    OFR-67-77 Automatic Remote Control Coupler For Mine Cars

    By Dick T. Atkinson

    This report describes the Foster-Miller program that designed, developed, built and tested an automatic, remote control mine car coupler. This new coupler gives the motorman the capability to sele

    Jan 1, 1976

  • SAIMM
    Behaviour of large-span rock tunnels and caverns under favourable horizontal stress conditions

    By X. H. Zhang, J. G. Cai

    This paper discusses the behaviour of large-span tunnels and caverns in hard rock in a major underground storage project. In-situ stresses were measured using hydraulic fracturing during site investig

    Jan 1, 2003

  • AUSIMM
    The Selective Flotation of Xenotime from Heavy Minerals

    By H Hutchinson

    Froth flotation is applied to mineral sand concentrates in order to produce commercially viable xenotime concentrates. Experiments indicate that a xenotime product containing 38% Y2O3 at 47% recovery

    Jan 1, 1990

  • SME
    Canadian Experience in Open Pit Mining

    By R. K. Singhal

    Canada is a world class producer and exporter of minerals and mineral products. Today's highly mechanized Canadian open pits use state-of-the-art equipment and support technology. They are taking

    Jan 1, 1995

  • SAIMM
    Blast Furnace Control Using Slag Viscosities And Liquidus Temperatures With Phase Equilibria Calculations

    By J. Muller

    Keywords: Pyrometallurgy, blast furnace, slag viscosity, slag liquidus temperature, phase equilibria The viscosity of molten slag in blast furnace operations is an important process variable, infl

    Jan 1, 2011

  • AUSIMM
    Mine Site Environmental Management and Sustainable Post-Mining Land Use in New South Wales, Australia

    The Department of Mineral Resources has a statutory responsibility for mine site environmental management and control in New South Wales. The Department is focusing on an environmental management syst

    Jan 1, 2002

  • NIOSH
    OFR-122(4)-80 Alumina Process Feasibility Study And Preliminary Plot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume IV - Appendix B - General Specification - Section 1 - Building Description

    1.0 Control House (DWG. NO. 56-401-G) - 1.1 Physical Description The Control House is a single story, 2728 square foot building with an adjacent transformer yard. A four foot overhang provides shad

    Jan 1, 1979

  • AIME
    Further Discussion on A Feasibility Study of an In Situ Retorting Process for Oil Shale

    By M. ROWE, H. E. Gilliland, L. BARNES

    The authors of this paper are to be commended for a clear exposition of a timely subject. However, some important conclusions, in addition to those presented in the paper, can be drawn from the result

    Jan 1, 1969

  • CIM
    Concepts for Remote Mineral Projects

    By L. J. Vincze

    The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a

    Jan 1, 1980

  • NIOSH
    OFR-123(2)-81 Finite Element Analysis Applied To Resin And Mechanical Roof Bolting Systems For Strata Bound Deposits - Volume II - Appendix B - Description of Input Data for Computer Program SAP-S

    By J. C. Gerdeen

    SAP-S information on the following element types are included in this appendix: Type 1. Three-Dimensional Truss and Bolt Element Type 4. Two-Dimensional Finite Elements Type 8. Variable-Numb

    Jan 1, 1976

  • CIM
    Economic Optimisation of Pb-Zn Concentrates By Regrinding and Cyanidation of Silver from Zinc Concentrate

    By Carlos Avalos Casillas, Saul Ortiz Landeros

    The current work shows metallurgical results obtained at the Centro de Investigación y Desarrollo Tecnológico (Peñoles CIDT), as a continuation of the work first published in February 2012. With the a

    Jan 1, 2014

  • NIOSH
    OFR-57-81 Dust Collector On Longwall Shearer

    By Dennis J. Grigal

    The goal of the program is to develop a dust collector system mounted on a ranging drum or arm shearer which will: 1) reduce the respirable dust level of the shearer operator by at least 75 percent; 2

    Jan 1, 1980

  • DFI
    Driven Pile Cost Comparison For Two Large Wisconsin Dot Bridge Projects

    By Van E. Komurka

    This paper presents a cost comparison of the driven pile foundations for two large Wisconsin Department of Transportation (?WisDOT?) projects in Milwaukee, Wisconsin: the Marquette Interchange South L

    Jan 1, 2009

  • NIOSH
    OFR-41-80 Underground Vibrations From Surface Blasting At Jenny Mine, Kentucky

    By Dennis E. Jensen

    Field studies were performed during blasting operations for strip coal mining above the room and pillar workings at Jenny mine in eastern Kentucky. The study is part of the Bureau of Mines program to

    Jan 1, 1979

  • SME
    Experimental Protocol Enabling The Use Of X-Ray Photoelectron Spectroscopy In Concentrators. Case Study: Regrinding Stage

    By G. Montes-Atenas

    Throughout the years, research studies have reached a consensus in acknowledging the relevancy of surface chemistry phenomena on minerals separation and metals extraction. Many techniques, and notably

    Feb 27, 2013

  • SME
    Numerical Parametric Study of Floor Heave in Gate Roads Caused by Longwall-Induced Abutment Loading

    Floor heave events in underground mining often happen suddenly and cause risk to workers and equipment. Reducing the risk of floor heave must be addressed in mining layout design. To improve that desi

    Jan 7, 2020

  • DFI
    Computation Of The Load/Settlement Behaviour Of HP-Bearing Piles - 1. Introduction

    By E. E. De Beer

    This paper describes a method for the determination of the settlement of an individual H-bearing pile, based on the results of CPT-tests. As implied by the nature of the problem, no analysis perform

    Jan 1, 1987

  • SME
    Technology News – Automated-Plow Longwall Ordered for Chinese Coal Mine

    German manufacturer DBT signed a contract to supply a sixth automated-plow long-wall system to Shenyang Coal in Liaoning province in northeastern China. This most recent order occurred just weeks aft

    Jan 1, 2004

  • SAIMM
    Method statement for Excavation of Powerhouse Cavern Considering Mudstone Layers in Masjed Soleiman Dam

    By M. Shahabi, M. Kashfi

    This paper briefly describes the excavation procedure of a powerhouse, comprising of its incremental excavation, reinforcement measures, and the installed monitoring system. During the first phase of

    Jan 1, 2003

  • SME
    Looking Back at the Metal Mines of Cornwall

    By Thomas A. Simpson

    Traveling through the moors and valleys of Cornwall, England, one is reminded of the extensive mining activities of the past. Abandoned shafts, remains of granite block wheel houses and engine houses,

    Jan 9, 1981