Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Integrating Blastholes into Exploration Data to Improve Coal Recovery and Modelling

    By H Stedman

    Integrating exploration and operational blastholes into one database significantly enhances geological modelling. Benefits include: improved coal predictions, stronger interpretation of structurally c

    Aug 18, 2014

  • AUSIMM
    Autogenous Grinding in the Warrego Concentrator of Peko Mines N.L.

    By Stevenson C. H, Lynch A. J

    The reasons for choosing autogenous grinding for the new Warrego concentrator of Peko Mines N.L. are discussed and the ores to be treated in the concentrator are described. The mill was designed on t

    Jan 1, 1974

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • AUSIMM
    Estimation of rock brittleness for jointed specimens under cyclic triaxial loading

    By P Khalkho, M Singh

    Rock masses when subjected to uniaxial or triaxial cyclic loading (eg in hydraulic running tunnels, during retrieval and injection of oil and gas from storage underground caverns and haulage roads), t

    Nov 29, 2022

  • AUSIMM
    Environmental Planning for Mining of Cable Sands' Minninup Deposit, Western Australia

    By Martinick WG

    In July 1986, Cable Sands (W.A.) Pty Ltd commenced mining for mineral sands at Minninup, approximately 16 km south of Bunbury, Western Australia.The area being mined is from the heel of the foredune t

    Jan 1, 1986

  • AUSIMM
    Organisational Improvement Through Graduate Program Evolution

    By M McCarthy

    Attraction, recruitment and retention of quality mining engineers is becoming increasingly difficult for many mining companies. Part of the problem is attracting young professionals, especially given

    Jan 1, 2005

  • AUSIMM
    Murrin Murrin Heap Leaching Project

    By N Meadows, M Rodriguez

    A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto

    Jan 1, 2006

  • AUSIMM
    Bringing Split Flotation to Reality ù The Cannington Experience

    The BHP Billiton Cannington mine uses sequential flotation to treat a silver, lead and zinc ore supplied from an underground mine. The final products from the process plant are a silver rich lead conc

    Jan 1, 2003

  • AUSIMM
    Incorporating economic variability into a strategic planning framework

    By E Holloway

    The optimisation of an open pit mine can be broadly split into two stages, the first being the ultimate pit optimisation (and subsequent stage designs), and the second being schedule optimisation. Mac

    Nov 21, 2018

  • AUSIMM
    Geology, Metallurgy and Mining Engineering - Why We Must Strengthen the Links

    Recent well-publicised problems with the start-up of new mining projects have continued to feed the perception that the mining business in general and Ore Reserves in particular are a poor risk. New m

    Jan 1, 2002

  • AUSIMM
    Atomic Force Microscopy ù A New Characterisation Tool for Flotation Research

    By B M. Moudgil

    Atomic force microscopy (AFM) has become an important tool for understanding the nano- to molecular scale mechanisms predominant in multiphase systems. In flotation research, the use of AFM holds pro

    Jan 1, 2005

  • AUSIMM
    Effect of SiO2 on the structure and crystallisation of CaF2-CaO-Al2O3 slag used in electroslag remelting

    By S Basu, P M. Midhun

    Electro-Slag Remelting (ESR) is a process capable of producing ingots with much lower centre-line segregation and better internal soundness than conventional ingot casting processes, as well as lower

    Jun 19, 2024

  • AUSIMM
    A Facies Model for an Active Composite Volcano: Ruapehu, New Zealand

    By Houghton BF

    Ruapehu is an extremely active andesitic composite volcano, built in at least four cone- building episodes over the last 250 ka. The volcano was constructed by a variety of extrusive and subplinian

    Jan 1, 1987

  • AUSIMM
    Computational Modelling Studies of Ventilation Management for Underground In-seam Drilling Sites

    By F Hungerford, T Ren

    "Gas management has always been a major concern for the ventilation officer of any gassy mine. With an increase of mining depth and gas content, there is a great demand for the development of in-seam

    Aug 31, 2015

  • AUSIMM
    Sulfur loss from the slag during desulfurisation of liquid steel

    By S Karosiya, A Sharma, M Jain, N N. Viswanathan, M M. Pande, D Kumar, S Kumar

    Desulfurisation of steel during ladle refining is governed by both thermodynamics and kinetics. For effective desulfurisation, thermodynamically, a low partial pressure of oxygen at the steel-slag int

    Aug 21, 2024

  • AUSIMM
    1991 New Zealand Branch Annual Conference û Appendix

    1991 New Zealand Branch Annual Conference û Appendix

    Jan 1, 1991

  • AUSIMM
    The Use of Blasting Models for the Optimisation of Mine Productivity

    By Paine GG

    In coal mining each of the unit operations are interrelated with each preceding operation having an effect on subsequent operations. This presents difficulties for determining when the lowest overa

    Jan 1, 1987

  • AUSIMM
    Water Systems for Distributing Cooling in Deep South African Gold Mines

    By De Carvalho J

    The average installed refrigeration capacity on South African gold mines has increased by about eighteen per cent annually for the past 15 years; both the number of installations and their duties h

    Jan 1, 1988

  • AUSIMM
    An Insight into the Direction of Environmental Management in New Zealand's Coal Industry

    By T Clemens, D Trumm

    Adopting environmentally acceptable practices in New Zealand is a crucial requirement for mineral wealth development. Recent planned expansions in the coal industry have increasingly placed mining in

    Jan 1, 2004

  • AUSIMM
    Mechanical Factors in the Fatigue of Steel Rock Drill Rods

    A method is presented for calculating the number of cycles of stress to failure of a drill rod from operating variables; a mathematical analysis by Cooper of the stresses present in drill steels is ap

    Jan 1, 1955