Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Mechanisms of Linear Shaped Charge Cutting - A New Explanation

    By Paul Worsey, Braden Lusk, Seokbin Lim

    This paper discusses the theory and experiment involved in the discovery of the mechanisms of Linear Shaped Charges, which are much different from those for Conical Shaped Charges. Linear Shaped Charg

    Jan 1, 2005

  • ISEE
    Underwater Blasting Effects on Structures –A Model Approach

    By Chris Breeds, Larry Leone, Jerry Wallace

    One of the Authors was recently retained to provide a professional engineering analysis of the potential impacts from underwater blasts used to enlarge intake tunnels at the Cheesman Dam near Denver i

    Jan 1, 2012

  • ISEE
    Busting Myths at the Energetic Materials Research and Testing Center

    By G. Walsh, L. Wolkovitch, A. Savage, V. Romero, T. Zimmerly, G. Imahara, J. Hyneman, K. Byron, D Tapster, S. Belleci, J. Metzger, M. Stanley

    Testing was conducted at the Energetic Materials Research and Testing Center for the MythBusters on three separate occasions. This testing included (1) an experiment designed to create diamond from gr

    Jan 1, 2010

  • ISEE
    Numerical Simulation of FRP Strengthened Reinforced Concrete Slabs under Blast Loads

    By M. K. Ameen, R. El-Hacha

    This paper presents the analytical results obtained from numerical simulation of reinforced concrete slabs strengthened with various FRP systems and subjected to blast loading. A three-dimensional fin

    Jan 1, 2010

  • ISEE
    Preventing Blast Damage to Underground Infrastructure from Open Pit Operations

    By C. Liley

    Open cut blasting at the Ernest Henry mine has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project which was conducted to

    Jan 1, 2012

  • ISEE
    Open Pit Development

    By William C. Burkle

    In this paper, the author has cited essential areas in which the explosives engineer can assist the mine manager in his planning of an entirely new operation or in a major expansion of an existing fac

    Jan 1, 1990

  • ISEE
    Fixortm -A New Approach to Neutralizing Landmines and Uxo

    By Bill Bauet, John Anderson

    There are always security concerns when explosives are transported and stored, and these concerns are intensified in peacekeeping operations where explosives could fall into the wrong hands. MREL Spec

    Jan 1, 2001

  • ISEE
    Experimental Investigation into the TNT Equivalency of Electric, Non-Electric and Electronic Detonators

    By Emily Johnson, Catherine Johnson, Ben Sonpon, Kelly Williams

    The effect of length to diameter of the detonator is compared using Ansys/Autodyn 2-D simulations, the results of which are validated experimentally. It was found that higher pressure comes with a lar

    Feb 1, 2020

  • ISEE
    Time-retarded Chemistry Tweaks Shock/heave Ratio

    By Michael Wieland

    Work-principle computations for explosions underwater or in rock reveal the way the thermodynamic characteristics of surrounding material influence the resulting shock and heave. To reach total thermo

    Jan 1, 2008

  • ISEE
    Quantification of the Levels of Risk of Flyrock

    By Alain Blanchier

    Because in Europe and in many other countries as well every new project (quarry, mine, public work) needs a risk estimation to prove its feasibility, a model to estimate flyrock risks became necessary

    Jan 1, 2013

  • ISEE
    Determination of Ore Fragmentation by Image Analysis in Sercheshmeh Mine

    By Zahra Hosseini, S. Hassan Khoshroo, Mohsen Amirrahmat

    The Sarcheshmeh Copper mine will be developing its open-pit in order to reach to the remaining ore in the deposit. One of the problems regarding the development plan is the ore handling system from th

    Jan 1, 2004

  • ISEE
    Contribution of Up-to-date Modeling and Blast Surveying Technologies to the Improvement of Semi-empirical Flyrock Models

    By Ricardo Chavex, Adrien Letellier

    Flyrock remains one of the most critical issues in open-pit blasting. Despite the significant improvements made with modern surveying methods, the necessity remains to define sensible danger zones aro

    Jan 21, 2025

  • ISEE
    "High Fidelity Computer Modeling of Air-Deck Behavior during RockBlasting"

    By Dale S. Preece, Ruilin Yang

    "Air-decks are often employed for presplitting along the final highwall of a blast and are sometimes also included at the bottom or in the middle of explosive columns in the production portion of a bl

    Jan 1, 2017

  • ISEE
    The Use of Nonel Reefmaster Assemblies

    By Kfw Eick

    The paper describes the use of the Nonel millisecond delay blasting system in narrow, deep, tabular ore bodies and briefly describes the standard stoping method as used on Harmony Gold Mine and compar

    Jan 1, 1990

  • ISEE
    Blasting for Wall Control and Stability using Electronic Detonators at the Bald Mountain Mine, Nevada

    By Kurt Oakes, John Williams

    Placer Dome, US operates the Bald Mountain Mine. The Bald Mountain Mine is a surface operation located in remote northwestern White Pine County in east-central Nevada, approximately midway between Elk

    Jan 1, 2004

  • ISEE
    OPEX Improvement From Migrating to GPS Guidance and Digital Drill Patterns

    By Jose A. Sanchidrián, Ricardo Castedo, Pablo Segarra, Juan Navarro

    A study conducted at a mine site that used traditional field surveying and physical hole spot markings bench marked their combined drill and blast performance. The analysis of the operational expendit

    Jan 1, 2019

  • ISEE
    Pyrotechnic Mortar Pressure and Exit Velocity Study

    By R. Sibley, K. Perry, E. McCorkle, M. Coy

    Black powder has been used in fireworks since the 10 th century in China. To this day, black powder still has a variety of uses, including fireworks, and remains relatively unchanged. Black powder is

    Jan 1, 2024

  • ISEE
    Optimized Blasting Methods for TBM Launching Shaft Construction Beneath the Panama Canal: A Case Study

    By Jose Pineda, Abraham Lindo

    The Panama Metro System’s Network expansion involves excavating a launching shaft for a tunnel boring machine (TBM) to traverse beneath the Panama Canal. The blasting needed for this shaft constructio

    Jan 21, 2025

  • ISEE
    Investigating Planer Propagation of a Shockwave in a Shock Tunnel

    By Joshua Hoffman, Braden Lusk, David McLane, John Rathbun

    The research conducted previously on Shock-Tunnel Waveform Analysis gave a brief insight into the propagation of a shockwave within a shock-tunnel compared to that of an open air arena test. As a refr

    Jan 1, 2012

  • ISEE
    Controlled Explosive Fracturing

    By Ulrich Leiste

    If the iron ore loss is 15% in the process of mining, the total iron ore loss in the world will be about 461 million tons, this is equal to the total production of 230 iron ore mines each of which pro

    Jan 1, 2014