Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Reducing Electrical Hazards In Surface MiningBy L. A. Morley
Electricity is a major cause of lost-time accidents and fatalities in the mining industry. Major hazards and unsafe practices that contribute to electrical hazards are identified in this paper. Recomm
Jan 1, 1986
-
Prediction Of Nitrate Concentrations In Effluent From Spent Ore (14db28f9-d569-4806-8ede-2d8b24391910)By A. D. Davis
The disposal of spent ore from cyanide heap-leach processing facilities is of concern to the mining industry, regulatory agencies, and the public. Disposal of several hundred million tons of additiona
Jan 1, 1994
-
Considerations On The Selection Of A System Of Long Distance Transport By Conveyor Belt ? IntroductionBy J. M. Rios
This paper exposes the reasons that led the Empresa Nacional Minera del Sahara, S.A. (ENMINSA) to the selection of a conveyor belt system for the transport of phosphate rock over a distance of 100 kil
Jan 1, 1968
-
Comparison Between Sprayed and Cast in Situ Concrete Secondary Linings at Bond Street and Farringdon StationsBy Eleanor Kentish, Nathan Bond, Edward Batty, Simon Webber, Alan Skarda
"Crossrail is Europe’s largest construction project — a new 100km rail route running through central London. A joint venture of BAM, Ferrovial and Kier (BFK) has constructed the tunnels and escalator
Jan 1, 2016
-
Paleocollapse - Determinant Of A Quarry FailureBy James A. Martin
Evaluation and subsequent development of a quarry in east-central Missouri was based on a general but brief examination of outcrops and core from five (5) test holes. Neither core, outcrops, nor exist
Jan 1, 1970
-
Overcoming Challenges in Tunneling for Albany’s Beaver Creek Clean River Project, Albany, New York - NAT2022By Jerry Wang, Greg Bold, Mahmood Khwaja, Rebecca Caldon, William Simcoe
Phase III and Phase IV of the Beaver Creek Clean River Project, Albany, NY, includes microtunnel construction of 2,320 feet of 48-inch/36-inch internal diameter (ID) conveyance pipe and a 525 foot lon
Dec 1, 2022
-
Settling Of Mine Water At Meramec Mining Company's Pea Ridge MineBy H. L. Monroe
Meramec Mining Company, owned 50% by St. Joseph Lead Company and 50% by Bethlehem Steel Corporation,- is engaged in the mining, concentrating and pelletizing of iron ore from the Pea Ridge Mine which
Jan 1, 1965
-
Using Passive Treatment Systems For Mine Closure A Good Approach Or A Risky Alternative (dbc655b4-4457-479a-a418-54cc78cbb8f3)By P. Eger
In 1991, LTV Steel Mining Company decided to close an open pit taconite mine in northeastern Minnesota, using a passive treatment approach consisting of limiting infiltration into the stockpiles and w
Jan 1, 1999
-
Slurry Handling Considerations ? IntroductionBy Ralph M. Stricklen
The need to move large tonnages of slurry has grown as mines have become larger. As existing tailing depositories are filled up, new mines developed, or environmental requirements dictate, it becomes
Jan 1, 1984
-
Large Flotation Machines In Coal Preparation Plants Of The Ruhr District Of West GermanyBy Armin C. Supp
Since 1975, about a dozen high capacity flotation plants have been installed in the Ruhr district. Depending on the size of the preparation plants, the design capacity of the flotation section is betw
Jan 1, 1985
-
Effects Of The Geology Of Talc Ores Upon Mining And Killing OperationsBy Richard H. Olson
Talc is currently mined in the U.S. in six major districts. The size and depth of the ore bodies and their mineralogy dictate the types of products manufactured and the mining and processing methods w
Jan 1, 1984
-
Industrial Minerals In InsulationBy W. C. Streib
A wide variety of materials have satisfactory to superior insulating properties and can be used to control the flow of heat, provide energy savings, improve personal comfort and contribute to personal
Jan 1, 1976
-
A Non-Segregating "Rocky Paste Fill'' (RPF) Produced by Co- Disposal of Cemented De-Slimed Tailings Slurry and Graded RockfillBy Ian Sheppard, Kugan Kuganathan
The Mount Isa Rocky Paste Fill (RPF) was one of the five fill options investigated for the Enterprise Mine filling between June 1996 and September 1996. Co-disposal of deslimed cemented tailings (CHF)
Jan 1, 2001
-
A Mechanism Study Of The Formation Of Sodium Vanadate Compounds Under The Conditions Of The Salt-Roast ProcessBy William H. Dresher
A study has been made of the reaction mechanisms occurring during the salt-roast process to form water-soluble sodium vanadate compounds from the vanadium oxide compounds present in vanadium-bearing o
Jan 1, 1961
-
A comprehensive subsidence study for a longwall mine under steeply mountainous areas - SME Transactions 2010By Yi Luo
Longwall coal mines are frequently located in steep mountainous areas with narrow valleys. In order to protect surrounding watersheds and residential structures, support areas are left under the valle
Jan 1, 2010
-
Hutchinson Mine - A Problem In Coal Mine-DrainageBy Ernst P. Hall
The Irwin Basin. (Fig. 1)* is a synclinal or shoe-horn *Figure numbers throughout refer to color slides not included with the preprint shaped basin in the Pittsburgh Coal Seam, It is approximately 10
Jan 1, 1959
-
Development of a Smart Self Contained Breathing Apparatus (Smart Scba) for use in Emergency EscapeBy D. Kimball, P. Chambers
"BACKGROUND In the event of an explosion or fire in an underground mine, workers can be exposed to a deficiency of oxygen, an excess of carbon monoxide, or both. These threats can occur as separate co
Jan 1, 2015
-
The Hot-Stage Microscope: An Important Tool For Chemical-Metallurgical Research At Elevated Temperatures ? IntroductionBy A. R. Conroy
Microscopic observation of physical and chemical changes which take place in various materials under conditions of elevated temperature and controlled atmosphere can often yield valuable insight into
Jan 1, 1964
-
Integrated Tactical Mine Planning at Chino Narrows Planning-Execution GapBy J. Castaneda, J. Schmidt
"INTRODUCTION Chino is an open-pit copper mining complex faced with intricate material routing requirements. Historically, this was challenging at the mine, in part because the shovel dig plan, haul p
Jan 1, 2018
-
In Situ Tests Of Salt Deformation For Validation Of A Radioactive Waste Repository Predictive TechnologyBy D. E. Munson
To assure the safety of a radioactive-waste repository, the performance of the repository must be predicted far into the future. The Waste Isolation Pilot Plant (WIPP) Program is responsible for devel
Jan 1, 1992