A critical evaluation of processes to produce primary titanium - SynopsisBy D. S. van Vuuren
Over the last 60 years many different processes were conceived to reduce the cost of titanium produced by the Kroll process. However, success eluded all previous efforts, which were consequently termi
Jan 1, 2009
-
A New Underground Auger Mining SystemBy I. L. Follington
This paper describes the research and development programme to develop a prototype underground auger mining system aimed at developing and demonstrating an underground auger mining system able to prov
Jan 1, 2001
-
Test Results On Compressive Strength Anisotropy In Steel Fibre Reinforced ShotcreteRecently, work was carried out by the Shotcrete Working Group to study anisotropy in steel fibre reinforced shotcrete using strain-controlled, compressive strength testing methods. The shotcrete mate
Jan 1, 2001
-
A Case Study Application Of Linear Programming And Simulation To Mine Planning ? SynopsisBy J. A. de Carvalho Junior
This paper analyses the impact of the uncertainty associated with the input parameters in a mine planning optimization model. A real example was considered to aid in the building of a mathematical mod
Jan 1, 2012
-
Improving Financial Returns From Mining Through Geostatistical Simulation And The Optimized Advance Drilling Grid At El Tesoro Copper Mine ? SynopsisBy J. M. Ortiz
Grade control and short-term planning are usually based on the samples obtained from blastholes. These samples may carry a large sampling and sample preparation error. At El Tesoro copper mine in nort
Jan 1, 2012
-
Mechanical–transport processes in salt: consequences for abandonment of underground exploitationsBy M. Ghoreychi, X. Daupley
ABSTRACT: The paper is devoted to two major aspects related to the abandonment of salt mines: 1)- Long-term risk associated with the mechanical instability of surface and its consequences for public s
Jan 1, 2003
-
An economic risk evaluation approach for pit slope optimizationBy L. F. Contreras
In open pit mine design, it is customary for geotechnical engineers to define the appropriate slope design angles within practical limits. The conventional approach to slope angle design is based on t
Jan 1, 2015
-
Quantitative Rockburst Hazard Assessment At Elandsrand Gold MineBy F. Essrich
A quantitative rockburst hazard assessment procedure was introduced on Elandsrand Gold Mine at the end of 1994. It is currently used to evaluate the seismicity-related risk in production areas on the
Jan 1, 1997
-
Increasing Capacity And Productivity In The Metals Markets Through Pneumatic Conveying And Process Injection Technologies - The Southern African Institute Of Mining And MetallurgyBy Mark Coleman
Pnuematic Conveying and Process Injection Technologies have been implimented in the metals markets for the last 40 years and have consideribly improved the productivity and the performance of many pro
Jan 1, 2008
-
1D Numerical Simulation of Velocity Amplification of P-Waves Travelling Through Fractured Rock Near a Free SurfaceBy G. Swan, E. Nordlund, P. Zhang
"SynopsisThe most widely used support design damage criterion for rockburst-prone mines is based upon kinetic energy, which is proportional to the square of the ejection velocity and is commonly expre
Jan 1, 2015
-
Solidification Of An Al-Zn Alloy During Semi-Solid Processing - SynopsisBy S. L. George
The semi-solid metal casting process results in a unique solidification path. The microstructural features that were identified during the characterization of the as-cast microstructure, were used as
Jan 1, 2011
-
Numerical Solution for the Deformations of Tunnels in Rock Masses and its Application to Estimate In Situ Stress Ratio K0By M. Arlandi, J. C. Monge
In this paper, the finite element method is used to obtain deformations of a rock tunnel. More than 3,000 numerical simulations and calculations were carried out. The analysis of this results has all
Jan 1, 2003
-
Use a Can solve SO2 scrubbing system to better link your batch-operated furnace with its by-product sulphuric acid plant - SynopsisBy P. Roy
Smelting or converting of sulphide concentrates and mattes in a batch operation presents a challenge when directing the off- gas to a conventional acid plant. The Hindustan Zinc Ltd. (a division of th
Jan 1, 2007
-
Life And Design Of Bord-And-Pillar Workings Affected By Pillar ScalingBy M. D. G. Salamon
It has been noted in recent years that the pillars in some bord-and-pillar workings scale or spall. In due course this process may result in the collapse of the affected panels. This paper presents a
Jan 1, 1998
-
A critical comparison between a compressed air driven rocker arm shovel and a track-bound non-throw loader - SynopsisBy A. Meek
This report compares the compressed air driven rocker shovel to the newly developed Warthog Non-throw development end loader. The two machines were compared on aspects such as safety, loading potentia
Jan 1, 2009
-
Rock avalanche run out prediction: combined application of two numerical methodsBy R. Poisel, C. Scavia, Preh A., W. Roth, M. Pirulli
ABSTRACT: Two methodologies for the three-dimensional simulation of the run out of rock avalanches are presented: one based on a granular approach and the other based on a continuum equivalent approac
Jan 1, 2003
-
Oxygen Activity Measurements In Simulated Converter Matte (e2a109c1-a92c-480a-aff7-b09fc199f5f7)By K. G. Tshilombo
It should be possible to use an oxygen probe to follow iron removal during converting, if local equilibrium is established between iron in the matte and the iron oxides in the fayalitic slag. The oxyg
Jan 1, 2007
-
Design Rules For Avoiding Draw Horizon Damage In Deep Level Block CavesDeep level block caving as a mining method is becoming more popular due to the fact that it is the lowest cost per ton underground extraction system. However, many block caves do not achieve their ful
Jan 1, 1999
-
Theoretical, practical, and economic difficulties in sampling for trace constituents - SynopsisMany industries base their decisions on the assaying of tiny analytical sub-samples. The problem is that most of the time several sampling and sub-sampling stages are required before the laboratory pr
Jan 1, 2010
-
Modelling water uptake in highly compacted bentonite in environmental sealing barriersBy W. Wittke, J. Gattermann
ABSTRACT: One alternative to close a radioactive waste repository in rock salt is the construction of a “Cross Section Closure (CSC)“ sealing barrier. The proposed material for the CSC is highly compa