the field application of the NTH fracture classification to rock encountered in the construction of the 9.6 km long, 10m diameter, Second Manapouri Tailrace Tunnel. Excavation of

    Jan 1, 2008

  • SME
    Software For Hydrologic Monitoring Of In Situ Leaching Operations

    By Peter K. Mathison

    The U. S. Department of Interior, Bureau of Mines (Bureau) is developing a hydrologic monitoring system for in situ leaching operations. A working prototype of this system was installed and tested at

    Jan 1, 1992

  • SME
    Ilmenite smelter freeze lining monitoring by thermocouple measurements: Model results

    By J. H. Zietsman

    Ilmenite smelting furnaces must be operated with a freeze lining of frozen slag to protect sidewall refractories from chemical attack by liquid slag. The process has two main control objectives: First

    Jan 1, 2005

  • NIOSH
    RI 5491 Refractory Properties Of Alabama Bauxitic Kaolins - Summary

    By P. G. Pigott

    The lack of technical information regarding the physical characteristics of kaolins and bauxitic kaolins, rejected during the mining of bauxite near Eufaula, Ala., has retarded their commercial utiliz

    Jan 1, 1959

  • NIOSH
    RI 4912 Soda Sinter Process For Treating Low-Grade Titaniferous Ores

    By Robert T. MacMillan

    A process has been developed in the laboratory and expanded to semi-pilot-plant scale for recovering titania, iron, and byproducts from two types of titaniferous iron ores. A reducing roast with coke

    Jan 1, 1952

  • DFI
    Interlocking Caisson Walls

    By William E. Lardner

    Interlocking caisson walls developed from conventional "soldier pile and lagging" shoring. In the latter, the soldier piles receive directly most of the soil load. Natural arches form in the soil behi

    Jan 1, 1987

  • ISEE
    The Journal of Explosives Engineering - Vol 20 No 3 Creating Awareness about Carbon Monoxide - The Silent Hazard

    By Nobel Insurance Service

    [Executive Director’s note: ISEE is committed to continuing its efforts to ensure that blasters be made aware of the issue of migration of carbon monoxide resulting from blasting operations. In the Ju

    Jan 1, 2004

  • AUSIMM
    Bubble Flow Pattern Detection in the Water Model of a Metal Treatment Unit

    By J J. J Chen, J C. Zhao

    A water/air model was developed to simulate the refining of molten aluminium by the sparging of gas through an impeller. The optimal gas dispersion depends upon selecting the correct gas rate for a gi

    Jan 1, 1995

  • DFI
    Jet Grouting And Safety Of Tuttle Creek Dam

    By Timothy D. Stark

    Jet grouting has increasingly become a ground improvement technology used to address seepage concerns and provide strength improvement to soils underlying dams. The technique of jet grouting uses high

    Jan 1, 2012

  • SME
    Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer Project

    By Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna

    The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially

    Jan 1, 2005

  • SME
    An Assessment Of Engineering Noise Controls At A Talc Processing Plant

    By E. R. Spencer

    National Institute for Occupational Safety and Health (NIOSH) researchers conducted an investigation to quantify sound levels and to determine the amount of sound reduction provided by engineering noi

    Jan 1, 2008

  • SAIMM
    A Technical And Operational Audit Of The First Ten Years Of The Teniente Converter Operations At Nkana Smelter

    By M. Syamujulu

    In 1994, Nkana smelter commissioned a multimillion US Dollar Chilean Teniente converter (CT) in its operations in order to improve its smelting technological base. The main objective was to reduce the

    Jan 1, 2005

  • NIOSH
    MLA 25-85 - Mineral Resources Of The Mt. Stirling Wilderness Study Area (BLM No. 050-0401), Nye And Clark Counties, Nevada

    By Martin D. Conyac

    A 1984 Bureau of Mines investigation identified ho mineral resources in the Wilderness Study Area (WSA). However, four prospects in the WSA contain anomalous amounts of copper and silver minerals; one

    Jan 1, 1985