Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Commissioning of the Barrytown Ilmenite Pilot PlantBy T Wootton
The Barrytown ilmenite pilot plant was commissioned in two stages using Westport Titanium Project heavy mineral concentrate. The wet concentrator was commissioned on the 17 December 1989 and produced
Jan 1, 1990
-
PART IV - Communications - Discussion of “Anisotropy of Grain Boundary Mobility in Zone-Refined Aluminum Crystals”By N. A. Gjostein
From their study of the anisotropy of grain boundary mobility in aluminum, the authors conclude that tilt boundaries have a higher mobility than twist boundaries because the atomic misfit at the pure-
Jan 1, 1968
-
Oxidation at the Orieco Copper Mine, Eastern TasmaniaAt the Orieco mine quartz veins carrying sulphides were localized in parts of an extensive fault zone in the Mathinna Beds during late Middle Palaeozoic mineralization.These deposits were subsequently
Jan 1, 1970
-
IC 6121 Method and Cost of Mining Zinc in OklahomaBy Wm. F. Netzeband
"The mode of ore occurrence and the methods and costs of mining at one of the zinc-lead mines in the Tri-State zinc and lead district, Oklahoma, are presented in this paper for the information of mine
May 1, 1929
-
The Recovery of Rare Earths, Uranium and Pyrite from Pele Mountain’s Proposed Eco Ridge Mine ProjectBy Roger Payne, John R. Goode, Feng Gao, James Brown
The Eco Ridge deposit is located in the Elliot Lake mining camp in Northern Ontario, Canada. Between 1955 and 1996, the area produced more than 138,000 t (300 million pounds) of U3O8 and very signific
Jan 1, 2014
-
Switched Reluctance Drive: The Ideal Feeder DriveBy Svato Prochazka
Content: ? commonly used drive systems ? drive system efficiency ? introduction to SR technology ? SR drive system advantages Commonly Used Feeder Drives Technologies ? VFD + induction motor ?
May 1, 2010
-
Computer Modelling of Cast BlastingBy G K. Jorkenson
Blast designs to cast a percentage of overlying waste rock off coal seams differ greatly from conventional blast designs for surface coal mines. Today, blasting engineers can benefit from computer si
Jan 1, 1989
-
A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place PilesBy Sridhar Krishnan
This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p
Jan 1, 2006
-
Researches On Fire-Damp (54946a2b-dcae-4862-bb12-7f3c7ddcb263)By Enrique Hauser
Discussion of the paper of ENRIQUE HAUSER, presented at the New York meeting, February, 1916, and printed in Bulletin No. 110, February, 1916, pp. 521 to 534. GEORGE A. BURRELL, Pittsburgh, Pa. Mr.
Jan 5, 1916
-
Reply To F. Essrich ?Quantitative Rockburst Hazard Assessment At Elandsrand Gold Mine? - In The Journal Of SAIMM, Vol. 97. No. 7. Pp. 319?324By J. F. Curtis
In the synopsis, the author concludes that ?high levels of seismicity do not coincide with high rockburst rates?. Implicit to an appreciation of this statement is the necessity of a common understand
Jan 1, 1999
-
RI 8771 A Water Elutriator System for Recovering Nonmagnetic Metals From Automobile Shredder RejectsBy D. K. Steele
An 18-in-diam column water elutriator was designed, tested, and operated by the Bureau of Mines for recovering nonferrous mixed metals from automobile shredder rejects. The waver elutriator separated
Jan 1, 1983
-
Near-Infrared Spectroscopy (NIRS) Sorting in the Upgrading and Processing of Skorpion Non-Sulfide Zinc OreNear-Infrared Spectroscopy (NIRS) Sorting in the Upgrading and Processing of Skorpion Non-Sulfide Zinc Ore In 2008 Anglo American sponsored a research project at RWTH Aachen University to assess the
Sep 13, 2010
-
In Situ Measurement Of Rock Stress With Hydraulic Borehole Pressure Cells ? ObjectiveDevelop a new technique of in situ rock stress measurement which can be used when and where the conventional methods, such as the overcoring stress relief methods and the hydrofracturing method, canno
Jan 1, 1988
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field WorkBy Darrell L. Beddard
Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai
Jan 1, 1996
-
RI 7624 A Thousand-Ton Capacity Stiff Testing MachineBy F. G. Horino
This report presents the theory and design of a stiff loading machine used by the Bureau of Mines. The machine incorporates three high-strength steel columns as the restraining member in parallel with
Jan 1, 1972
-
Phasing Out Reverberatory Furnace Operations At KCM NkanaBy M. Natarajan, C. J. Cutler, E. Mponda
Keywords: Pyrometallurgy, furnace, KCM Nkana, Zambia The Nkana smelter was initially commissioned in 1931, with two reverberatory furnaces, two Peirce-Smith converters, and blister copper casting
Jan 1, 2006
-
A Life Cycle Impact Assessment Indicator For Ash Management In Coal-Based Power GenerationThe coal-based power generation industry faces increased pressure from all sectors to improve its environmental performance. This is due to increased awareness of and concerns regarding greenhouse-and
Jan 1, 2002
-
The business benefits of an advanced mineral sands control applicationBy R. Hope, C. van Heerden
In any process or organization inefficiencies are costly. In times of abundance this reality often does not receive much attention. During such times the focus is rather on increasing capacity to incr
Jan 1, 2003
-
Mould Powder Selection For Thin Slab CastingBy J. A. Kromhout, J. Trouw, A. A. Kamperman, M. Kick
Mould powders play an important role in the stability of the continuous casting process. The main functions of mould powders are to provide sufficient lubrication and to control the horizontal heat tr
Jan 1, 2004
-
CPT - Guided Installation Of Pressure-Grouted Displacement PilesBy Mark M. Petersen
As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven
Jan 1, 2002