Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Preparing for Uncertain Mineral Futures - A Survey of AusIMM Members on the Future Issues and Drivers for the Australian Minerals Industry

    By C Mason, A Littleboy

    This paper presents the results of a large scale survey of The Australasian Institute for Mining and Metallurgy (AusIMM) membership. This survey aimed to understand and define the key issues and drive

    Jan 1, 2009

  • AUSIMM
    Operational Geotechnical Engineering at the Ok Tedi Mine, Papua New Guinea

    By Cortes JP

    In a dynamic environment such as the Star Mountains of Papua New Guinea Geotechnical Engineering for the Ok Tedi Project must be described as both interesting and challenging. To be effective a rea

    Jan 1, 1997

  • AUSIMM
    Underground Extension of the FGC Line in Sabadell through Cemented Soils

    By R Justa Cámara, J María Bertrán Llop

    "The need for suitable geotechnical characterisation of the rock mass for underground construction is evident. The enlargement project of Railways of the Generalitat of Catalunya (FGC) in Sabadell is

    Sep 17, 2014

  • AUSIMM
    New Zealand's Mining and Mineral Exploration in Perspective

    Miners and mineral explorers are concerned at the increasingly hostile environment being generated towards their industry and their profession. There is little official or public recognition that the

    Jan 1, 1977

  • AUSIMM
    A cost-effective tool to assess iron ore products and optimise their operations in blast furnaces towards decarbonisation – state-of-the-art CFD models

    By X Yu, Y Shen

    The iron ore products should be assessed in terms of in-furnace behaviour and overall furnace performance, their operation should also be optimised under industry-scale blast furnace (BF) conditions,

    Sep 18, 2023

  • AUSIMM
    Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016

    By J Darbritz

    "This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016

    Nov 15, 2016

  • AUSIMM
    Upgrading of the Mechanical Braking System of a Large Blair Multi-Rope Rock Hoist

    By J Harmse

    This paper deals with the modernisation of the brakes on an electrically coupled Blair multi-rope hoist and covers the removal of the old calliper brakes and hydraulic control system, and its replacem

    Jan 1, 2005

  • AUSIMM
    Tectonic Setting of Permian Coal Basins of Eastern Australia

    The coal basins that formed near the margin of Permian Australia were comparable in size with the Appalachian coalfields and with the European fields between Wales and Poland. They formed on the f

    Jan 1, 1987

  • AUSIMM
    Floatability of Streams Around the Cominco Red Dog Lead Cleaning Circuit

    By Frew J. A, Harris M. C, Manlapig E. V

    The recovery achieved in a flotation process is a function of both the characteristics of the feed stream and the operating conditions within the flotation cell. In this paper, the flotation charact

    Jan 1, 1997

  • AUSIMM
    Problems of Forecasting Metal Prices

    There are serious problems in forecast- ing accurately and achieving this goal depends on good quality information, correct assumpt- ions and sound analysis. planner. The forecaster must focus attent

    Jan 1, 1983

  • AUSIMM
    Special Purpose Simulator for Improved Estimation of Day-to-Day CIL/CIP Recoveries

    Sampling of CIL/CIP circuits is typically done by compositing samples of feed and tails over eight or 12 hour periods. As the residence time in the leaching tankage may be approximately 20 hours, the

    Jan 1, 2006

  • AUSIMM
    Value Added in the Mineral Sands Industry

    Mineral Sands - "An Industry for the Future"The mineral sands industry is matched only by the gold industry in relation to its current buoyancy. The strong demand for the various mineral sands product

    Jan 1, 1986

  • AUSIMM
    The Mineral Equation

    It is my pleasure to deliver the first Keynote Address to the first joint conference between The Australasian Institute of Mining and- Metallurgy and The American Institute of Mining, Metallur- gic

    Jan 1, 1978

  • AUSIMM
    A Broker's Overview of Mineral Valuation Methodologies

    A broker relies heavily on mineral valuations and independent experts' reports to provide the fundamental information, both technical and commercial, which provides the basis of estimating the

    Jan 1, 1994

  • AUSIMM
    Sensor-based Real-time Resource Model Reconciliation for Improved Mine Production Control – A Conceptual Framework

    By M W. N Buxton, M S. Shishvan, J Benndorf

    The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,

    Nov 24, 2014

  • AUSIMM
    Uranium Mining Operations at Ranger Northern Territory, Australia

    By Savory P. J

    Uranium mining operations commenced at Ranger mine site, Jabiru NT Australia in May 1980. The Ranger orebodies, totalling approximately 110 000 tonnes contained U305 had been indicated by airborne rad

    Jan 1, 1993

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
    Open Issues in Tunnel Boring Machine Excavation of Deep Tunnels

    By G Barla

    In Europe, a major interest in the infrastructure and tunnelling fields is in the new crossings of Alps in the form of base tunnels, which are important components of the high-speed (for passengers)/h

    Mar 8, 2011

  • AUSIMM
    Heavy Medium Separation at Iscor's Sishen Iron-Ore-Mine

    The Sishen iron-ore-mine produces 3 pro= ducts with size gradings of 25 to 8 mm, 11 to 5 mm and 5 to 0,2 mm and has a product capacity of 20 Mtpa. Ore is produced at an average Fe content of 66,2

    Jan 1, 1987

  • AUSIMM
    Study on Mining Method in Deep Position of Jinchuan Nickel Mine, China

    By C Li, S Wang, L Qiao

    Jinchuan nickel mine is the largest nickel mine in China. Cut-and-fill mining method with high density cementing materials is used in the mine. The original mining design divided the mining operation

    Jan 1, 2000