Expert System Technology at the Polaris MineBy G. A. Kosick, C. A. Harris
"Metallurgy at the Polaris Mine is approaching an impasse, with lead and zinc concentrate grades and recoveries approaching their theoretical maximums. In an effort to increase productivity, plant thr
Jan 1, 1988
-
Creep Along Weak Planes In Roof And How It Affects StabilityBy M. K. Larson, R. G. Wade
Researchers at the National Institute for Occupational Safety and Health (NIOSH) are studying the time-dependent response of rock stressed along weakness planes. The objective is to improve mine safe
Jan 1, 2000
-
Pyrite Bioleaching and Slag Neutralisation - Two Treatments in a Single Process for Recovering Valuable Metals from Both MaterialsPyrite Bioleaching and Slag Neutralisation - Two Treatments in a Single Process for Recovering Valuable Metals from Both Materials Very often the production of copper sulfide concentrate yields pyrit
Sep 13, 2010
-
A methodology for the statistical and spatial assessment of soil contamination around mining districtsBy S Durucan, A Korre
The application of simple methods of statistical analysis, coupled with geostatistical analysis and geographic information systems, can only summarise and give an outline of the spatial distribution o
Jun 21, 1905
-
RI 6015 Fire And Explosion In A Blasting Agent Mix Building, Norton, Va. ? IntroductionBy Robert W. Van Dolah
On December 27, 1961, a fire and explosion destroyed the blasting agent mixing plant and an attached storage barn of the Whitaker-Atlas Supply Co., near Norton, Wise County, Va. Five residences, an of
Jan 1, 1962
-
The Importance of Water Utilization for Maximizing Grinding Circuit Classification System EfficiencyBy Robert E. McIvor
"The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill’s grinding performance. The factors which affect ci
Jan 1, 2009
-
El Abra - Two Years LaterBy Rainer Kahrger
This paper is a follow-up to the paper presented at the SME meeting in April of 1996. Since then, the El Abra facility has been started up, 9 months ahead of schedule, and has processed about 45 milli
Jan 1, 1998
-
RI 3547 Progress Reports - Metallurgical Division - 42. Annual Report Of The Metallurgical Division, Fiscal Year 1940 ? Functions Of The Metallurgical DivisionBy R. S. Dean
In general, the Division conducts investigations relating to the treatment of ores and metallurgical products from the condition to which they are mined to the refined metal. At the object of conservi
Jan 1, 1941
-
Investigation of the Classification Operation in a Coal Pulverising Vertical Spindle MillInvestigation of the Classification Operation in a Coal Pulverising Vertical Spindle Mill Coal pulverisation in power plants is a major electrical energy consumer. In 2006 more than 41 per cent of wo
Sep 13, 2010
-
A Roast-Leach Method for Recovering Valuable Metals from Nickel Refinery Copper Sulphide PrecipitatesGold, silver and palladium may be separated from the other base metals and sulphur contained in copper sulphide precipitates derived from the Sherritt-Gordon nickel process using a process involving a
Jan 1, 1982
-
Enhancing Flotation Performance With Process Control at Century MineBy S Smit, P J. J Strobo
ZINIFEX Century Mine is a zinc, lead and silver concentrate producer. Flotation is the primary method of minerals separation in this circuit. The flotation circuit is quite large with 79 flotation cel
Jan 1, 2004
-
Hierarchical Systems Analysis Of Potential Environmental Impacts Of Aggregate Mining ActivitiesBy K. E. Kolm, W. H. Langer
Developing natural aggregate resources (sand, gravel, and stone) creates environmental impacts. A systems analysis method has been designed to characterize the components of the environmental system,
Jan 1, 2001
-
Construction And Design Of Drilled Shafts In Hard Pinnacle LimestonesBy Dan A. Brown
The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos
Jan 1, 1991
-
Survey of noise in coal preparation plantsBy JeffreyS. Vipperman, Daniel R. Babich, EricR. Bauer
In response to the continuing problem of noise induced hearing loss NIHL among mine workers, the National Institute for Occupational Safety and Health NIOSH has conducted numerous noise surveys in
-
Large Diameter Shafts - Youghiogheny Reservoir BridgeBy Paul J. Lewis
Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt
Jan 1, 2005
-
Petrographic Evidence Relating to Movement on the Thackaringa-Pinnacles Fault, Broken Hill DistrictAlthough the pattern of metamorphic zones south of the Thackaringa-Pinnacles Fault is much obscured by polymetamorphism, displacement of the orthopyroxene isograd by the fault agrees with the displace
Jan 1, 1965
-
A Historic Capitol And A Deep ExcavationBy Richard F. Sliwoski
The Virginia State Capitol was designed by Thomas Jefferson and constructed in 1785. The Capitol is of great historic and architectural significance to not only the Commonwealth of Virginia but to the
Jan 1, 2006
-
Air overpressure Prediction Equation for Construction BlastingBy Calvin Konya, Anthony Konya
State and Federal construction specifications require the Blasting Contractor to prepare a Master Blasting Plan which is reviewed by the Owner’s Representative. The Master Blasting Plan requires the
Jan 1, 2015
-
RI 7384 Refinement Of Hematite Crystal StructureBy R. L. Blake
The crystal structure of hematite, a-Fe203, has been refined as part of a continuing study of the behavior of phases in the Fe-O system during reduction and oxidation. Three-dimensional diffraction in
Jan 1, 1970
-
Utilization of the Hilti OneStep Rock Anchor at Twentymile Coal Company to Reduce the Overall Amount of Time for Face Stabilization During Longwall RecoveryBy Bill Stormes
This paper will discuss implementation of the Hilti OneStep rock anchor technology to improve face bolting operations during the May 2008 longwall move; increase rock anchor installation capacity; and
Jan 1, 2008