Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Lateral Capacity of Drilled Shafts Considering Push-Pull ResistanceBy Ke Yang
"Drilled shafts are typically used to support structures subjected to large moments at the shaft head. The large moment can produce push and pull forces on the two sides of a drilled shaft. Consequent
Jan 1, 2005
-
Hybrid Shoring Solutions for a Challenging Excavation Project Adjacent to a Subway – 21 Avenue Road, TorontoBy Graeme Smart, Thomas Fiala
"Yorkville Plaza II, a 40-storey signature condominium residence, is scheduled to open on Avenue Road in Toronto’s prestigious Bloor-Yorkville neighbourhood in spring 2017. In close proximity to Toron
Jan 1, 2015
-
Drawdown of Ground Water Control System in Deep Excavation Surrounded by Cutoff Walls: Numerical InvestigationBy Dalia. R. Mohamed, Hisham H. Hafez, Marawan M. Shahien
"Construction activities in major projects that involve deep excavations necessitate the use of vertical walls surrounding the construction site to play an important role as earth retention system. Th
Jan 1, 2016
-
"Static Load Testing" How Important Is It? ? IntroductionBy Jack Hayes
The design and construction of deep foundations involve many uncertainties. For the designer there are uncertainties regarding soil and ground water variability, regarding sampling and lab testing, re
Jan 1, 2000
-
Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West AfricaBy Maurizio Siepi, Bruno Vingiani, Claudio Asioli
"The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill
Jan 1, 2016
-
Case Study: Soil Setup For Piles Driven Into Eastern Coastal Plain Deposits In VirginiaBy Sushant Upadhyaya, Deniz Karadeniz, Ahmed Mohamed
Soil setup analysis provides opportunities for efficiencies in pile foundation design and installation. Soil setup gain with time was evaluated as part of the foundation design and installation for tw
-
Identification and Quantification of Pile RelaxationBy Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam
Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of
Jan 1, 2019
-
Dyna Force Sensors for Monitoring of Tension/Compression Forces in Ground Anchors & PilesBy Shahid Islam, Lucian Bogdan
"The maintenance of infrastructures has been of particular concern to the engineering community. As the world’s infrastructure expands and existing infrastructure ages, monitoring and evaluation of th
Jan 1, 2017
-
Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, CaliforniaBy Roberto A. Lopez, Eric Lindquist, Jon Bussiere, Dean Iwasa
"The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) un
Jan 1, 2015
-
Soil Mixing for the Rio Puerto Nuevo Project in San Juan, PR: A Case HistoryBy Filippo Maria Leoni, Wesley Schmutzler, Matteo Bertoni
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project (Project) in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 92 inch ID forced sewer main relocation and to
Jan 1, 2015
-
Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle EastBy Brian Metcalfe, Kord Wissmann, Gianni Martinez
The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large
May 1, 2022
-
Session 32 "Grout Mixtures and Materials 3"By Lois G. Schwarz
I did a project (Sungai Piah) as a consultant to your firm in Malaysia, where we were faced with a similar situation as sketched out in your question. The following is what we did for the grouting of
Feb 10, 2003
-
Seismic Design for the I-30 Crossing Project in Little Rock, ArkansasBy David S. Graham, Benjamin Turner, Paul J. Axtell
Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an
Sep 8, 2021
-
The Importance Of Tension Softening (Of Concrete) In Modelling Of Tension PilesBy Qingwei Joshua Ong
Tension piles, also known as uplift or anchor piles, are necessary to resist uplift forces that might cause structural distress. In excavation projects, most uplift forces are developed because of hyd
Nov 1, 2022
-
High-Capacity Driven-Pile Foundation for a 33-Story High-Rise in Milwaukee, Wisconsin, USABy Patrick J. Hannigan, William H. Walton, Ryan C. Rusk, Van E. Komurka
"The project consists of a 33-story building with two levels of below-grade parking across the entire building footprint. Timely and cooperative teamwork among the owner/developer, geotechnical engine
Jan 1, 2017
-
Bi-Directional Testing Using Super Cells for the Jiaxing-Shaoxing River Crossing BridgeBy Diane Reid, Antonio Marinucci, Robin Mao
Super Cells are an innovative, open-shaped bi-directional static load testing device used to promote concrete flow during placement while utilizing greater cross-sectional area of the pile to achieve
Jan 1, 2019
-
Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation MethodsBy Ali Azizian, Brian Hall
"Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir
Jan 1, 2016
-
Foundation in Simsima Lime Stone for an Underground ReservoirBy Chandramohan P. V., Ravi Kishore
"An underground reservoir was to be constructed at Doha in Qatar. Simsima lime stone is present at the bottom. When the reservoir is empty, there will be uplift at the bottom but this will change to d
Jan 1, 2017
-
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007