Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Oxidative Dissolution of Nickel Sulphide Precipitated from a Nickel Refinery Waste Stream

    By Dyson NF

    Nickel sulphide precipitated from waste liquors at the Yabulu plant of Queensland Nickel Pty Ltd was pressure leached under various conditions. Leaching at 130¦C and 700 kPa of air dissolved 95 pe

    Jan 1, 1984

  • AUSIMM
    Parameter Adaptive Modelling of Mineral Beneficiation Processes

    Data logged on mineral beneficiation processes during normal operation are analysed using time series (correlation and spectral) methods to identify the dynamics of the processes for on-line computer

    Jan 1, 1985

  • AUSIMM
    Education needs for Research and Industrial Practice in Geological Engineering

    Geological. engineering is a field of engineering practice concerned with design and construction of excavations and structures in soil and rock masses. The role of geological engineering in mining

    Jan 1, 1986

  • AUSIMM
    Design Considerations for Reinforcement of Coal Mine Roadways in the Illawarra Coal Measures

    The application of reinforcement techniques to enhance the stability of underground coal mine roadways subject to high stresses is discussed. Research conducted in the Illawarra Coal Measures h

    Jan 1, 1986

  • AUSIMM
    Electrowinning of Copper at High Current Densities Part I

    By Andersen AK

    As part of a research program sponsored by Continental Copper and Steel Industries, Inc. (cos), investigations have been conducted by the Colorado School of Mines Research Foundation, Inc. to study

    Jan 1, 1969

  • AUSIMM
    The Physical Structure of Cast Iron and Its Relation to Cupola Practice

    IT is very difficult for a founder engaged in jobbing work, comprising all sizes and classes of castings, to appreciate that the analysis of the iron he is using cannot entirely fill the situation he

    Jan 1, 1926

  • AUSIMM
    KR process-production of hot metal on the basis of non-coking coal

    By Kepplinger W

    The KR Process is a joint development by VOEST-ALPINE, Austria and its subsidiary company KORF ENGINEERING, Germany. This new technology allows production of hot metal on the basis of non-coking

    Jan 1, 1986

  • AUSIMM
    Bacterial Oxidation - An Economic Alternative for the Treatment of Refractory Gold Concentrates

    By Budden J. R, Rhodes M. K

    Bacterial oxidation technology was successfully applied in a mine site pilot plant for the treatment of refractory gold concentrates. The bacterial culture was proven capable of selectively breaking

    Jan 1, 1991

  • AUSIMM
    Composition and Electrochemistry of Nickel Matte: Implications for Matte Leaching and Refining in Acid Solution

    By Ho E

    Analyses of several nickel mattes from around the world show a significant variation in their copper content. Typically, matte contains an alloy, heazlewoodite and a copper sulphide phase. The vario

    Jan 1, 1996

  • AUSIMM
    Grinding Control Development at ZC Mines

    By Freeman N

    A microcomputer based control system has been developed and implemented at ZC Mines (now Pasminco Mining). The control system maximises throughput at a product size set point while maintaining a &quot

    Jan 1, 1990

  • AUSIMM
    Rare Earth Element Deposits and Prospective Areas in South-East Asia

    By K Sanematsu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Ore deposits of rare earth elements (REE) in South-East Asia are classified into four types

    Mar 18, 2015

  • AUSIMM
    Monitoring Equipment Productivity Improvements in Coal Mines

    By Sengstock G. W, Spathis A. T

    Benchmarks of mine equipment involved in the excavation process of coal mines would suggest that such equipment is not always operating at an optimum level. Dragline operations and truck/shovel oper

    Jan 1, 1995

  • AUSIMM
    Post Pillar Cut and Fill Stoping at the Dolphin Mine of King Island Scheelite

    By Bedford D. J

    The post pillar cut and fill stoping method has been adopted by King Island Scheelite for the extraction of the main Dolphin orebody. The orebody is a massive, tabular deposit varying from 10 to 50

    Jan 1, 1977

  • AUSIMM
    The Break Up of Recoverable Reserves at High Cut-offs

    By Armstrong M, Kleingeld W. J

    Current low prices for many metals mean that deposits have to be mined at high cut-offs (relative to their mean grade), which means that only a small percentage of mining blocks are above cut-off.

    Jan 1, 1995

  • AUSIMM
    Profit Drivers in the Open Cut Coal Industry

    The æProfit Driver ModelÆ is a tool which builds costs from first principles and integrates revenue, costs and physical mining parameters and, hence, can quantify the impact and leverage on profit. In

    Jan 1, 2000

  • AUSIMM
    The Design and Construction of the Excavation for the Hoppers Crossing Pump Wells

    By Nichol R

    - PART A The Hoppers Crossing Pumping Station is one of the principal components of the Western Trunk Sewer Project which replaces the 90 year old Main Outfall Sewer and will convey 60% of Melbour

    Jan 1, 1987

  • AUSIMM
    Notes on the Delayed Method of Stope Filling at Mount Isa Mines Limited

    Introduction.History of Stope Filling at Mount Isa.The Need for a Systematic Fill Programme.Reasons for Filling.Fill Materials and Tonnages.Rough Mullock Fill.Quantities Readily Available.Fill Pass De

    Jan 1, 1953

  • AUSIMM
    Perspectives on Mineral Commodity Price Cycles and their Relevance to Underground Mining

    By J P. Sykes, A Trench

    Mineral commodity prices are subject to volatility over both the short and longer run – driving fluctuating operating margins for mining companies over time. Such market dynamics influence mine operat

    Mar 24, 2014

  • AUSIMM
    Blast Vibration Control by Wavefront Reinforcement Techniques

    By Moore A. J

    This paper describes the use of a wavefront reinforcement model which has been developed to supplement established charge mass scaling methods. The model allows for the time taken for blast vibratio

    Jan 1, 1995

  • AUSIMM
    The Manufacture of Hot and Cold Finished Seamless and Welded Steel Tubing

    By Cotton P. L

    Although the terms "pipe" and "tube" are normally considered synonymous, a distinction is often drawn, the former term being applied to the hot finished product and the latter to c

    Jan 1, 1951