Search Documents

  • SME
    Wetting The Coal Face For Dust Control In Longwall Mining At High Ventilation Air Speeds

    By J. -G. Swanson

    Dust control in longwall coal mining depends primarily on the prevention of dust at the source and secondarily on the suppression of airborne dust. One of the primary methods for the prevention of du

    Jan 1, 2012

  • NIOSH
    MLA 10-83 - Mineral Investigation Of The Sill Hill Rare II Area (No. 5304), San Diego County, California

    By Thomas J. Peters

    A mineral survey of the Sill Hill RARE II area (No. 5304), covering 5,200 acres (2,100 ha) of the Cleveland National Forest, San Diego County, California, was conducted by the U.S. Bureau of Mines and

    Jan 1, 1983

  • SME
    China Featured at the Minnesota Conference

    By William R. Yernberg

    The combined 79th Annual Minnesota Section of SME Meeting and 67th Annual University of Minnesota Mining Symposium was held April 11 and 12, 2006, in Duluth, MN. About 300 mining professionals attend

    Jan 1, 2006

  • SME
    Solving Process Plant Vibration Problems

    By Adriaan de Villiers

    Many conventional structural analysis and design methods in current use are not appropriate for the mining industry. Two major reasons for this are that: • The economic life of a particular mine is l

    Jan 1, 1992

  • NIOSH
    OFR-68(3)-81 An Annotated Bibliography Of Metal And Nonmetal Mine Fire Reports - Appendix - Introduction

    This appendix is composed of five sections, each of which is tabbed for ease of access. The sections are as follows: ? Fire incident report forms for underground mine fires. There is one form for eac

    Jan 1, 1980

  • AUSIMM
    An Application of Depressant BK510 in Separation of Molybdenite and Bismuth by Flotation

    An Application of Depressant BK510 in Separation of Molybdenite and Bismuth by Flotation

    Sep 13, 2010

  • SAIMM
    eForce..Newest generation of electrostatic separator for the minerals sands industry

    By E. Yan

    Electrostatic separation has been a mainstay of minerals sands flowsheets for over 50 years. Recent electrostatic developments have shown better conductor/non-conductor separation than technology prev

    Jan 1, 2003

  • SME
    Comparison Of Field Measurements With Finite Element Results--Capitol Hill Relief Sewer Section II (Washington, D.C.) --

    By Delon Hampton, Francis K. Mensah-Dwumah

    INTRODUCTION The state-of-the art in the area of soil-structure interaction is not sufficiently developed that one can accurately predict the earth load distribution on buried structures. This lack

    Jan 1, 1979

  • AUSIMM
    Lean Iron Ore Beneficiation in India

    Lean Iron Ore Beneficiation in India

    Sep 13, 2010

  • NIOSH
    OFR-140(1)-83 Development And Fabrication Of A Continuous Miner Training System

    By C. W. Morris

    This Final Report describes the major technical activities that were accomplished to produce a comprehensive continuous miner training system (CMTS) for coal industry utilization. The primary product

    Jan 1, 1982

  • CIM
    The Red Dog VIP Mill Optimization Project A Study in Fast-Track Project Execution and Alliance Contracting (5aae1f12-06e2-4656-a27b-a608072456ab)

    By George H. Hope, Steve Ciccone

    "The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes pe

    Jan 1, 2003

  • NIOSH
    Mineral Investigation Of The John Muir Wilderness; Fresno, Inyo, Madera, And Mono Counties, California

    By Fredrick L. Johnson

    In deposits of the John Muir Wilderness, tungsten is the principal metallic element. Gold, silver, copper, and molybdenum could be recovered as by-products from most of the tungsten deposits. More tha

    Jan 1, 1981

  • AIME
  • ISEE
    Underground Applications Using the New EZDrifter Dual Delay Detonator System

    By Pierre L. Labelle

    Non electric Dual Delay initiators have revolutionized many aspects of underground mining. The units are used in all types of underground blasting operations. Some operations, due to the complexity an

    Jan 1, 1994

  • SME
    Handling Infiltration Into Underground Structures

    By Edward D. Graf

    Once the heavy work of mining, supporting and completing an underground structure is finished, there is frequently the problem of handling unwanted water infiltration into the opening. Methods of cont

    Jan 1, 1987

  • CIM
    Is Your Management Control Loop Functioning

    By John D. Campbell

    "IS YOUR MANAGEMENT CONTROLLOOP FUNCTIONINGMineral processors make use of hundreds of control circuits in their mills, process plants, smelters and refineries, to optimize throughput and recovery and

    Jan 1, 1985

  • NIOSH
    MLA 45-83 - Mineral Investigation Of The Hauser Rare II Area (No. 5021), San Diego County, California ? Summary

    By Thomas J. Peters

    The U.S. Bureau of Mines and the U.S. Geological Survey are responsible for the evaluation of the mineral resources and potential of further planning areas included in the U.S. Forest Service Roadless

    Jan 1, 1983

  • NIOSH
    OFR-9(2)-79 Drilling And Casing A 96-Inch ID By 2371 Foot Deep Shaft In Oil Shale - Volume II

    By James Gibbs

    In order to provide an initial approach to the deposits of oil shale, nahcolite, and dawsonite in the central area or the Piceance Creek Basin in northwestern Colorado, the U.S.B.M. and associated con

    Jan 1, 1978

  • NIOSH
    OFR-124(2)-81 Longwall Subsidence Case History Number 2 - Northern Appalachian Coal Region

    By Larry R. Powell

    As part of the Bureau of Mines effort to establish a comprehensive subsidence data base for subsidence technology development, subsidence and related data are being compiled for various mining, geolog

    Jan 1, 1981

  • SME
    The DC WASA Anacostia River CSO Control Tunnel Project

    By David C. Girard, Larry Williamson, Leonard R. Benson, Ronald E. Bizzarri

    On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and floo

    Jan 1, 2007