Search Documents

  • IOM3
    Mathematical model of the dense-medium drum

    By P. J. Baguley

    The model has been developed on the basis of the observation that the partitioning behaviour of a particle is related to its calculated terminal velocity. It utilises a theoretical calculation of the

    Jun 18, 1905

  • CIM
    Model-based control of column flotation: Toward industrial application and real-time optimization

    By André Desbiens, Jocelyn Bouchard, René del Villar

    "The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la

    Jan 1, 2003

  • DFI
    Design Methods For Earthquake-Induced Pile Bending

    By George Mylonakis

    The curvatures and subsequent bending imposed to piles by the surrounding soil during the passage of strong seismic waves is studied. This type of bending develops even in the absence of a superstruct

    Jan 1, 2002

  • CIM
    Gold Milling at Lac Shortt

    By P. Dyas, H. Zouitt, D. M. Smith

    "Falconbridge Copper's Lac Shortt gold mine is located in northern Quebec approximately 300 km northeast of Val D'Or and 100 km west of Chibougamau (Pig. 1). Engineering for the mill commenced in earl

    Jan 1, 1987

  • SAIMM
    Ground behavior investigation during roof fall in a roadway

    By V. V. Nazimko, A. I. Hohotva, S. N. Alexandrov, V. P. Sazhnev, V. S. Zaharov

    Ground behaviour in the vicinity of a roadway has been investigated using a physical model and in situ tests during a roof fall. It was discovered that behaviour of the ground is governed by irreversi

    Jan 1, 2003

  • CIM
    The Installation and Operation of Heap Leaching Test Facilities

    By J. Maheu

    Heap leaching is an old technique for the recovery of copper, but a fairly new technique for the recovery of gold.The paper outlines the equipment required for the establishment of heap leaching test

    Jan 1, 1982

  • SME-ICGCM
    Load Determination For Long Cable Bolt Support Using Computer Aided Bolt Load Estimation (CABLE) Program

    In this paper a numerical formulation is presented for determination of the axial load along a cable bolt for a prescribed distribution of rock mass displacement. Results using the program CABLE indic

    Jan 1, 1996

  • SAIMM
    Comparison Of Globoid And Cylindrical Shearer Drums? Loading Performance

    By M. Ayhan

    Drums of a modern longwall shearer are manufactured to include various constructional features conveying extracted material onto the face conveyor as efficiently as possible. Designing a drum with a c

    Jan 1, 2006

  • NIOSH
    OFR-51-82 Technology For Environmental Noise Control In Surface Mines

    By Michael A. Staiano

    The objective of this study was to determine the magnitude and sources of environmental noise from mining operations near populated areas, to de-scribe monitoring techniques, and to identify applicabl

    Jan 1, 1981

  • AIME
    Reservoir Engineering – General - Aquifer Behavior with Injection

    By E. J. Bonet, P. B. Crawford

    It is fairly common practice to reinject water into the aquifer near the oil-water interface in water-drive reservoirs. There have been many studies of aquifer behavior without reinjection,l-5 but

    Jan 1, 1970

  • AUSIMM
    Polar Zoning in Geochemical Ore Systems Based on Examples From the Pacific Rim Deposit

    By V L. Los, G J. Abramson

    The paper examines three types of polar zoning of ore-forming and associated elements that can be detected from geochemical data. Polar zoning is mapped in the form of geochemical ore systems of vario

    Jan 1, 1999

  • AUSIMM
    Investigation of Pressure Drop in Packed Beds with Melting

    Pressure drops were measured in a column packed with glass spheres and wax particles, both in random and preferential distributions. Variables investigated included wax content, gas flow rates, and te

    Jan 1, 1970

  • AUSIMM
    Grinding ù The Primary Conditioner

    By P Steinier

    Most operations, when considering their comminution circuit, are primarily concerned with achieving the desired particle size distribution to obtain adequate liberation for the separation process, at

    Jan 1, 2004

  • NIOSH
    IC 8560 The Impact Of Blasting Agents And Slurries On Explosives Technology

    By Richard A. Dick

    This Bureau of Mines report describes the evolution of modern-day blasting agent and slurry products and the state of the art of the usage of these products as it exists today. The steadily increasing

    Jan 1, 1972

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • AIME
    Design Of Permanent Block Stopping To Resist Strata Convergence

    By R. E. Ray, J. W. Stevenson, J. A. Berry

    Conventional concrete block plastered with a cementitious coating is the most common material used in the construction of permanent stoppings to direct airflow in underground mines in the US. All mine

    Jan 1, 1986

  • AUSIMM
    A Non-Linear Programming Model for Open Pit Mine Equipment Selection

    In mining industries, materials loading and handling costs represent a significant component of the total (capital and operation) costs. A variety of methods have been applied in surface mine equipmen

    Dec 6, 2010

  • CIM
    Gold Passivation: Some Fundamental Issues to Highlight

    By A. Azizi, P. Blatter, A. Bouajila

    "Due to the high reactivity of sulfide minerals in alkaline cyanide solutions, some parasitic reactions inflict a heavy gold surface passivation and excess cyanide consumption resulting in a dramatic

    Jan 1, 2012

  • SME
    Mineralogic And Geochemical Characteristics Of Uranium And Vanadium Distribution At A Proposed Uranium In-Situ Recovery Site, South Dakota

    By S. F. Diehl

    Drill cores from uranium roll-front deposits, hosted in lower Cretaceous strata, were examined from the proposed Dewey Burdock in-situ uranium recovery site in the northern part of the Edgemont uraniu

    Feb 27, 2013

  • DFI
    CSM Cutter Soil Mixing - A New Technique For The Construction Of Subterranean Walls Initial Experiences Gained On Completed Projects

    By E. Stoetzer

    In all known deep mixing processes the existing soil is mixed with self hardening slurry by mixing tools that rotate about a vertical axis (augers, mixing paddles). Wall panels are constructed using s

    Jan 1, 2006