Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Spontaneous Combustion - A Coal Mining Hazard

    By R. N. Chakravorty, K. K. Feng

    "There is growing evidence that modern methods of mining coal increase the risk of spontaneous combustion. Seemingly unimportant at this time, this hazard could prove to be a barrier to growth and dev

    Jan 1, 1973

  • CIM
    Industrial Engineering at the Jeffrey Mine

    By J M. Fletcher

    The responsibility and scope of the Industrial Engineering Department, as organized at the Jeffrey mine, has been broadened to include any study, project or report that could result in more effective

    Jan 1, 1963

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • CIM
    Establishing the process mineralogy of gold ores

    By B. Jago

    From the perspective of metallurgical processing, gold ores can be classified into freemilling and refractory ores. Their extractive metallurgy is largely driven by mineralogical factors such as gold

    Jan 1, 2006

  • CIM
    Treatment of and Gold Recovery from Effluent at Giant Yellowknife Mines Limited

    By G. Halverson, K. Blower

    "Giant Yellowknife Mines Limited (Giant) has been producing gold since 1948. Located at Yellowknife, Northwest Territories, Canada, see Figure 1, the mine processes approximately 1,200 short tons per

    Jan 1, 1987

  • CIM
    Mill Operations - Lean and Keen

    By P. R. Richardson

    "Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,

    Jan 1, 1988

  • CIM
    The Texasgulf Concentrator Expansion

    By A. M. Hill

    "This is an account of the expansion of Texasgulf's Timmins concentrator by the building of a fourth circuit.The original capacity of the mine and concentrator was 3.6 million tons per year of ore. In

    Jan 1, 1979

  • CIM
    The Nanisivik Mill

    By A. C. T. Bigg

    "The mineral potential of the Nanisivik area was discovered as far back as 1910 when a prospector of the Geological Survey of Canada, on an expedition under Captain J. G.Bernier, recorded a deposit of

    Jan 1, 1980

  • CIM
    Comparison of Penzien and Wang analytical methods with the finite difference numerical method in seismic analyses of the Qazvin-Rasht (Kuhin) tunnel

    By F. Hassani, R. Mikaeil, B. Ferdowsi

    Two analytical solutions for estimating the ovaling deformation and forces in circular tunnels are widely used in engineering practice, due to soil-structure interaction under seismic loading. This pa

    Jan 1, 2008

  • CIM
    The Boseto Copper Project

    By Brad Sampson

    Project Ownership ?Discovery Metals Limited ?ASX (DML), BSX (DML), AIM (DME) ?Market Cap AUD 195M ?Key assets ?Boseto Cu ?Dikoloti Ni The Boseto Copper Project ?Location ?Setting ?History

    May 1, 2010

  • CIM
    A Plant-Wide Control System for Flotation Level Control

    By D. G. Hulbert, J. H. Schubert, R. G. D. Henning

    "Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever

    Jan 1, 1995

  • CIM
    A Reservoir Study of the Pincher Creek Field

    By F. D. Aaring

    "IntroductionTHE PINCHER CREEK gas condensate field, in Township 3, Range 28, and Townships 3 and 4, Range 29, West of the Fourth Meridian, was discovered in 1947 by the Canadian Gulf Oil Company with

    Jan 1, 1952

  • CIM
    Numerical Modelling of a Brazilian Disc Test of Layered Rocks using the Combined Finite-Discrete Element Method

    By O. K. Mahabadi

    The scope of this study is to simulate the behaviour of a layered rock sample under standard laboratory Brazilian Disc test using an innovative combined finite-discrete element method (FEM/DEM) resear

    May 1, 2009

  • CIM
    The Optical Properties of Mixed Au and Pt Nanoparticle Colloids

    By Daven N. Compton

    The optical properties of Au nanoparticles have been known for some time, with both Au colloids and Au nanoparticles embedded in glasses having been extensively studied. In this study, Pt nanoparticle

    Oct 1, 2003

  • CIM
    Water Supply Sourcing Options for Oil Sands Mines

    By Leslie F. Sawatsky

    Each potential oil sands developer deals with the question of optional sources of raw water to supply large water demands that range from 50 to 80 million cubic metres per year for each of six existin

    May 1, 2004

  • CIM
    Learning From Experience: Aboriginal Programs In The Resource Industries

    By Barrie Robb

    Outline 1. Mackenzie Aboriginal Corporation (MAC) 2. ACR background 3. ?Learning from Experience? project - What - Why - lessons 3. How Industry could contribute to sustainable Aboriginal comm

    May 1, 2008

  • CIM
    Leaching Practice at Denison Mines an Historical Review

    By E. LaRocque

    "Denison Mines Limited has been processing uranium ore in the Elliot Lake area since May of 1957. The ore body is located i11 the Huronion sediments on the north limb of the Quirke Lake syncline. Mine

    Jan 1, 1979

  • CIM
    Environmental Relevance of the Leachate Potential for Dry Storage of Delayed Coke

    By Joseph L. Fournier

    Suncor Oil Sands employs delayed coking technology in converting bitumen into synthetic crude oil. Currently up to 10,000 m3 of delayed coke (coke) is produced per day as a byproduct of the upgrading

    May 1, 2011

  • CIM
    A hydrometallorgical process for the extraction of copper

    By W. A. Ahrens, J. H. McNamara, J. G. Franek

    "An economical, pollution-free process has been developed for the hydrometallurgical extraction of copper from sulphide ores. The extracted copper, in the form of cuprous chloride (CuC/), is converted

    Jan 1, 1980

  • CIM
    Process Improvements at Placer Dome Campbell Mine

    By K. Norris

    "The Campbell mill has undergone numerous changes over the past 43 years. However the rate of change has increased significantly in the last 4 years. A new grinding circuit, carbon-in- pulp circuit, p

    Jan 1, 1992