New Type of Load Cell for Monitoring of Roof Bolt TensionBy K. Unkug
It is commonly accepted that the tension of roof bolts can be used as a measure of the effectiveness of roof support performance in coal bearing strata. The conceptual base for the assumption orig
Jan 1, 1986
-
Fortrac® Geogrids For Mine Roof ControlBy Ray Brandon
The recent introduction of polymer geogrids for ground control purposes in underground mines allows mine operators more flexibility in choosing improved products for several applications. This is evid
Jan 1, 1996
-
Time Dependent Roof Deterioration At A Central Ohio Coal Mine (b0f3bbeb-91e8-4a62-8116-5f9e444a047e)By Ted Klemetti
Roof deterioration in weak moisture-sensitive rock leads to roof falls in coal mines. An observation site was set up in intake air at an underground coal mine in central Ohio to evaluate the time-dep
Jan 1, 2009
-
Pillar Strength and Design Methodology for Stone MinesBy Gabriel Esterhuizen
Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd
Jan 1, 2008
-
Cavability Investigation Of A Stratabound Copper Deposit, Tong Kuang Yu Mine, Shanxi Province, ChinaBy W. C. Lacy
Stratabound copper ore bodies in thick Proterozoic metamorphosed sedimentary and volcanic rocks at the Tong Kuang Yu Mine in southern Shanxi Province of China were considered as possibly being amenabl
Jan 1, 1989
-
Evaluation And Design Considerations For Pillar/Roof Separation In An Operating Coal Mine (3e69124f-30b4-40c5-9503-bd59304b248f)By Mike Amick
As virgin coal reserves dwindle, more and more mines are being opened in areas with previous mining. As addressed in this conference before, there are solutions available for designing mines extracti
Jan 1, 2009
-
Integrated Instrumentation Method of Stress State, Material Property, and Deformation Measurement for Stress Control Method of MiningBy Shosei Serata
The application of conventional rock mechanics methods to complex ground is very difficult. Yet. In most underground mining, the ground is complex. Therefore. conventional methods are not only difficu
Jan 1, 1986
-
Roof Stability Issues in Underground Limestone Mines in the United States (c7025d3b-53e9-40eb-abd5-d6a28b7f51f3)By Gabriel Esterhuizen
The room-and-pillar mining method is used extensively in underground limestone mines in the Eastern and Midwestern U.S. The rock mass is typically a near-horizontal, bedded deposit at relatively shal
Jan 1, 2007
-
Geotechnical Mapping By Seismic Imaging In Underground MinesBy W. J. Mcgaughey
A crosshole seismic imaging (tomography) experiment has been carried out in an underground mine in order to delineate waste rock within a massive sulphide ore body. Data comprising 1526 travel time me
Jan 1, 1989
-
Rock Mechanics Investigations on Seismic Events Around Two Longwall Coal OperationsBy Michael Alber
Coal mining by the longwall method typically causes seismic events. This paper describes the research on mining induced seismicity around two specific longwalls at 1100m depth under several old longwa
Jan 1, 2008
-
New Approach in Rock Bolting that Adds to Bearing Capacity and Yield of the Bolts without Increase to the Cost of the TechnologyBy Victor Nazimko
A new technique for reaming the holes has been tested. This technique is available for reaming a hole at its deep end creating an enlarged cavity that has helicoidal grooves oriented at less than 40 d
Jan 1, 2008
-
Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case StudyBy Mark K. Larson
Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th
Jan 1, 2012
-
Determination Of Horizontal Stress Direction By Underground Mine Mapping (2f4eaf66-10ce-4f4d-9f7a-64c6c21e6400)By S. E. Phillipson
Underground mine mapping is a critical component of understanding the controls on ground instability. Many relatively localized examples of ground failure are associated with geologic features, such
Jan 1, 2009
-
Pre-mining stresses at some hard rock mines in the Canadian Shield (2c76bca0-8dd2-4a44-bc9b-85524b3514cf)By B. Arjang
ABSTRACT: Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using tri
Jan 1, 1989
-
Detailed Stress Analysis of Longwall PanelsBy Khaled Morsy
In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh
Jan 1, 2006
-
Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock BoltsBy Damon P. Vandermaat
Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa
Jan 1, 2012
-
Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)By Nan Hua
As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make
Jan 1, 2009
-
Identifying Moisture Sensitive Roof Rocks in Coal MinesBy Gregory M. Molinda
Historically, miners have known that roof rocks originally composed largely of mud were prone to slaking and deterioration when exposed to water and humidity. Mine Safety and Health Administration (M
Jan 1, 2006
-
Experimental Study Of Line Electrode Method To Detect Underground CavitiesBy F. Ziaie
Line electrical resistivity method using physically infinite distance between current line electrodes is proposed to determine the location of mine workings. In this method at least three line electro
Jan 1, 1989
-
An Applications Approach To Barrier Pillar Design For Improved Resource RecoveryBy John R. Koehler
Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu
Jan 1, 1989