Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cannonsville Dam Emergency Borehole ResponseBy John Vickers, William H. Hover, Paul C. Schmall
"Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n
Jan 1, 2016
-
Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee ProgramBy Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas
The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re
Sep 8, 2021
-
Augered Cast-In-Place And Continuous Flight Auger Pile Foundation Systems For US Highway Projects - Why ACIPICFA Pile Foundations?By Silas C. Nichols
FHWA Interest is due to: ? An increase in successful projects in the U.S. private sector and in other countries ? Cost effective and more efficient in many circumstances ? Agency Prioritie
Jan 1, 2005
-
Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille
"Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair
Jan 1, 1900
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
Numerical Modeling of Foundation Deformation Due to Fault Rupture (718b3bb2-ba73-41ae-ad4b-2a32fb89742b)By Orestis Zarzouras, Amalia Giannakou, Jacob Chacko
"When designing structures in seismically active areas, foundations of critical structures are typically located away from known faults. Indeed many seismic codes prohibit construction in the immediat
Jan 1, 2017
-
Experiences Using A Leader System For Long Cfa(Acip) Piles In HawaiiBy Damien Enright, Franz-Werner Gerressen
CFA/ACIP pile is the most used single pass drilling method for deep foundation installations. It is constructed by rotating and driving a Continuous Flight Auger (CFA) into the ground at a controlled
Oct 1, 2022
-
An Analysis of LRFD for Helical AnchorsBy Ronaldo Luna, Donald Deardorff
"The use of load and resistance factor design (LRFD) is well documented since the 1960s for structural applications when it was first adopted into the American Concrete Institute Building Code in 1963
Jan 1, 2009
-
Deep Excavation with Well Point Dewatering in Soft SoilBy Mihir B. Roy
"Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of
Jan 1, 2015
-
Deep Cfa Piles Application For Foundation In QueenslandBy Sameh M. Khella
This paper discusses the application of deep CFA piles for the foundation of structures in different ground stratifications with a focus on the application in Queensland region. Design, construction t
Nov 1, 2022
-
Rock Excavation and Underpinning below a 19-Story BuildingBy Kevin P. Gleckler, Steven C. Highfill
"Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which
Jan 1, 2016
-
Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike RehabilitationBy Michael Arnold
"BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d
Jan 1, 2015
-
Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current PracticeBy Jim Slatter, Ben Collingwood
"It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali
Jan 1, 1900
-
Systematic Laboratory And Field Study On The Shear Resistance Of The Soil-Concrete Interface Of Diaphragm Walls And Bored PilesBy Matthias Pulsfort, Jiarui Du, Torsten Wichtmann, Achim v. Blumenthal, Diethard König, Rowena Verst
The influence of the interaction between support fluid and soil, e.g., filter cake formation, on the shear stress transfer in the soil-concrete interface of diaphragm walls and bored piles is still co
May 1, 2022
-
Numerical Modeling Of Foundation Deformation Due To Fault RuptureBy Amalia Giannakou
When designing structures in seismically active areas, foundations of critical structures are typically located away from known faults. Indeed many seismic codes prohibit construction in the immediate
-
Water Powered Percussive Downhole Hammers – Energy Savings And ProductivityBy Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
Marine Clay Stabilisation Using An Encased Stone Column With Tyre Chips As AggregatesBy Rangaswamy. K, Naga Sivaji
A stone column is one of the most commonly employed methods of ground improvement techniques. This method used to increase the strength, decrease the compressibility of loose granular and finegrained
Nov 1, 2022
-
Session 28 "Modeling and Verification"By Dawn Shuttle
In trying to find a grout, or some kind of stabilizer that would work in this application, we established some performance criteria. Of those, what I controlled the most was viscosity, then I had a wh
Feb 10, 2003
-
Emergency Stabilization to Maintain CN Rail ServiceBy Rick Deschamps
"Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site
Jan 1, 2017
-
Today’s Connectivity: Using Historical Data to Anticipate Future RiskBy Michael Frawley, Deana Ruud, Jessica Turner
Technology is allowing for new ways to mitigate risk associated with subsurface exploration and unanticipated subsurface conditions during construction. Unanticipated subsurface conditions have the po
Jan 1, 2019