Search Documents

  • SME-ICGCM
    Passive Seismic Imaging for Determination of the Longwall Rear Abutment Location

    By Erik Westman

    Few studies have been conducted regarding the location, movement, and relative magnitude of the rear abutment of a longwall coal mine. The rear abutment, or the abutment pressure arch in the gob area,

    Jan 1, 2012

  • AUSIMM
    The Useful Minerals of Tasmania

    The distribution or the userul minerals or Tasmania is so closely connected with the geological structure of the island that it will be convenient to briefly recapitulate the principal ract or its geo

  • AUSIMM
    Mining and Geological Factors Associated with Instantaneous Outbursts of Coal and Gas

    This paper considers the application of recent laboratory gas sorption data to the understanding outburst phenomena in underground coal mining. Previous use of threshold limits based on gas content an

    Jan 1, 1994

  • SME-ICGCM
    Introduction of Long, High Capacity, Highly Tensioned, Post- Grouted Cable Bolts at BHP Billiton?s San Juan Mine,

    By James Pile

    Long, high capacity, highly tensioned, cable bolts (strand bolts), stiff enough to be installed with resin like a solid bolt, yet flexible enough to be used in any lengths, have been widely used in

    Jan 1, 2007

  • NIOSH
    RI 6040 Low-Temperature Heat Capacities And Entropies At 298.15° K. Of Antimony And Indium Sulfides ? Introduction And Summary

    By E. G. King

    As low-temperature heat-capacity and entropy data were available for only one sesquisulfide (cerium sesquisulfide), it appeared desirable to augment the information for this class of compounds by meas

    Jan 1, 1962

  • DFI
    A Review of Current Mexican Design Approaches for Cast-in-Place Drilled Shafts in Granular Soils under Axial Loading

    By Enrique Ibarra, Manuel J. Mendoza

    "Abstract: This paper describes the current state-of-practice for the design of cast-in-place drilled shafts in granular soils under axial loading, addressing recent advances that take into account th

    Jan 1, 2014

  • NIOSH
    Water Sprays Move Air Towards Face ? Objective

    Significantly increase the amount of fresh air that sweeps the face in front of a continuous mining ma-chine, in order to prevent methane gas buildup. Approach Water sprays are mounted along th

    Jan 1, 1978

  • DFI
    Soil Improvement Technique to Mitigate Extreme Settlements on Deep Compressible Deposits in the Bogota Valley

    By Roger A. Archabal, Omar A. Conte, Gustavo Langoni

    This international case study focuses on the rigorous geotechnical interaction and results of a soil improvement program utilized to mitigate consolidation settlements of over 1.5 m [5.0 ft]. The extr

    Jan 1, 2018

  • NIOSH
    Pneumatic Monitoring Systems ? Objective

    To provide a flexible, low-maintenance, low-cost continuous mine air monitoring system as an alternative to conventional fixed-point, electronic monitoring systems. Background Continuous monitor

    Jan 1, 1988

  • RMCMI
    Air Quality Development Affecting Western Coal Fired Power Plants

    ? Develop a six year capital budget for future emission controls at Western Springfield Power Plant that would provide long-term operating certainty

    Jan 1, 2005

  • NIOSH
    RI 5555 Molybdenum Casting Development ? Summary

    By E. D. Calvert

    Molybdenum has been successfully cast into static and rotating molds in conventional equipment used for casting titanium and zirconium. Melting was accomplished by using an arc potential of 36 to 40 v

    Jan 1, 1960

  • CIM
    Geometallurgical Modeling - The New Approach to Plant Design and Production Forecasting/Planning, and Mine/Mill Optimization

    By Dave Bulled, Chris Bennett, Glenn Kosick, Glenn Dobby

    "Mining companies around the world are embracing geometallurgical modeling at a rapid rate, as senior executives realize that inputs must be properly measured if the output is to be managed effectivel

    Jan 1, 2004

  • ABM
    PLUG & WORK IN 3D – NEW WAYS IN RAPID PROFESSIONAL COMMISSIONING

    By Detlef Ehlert

    With the proven “Plug & Work” concept developed by SMS Siemag, automation systems are tested and optimized in the test field in a near-reality environment before being shipped and commissioned at

    Aug 16, 2017

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • SME
    Statistical Significance Of Some Operating Parameters On Dolomite Removal From Phosphate Using Amphoteric Collector

    By A. M. Elmahdy

    An amphoteric collector was tested for dolomite removal from phosphate ore. The effects of some operating parameters and their significance on the flotation of dolomite were studied using statisticall

    Jan 1, 2007

  • NIOSH
    IC 8416 Review Of Bureau Of Mines Coal Program, 1968 ? Introduction

    By John D. Spencer

    Surveys to establish the quantity and quality of coals available for metallurgical, industrial, and energy use, investigations to develop better mining methods, and studies aimed at improving the heal

    Jan 1, 1969

  • CIM
    Convergent Bitumen Recovery

    By Lee Nichols

    Convergent Bitumen Recovery Context of discussion It should be noted that the CBR process is a conceptual bitumen recovery feed methodology, designed to provide supplemental bitumen to the oil sand

    May 1, 2007

  • NIOSH
    RI 5424 Cable-Tool Coring With Oil-Base Mud In Appalachian Oilfields ? Summary

    By W. T. Wertman

    A research program to aid development of better and more efficient methods for producing petroleum and increasing its ultimate recovery from underground formations is an integral part of the work of t

    Jan 1, 1958

  • SAIMM
    Strategic and tactical requirements of a mining long-term plan

    By B. J. Kloppers, J. V. Z. Visser, C. J. Horn

    "The long-term plan (LTP) in a mineral resource company is defined by the quality of the mineral resource and represents the result of a series of trade-offs to fulfil internal organizational as well

    Jan 1, 2015

  • NIOSH
    RI 3511 Explosive Properties Of Cyclopropane: Prevention Of Explosions By Dilution With Inert Gases ? Introduction (f97e586e-20ce-4743-9d1b-fbe2daa0dfa7)

    By G. W. Jones

    As part of its program for the promotion of safety, the Bureau of Mines has investigated various means of mitigating or eliminating the explosion hazards of combustible gases and vapors found in the m

    Jan 1, 1940