Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Testing of Soil Covers for Waste Rock in the Ronneburg WISMUT Mine ClosureBy S Jahn, M Noel, E M. Rykaart, M Pau
Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m
Jan 1, 2003
-
Baseline Ground Settlement and Groundwater Monitoring for Tunnelling – A Case Study in MelbourneBy I Lamb
Past experience of ground settlement and groundwater monitoring for tunnelling projects in Melbourne has provided an appreciation of the value and importance to owners of establishing a broad baseline
Mar 8, 2011
-
The System of Costs Keeping at The Broken Hill Junction North Mine.By Ross R
Although mining is an old industry its management is quite a new science, and its complications are now being recognised as demanding expert knowledge in many branches of technical and professional ed
Jan 1, 1911
-
The Product Quality System at Cliffs Natural Resources – Koolyanobbing Iron Ore OperationsBy A L. Wills
Cliffs Natural Resources Pty Ltd (Cliffs) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three separate hubs and trucked to Koolyanobbing. There it is crus
Jul 11, 2011
-
The use of the CyanosaveÖ Detoxification and Cyanide Recovery Process for Cyanide TailingsBy Huber A. L
Research and development into alternate gold and precious metals adsorbents has resulted in the development of a new technology named the AUROSAVE adsorption process (ARGOSAVE'" for high silver
Jan 1, 1988
-
"A Geometallurgical Proxy for Nickel Laterite Heap Leaching"By J Li, A McFarlane, J Yu, L L. Kuhar, R Meakin, N Chapman
"Column leach tests are used frequently to predict recoveries and reagent consumption for nickel laterite heap leaches. These column leaches often run for more than 100 days and therefore require long
Jun 15, 2016
-
Site Investigation and Design for Melbourne’s New MetroBy H Asche
The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper
Mar 8, 2011
-
Optimal Inference of Modelling Parameters to Simulate Complex Trends across Soft Boundaries – A Case Study in Heavy Mineral SandsBy T Wambeke, J Benndorf
A risk-robust development of a heavy mineral resource requires an assessment of the geological uncertainty and spatial variability of the key factors impacting the mining and processing operation. Att
Nov 24, 2014
-
Prediction of Burden at the Sungun Copper Mine by Artificial Neural NetworkBy H Khoshrou, A Siamaki
Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b
Sep 26, 2011
-
A Review of the In Situ Stress Database for Tunnel Design in the Hawkesbury Sandstone, Sydney, New South WalesBy G McKay, M Erskine, S Macklin
The City of Sydney is currently investing in a number of infrastructure projects that require tunnel excavations within the Triassic Hawkesbury Sandstone. It is generally accepted that this formation
Sep 17, 2014
-
An Automated System for Flyrock and Fume Monitoring of BlastsBy C K. McKenzie, P Popov, B E. Papillon, I Kharitonenko
Flyrock produced by blasts in surface mining and quarrying is a major hazard that can result in serious injuries or property damage. This paper presents a fully integrated and automated approach for r
Aug 24, 2015
-
Management of Health and Safety in Tunnelling – Application of Australian Coal Mining KnowledgeBy G Marling, A Calderon, J Harris, P Kirsch, M Shi, D Sprott, A Kirsch
Large-scale infrastructure construction needs to comprehensively manage risks that can impact the health and well-being of many people, from workers (temporary, contracted or full time), to families a
Sep 17, 2014
-
Geophysical blasthole samplingBy C Simpson, J Market
The process of sampling blasthole cones utilising personnel to manually shovel material into sample bags is a long-standing industry accepted process. However, this method has several drawbacks, inclu
Nov 8, 2021
-
2020 Vision ù The Manager of the 21st CenturyBy E Hondros
Innovation and Business Skills Australia (IBSA) commissioned The Boston Consulting Group (BCG) to undertake a study into how the role of AustraliaÆs senior managers is likely to change between now and
Jan 1, 2006
-
Characterisation of Microstructure and Mechanical Properties of Structural Mortar of Glass Insulators Employed in Transmission LinesBy C K. Suzuki, J A. Yanaguizawa, D M. F de Santana, L R. P Leite, A H. Shinohara
In the present work, the microstructure and mechanical properties of structural mortar from glass insulators were studied by X-ray fluorescence, X-ray diffraction, infrared spectroscopy, microhardness
Jan 1, 2008
-
Mine Geology of the MacPhersons Reward Gold Mine, Coolgardie, Western AustraliaBy M D. Goodz
MacPhersons Reward gold deposit is in a post-kinematic tonalite intrusion which is a setting different from many other deposits of the Coolgardie goldfield that are hosted in early Archaean tholeiitic
Aug 22, 2011
-
Availability and UtilisationExcavator output rates given in Makers' catalogues are sometimes based on favourable operating conditions. Mine operators and planners are more interested in the Effective Hourly Output in no
Jan 1, 1981
-
Overcoming implicit modelling software limitations using Python scripting – an innovative geological modelling workflow for George Fisher Mine, Queensland, AustraliaBy L Bertoss, D Carvalho
In the last decade, the use of advanced implicit modelling software/algorithms in mineral resource workflows has become a best practice in the mining industry. In most cases, these workflows can easil
May 24, 2023
-
Tunnelling in the Andes in Chile – By Drill and Blast and Tunnel Boring MachineBy R Fletcher
Pacific Hydro, a leading renewable energy company from Australia, is developing a series of cascading run-of-river hydro electricity projects in the Cachapoal Valley at the base of the Andes Mountains
Mar 8, 2011
-
Chasing the Lead/Zinc/Silver Lining – Establishing a Resource Model for the Historic CML7, Broken Hill, New South Wales, AustraliaBy D Smith
The Broken Hill deposit is located in Australia in the far western region of New South Wales. The deposit was found in 1883 and has been mined continuously since its discovery. It is considered the la
Aug 22, 2011