Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Critical Evaluation Of The Installation Equipment Of In-Stope Rock Bolts And The Effectiveness Thereof In The Merensky Stoping AreasBy G. M. J. van Heerden
Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The Union Section of Anglo Platinum is situated ±18 km west of the town of Northam on the north
Jan 1, 2002
-
Morphological approach to volume calculation of complex 3D geological objectsBy D. R. Hack, N. M. Sirakov, M. L. Feves, M. Iwanowski
This paper presents a new approach capable of volume calculation of 3D reconstructed geological objects. The method is based on a well-known concept that states the volume of an object can be computed
Jan 1, 2003
-
A Review Of The Design Criteria And Practical Aspects Of Developing A Successful Pre-Split.By Simon St J Tose
The objective of this paper and presentation is to review the different criteria and methodology used by AEL and other organisations to create a pre-split design which delivers a stable highwall for t
Jan 1, 2006
-
Formation Of Silicon By Electro-Deoxidation, And Implications For Titanium Metal ProductionElectrochemical measurements are presented on electro-deoxidation of silica in molten calcium chloride at 900°C, with porous silica pellets as starting material. Measurements during pre-electrolysis (
Jan 1, 2006
-
Immediate Ground Support, After Development Or Stope Face Exposure, Can Prevent Falls Of Ground.By B Vorster
Falls of Ground is one of the highest causes of incidents, accidents and fatal injuries in our mines today. These falls of ground may occur as soon as the face is exposed after blasting or after m
Jan 1, 2008
-
Simplification Of The Thabazimbi Dense Media Separation Plant Flow Line To Increase Capacity - BackgroundBy E de Villiers
Several methods exist by which the capacity of a dense media separation (DMS) plant can be improved: 1) Increase the feed rate in spite of efficiency 2) Replace with bigger equipment 3) Add wh
Jan 1, 2006
-
Optimization of the Cycle Time to Increase Productivity at Ruashi MiningBy H. Thomas, I. N. M. Nday
"*Paper written on project work carried out in partial fulfilment of BSc.Eng (Mining Engineering) degreeThe optimization of the cycle time to increase productivity at Ruashi Mining was an on-site proj
Jul 1, 2019
-
Design, Installation And Testing Of The No 250 Wemco Smartcell? Flotation Machine At Minera Los PelambresBy A Weber, L MacNamara, H Schreiber
Design and development of the world?s largest flotation cell was completed in 2002. This was the first 257 m3 flotation cell installed in the mineral industry and represents a major development in t
Jan 1, 2007
-
Something for nothing?—An unconventional approach to extracting three-dimensional grade information from two-dimensional estimation of thin, tabular reef depositsThis paper presents an initial investigation into the viability of co-kriging the grades of multiple mining cuts in a two dimensional, thin reef scenario. Deposits with gradational mineralized zones,
Jan 1, 2003
-
Assessment Of The Risk Of Plug Or Water Barrier Failure Due To Seismicity At South Deep MineAs part of a comprehensive risk analysis which was carried out into the effectiveness of the water barrier between South Deep and Randfontein Estate mines, the potential threat posed by large seismic
Jan 1, 2006
-
Lötschberg base tunnel: brittle failure phenomena encountered during excavation of the Steg lateral aditBy V. Labiouse, P. K. Kaiser, F. Descoeudres, F. Rojat
In this paper some failure phenomena observed in the crossing of brittle rock formations at the Lötschberg base tunnel are presented. A brittle failure criteria, recently developed by Canadian researc
Jan 1, 2003
-
A study of metal droplet distributions in slags during ladle treatment phase of secondary steelmakingBy J. Ekengård, H. Srinath, M. Andersson, P. Jönsson, D. S. Sarma
The present paper deals with mixing between the metal and slag phase during the ladle refining process, including vacuum degassing. Dispersion of metal drops in ladle slags has been studied. The resul
Jan 1, 2004
-
The Transfer Of Knowledge Produced By The DEEPMINE Research Programme: A Critical EvaluationBy R. J. Durrheim
The DEEPMINE Collaborative Research Programme was established to create the technological and human resources platform that would make it possible to mine gold safely and profitably at depths of 3 to
Jan 1, 2002
-
The Application Of In-Mine Electrical Resistance Tomography (ERT) For Mapping Potholes And Other Disruptive Features Ahead Of MiningBy M. van Schoor
The bulk of the world?s platinum production originates from the Merensky and UG2 reefs within the Bushveld Complex, South Africa. Both the Merensky and UG2 reefs are disrupted by faults, dykes, pothol
Jan 1, 2005
-
Survey And Geotechnical Slope Monitoring ConsiderationsBy F. T. Cawood
Monitoring of the slopes of surface mines can prevent loss of life, loss of equipment, loss of production and possibly the loss of the mine. The effectiveness of such monitoring depends on the extent
Jan 1, 2006
-
Technological developments for spatial prediction of soil properties, and Danie Krige’s influence on itBy R. Webster
"Daniel Krige’s influence on soil science, and on soil survey in particular, has been profound. From the 1920s onwards soil surveyors made their maps by classifying the soils and drawing boundaries be
Jan 1, 2015
-
Foaminess Of Slag: Cause And ControlBy S. Pal, A. K. Lahiri
Most of the compounds present in slag are surface active. This gives rise to foaminess of slag. The foam life and foaming index are normally determined by the draining rate of slag through the plateau
Jan 1, 2004
-
Physico-chemical properties and transition metal complex formation in alkali pyrosulphate and hydrogen sulphate meltsBy H. Hamma, R. Fehrmann, M. Gaune-Escard, G. Hatem, S. B. Rasmussen, K. M. Eriksen
The molten salts M2S2O7and MHSO4, the binary molten salt systems M2S2O7-MHSO4and the molten salt-gas systems M2S2O7-V2O5and M2S2O7-M2SO4-V2O5(M = Na, K, Rb, Cs) in O2, SO2and Ar atmospheres have been
Jan 1, 2004
-
Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No.3 Shaft.By M Lipalile, A B. Tunono, A W. Naismith
Konkola No 3 shaft experienced severe mining induced stress and time related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow
Jan 1, 2005
-
Possibilities of limiting methane emission into atmosphere on the example of mines in the Jastrzebie Coal companyBy A. Tor, M. Borowski, N. Szlazak, D. Obracaj
This article presents possibilities of reducing methane emission to the atmosphere in working mines in Jastrzebie Coal Company by means of proecological solution. They form a new approach towards the
Jan 1, 2003