Installation Of Augered Cast-In-Place Piles - Equipment? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2003
-
Size Separation Pretreatment and Alumina Recovery from Bayer Red MudSize Separation Pretreatment and Alumina Recovery from Bayer Red Mud
Sep 13, 2010
-
Single Level Extraction At KoffiefonteinBy R. L. Pienaar
Paper written on project work carried out in partial fulfilment of B Eng (Min. Eng.) degree A study was conducted to investigated and compare the feasibility of two single level extraction layouts
Jan 1, 2006
-
Pilot Plant Testing for Column Flotation Circuit DesignBy G. A. Kosick, G. S. Dobby, O. Matwijenko
"A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl
Jan 1, 1990
-
Geochemistry in Mineral ExplorationOrebodies are defined in economic terms in that they must satisfy conditions determined by costs of mining, extraction and marketing before being so described. Despite this they have an essential chem
Jan 1, 1960
-
Continuous Countercurrent Ion Exchange (CCIX) Used In Hydrometallurgy - The Influence of IronBy Filip Rochette, Yvan De Busscher
Extraction of minerals can be achieved by a variety of technologies; one of them is ion exchange. There are several ion exchange configurations and mechanical set-ups available, but only one technolog
Jan 1, 2016
-
RI 7290 Metallization Of Iron Ores With Solid ReductantsBy M. M. Fine
Research on the solid-fuel reduction of Knob Lake iron or was conducted to upgrade lean and high-grade ores and recover metallized products suitable for ironmaking or steelmaking. The program included
Jan 1, 1969
-
Use of Menard Pressuremeter Test Results to Predict a Bearing Capacity and Settlement of Bored PilesBy Ramdane Bahar
"Abstract The design foundations can be performed using Menard pressuremeter rules that require a limit pressure and a pressuremeter modulus. In recent years, another trend of interpretation of this t
Jan 1, 2014
-
A Quantitative Chemical Model of the Broken Hill Lead-Zinc DepositA quantitative chemical model of the rocks of the Broken Hill lode environment is presented to illustrate a stratiform orebody in a meaningful form to scientists interested in environmental control on
Jan 1, 1968
-
External Shock Migration for Buried StructuresBy Henry S. McDevitt
External Shock Mitigation (ESM) is being studied as a possible means of retrofitting existing buried structures to provide additional protection from ground shock. As part of this study, two tests wer
Jan 1, 1997
-
Ilmenite Smelting At Ticor SA (c5ed7b50-45b1-4be9-8346-a5752e8bd56e)By H. Kotzé
Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and mineral separation plant were approved in 2000. The smelter, just outsid
Jan 1, 2006
-
OFR-162(2)-83 Mining In Low Coal - Volume II: AnthropometryBy M. M. Ayoub
This volume is the second of three volumes comprising the final report of the research project "Biomechanics of Low Coal." It covers only the anthropometric study of low coal miners. Volume I summariz
Jan 1, 1982
-
Classification of Chock Shields Behaviour in an Indian Longwall Mine in Real TimeBy Srinivasulu Tadisetty
The productivity and safety of Indian longwall operations are insignificant because of complex geomechanical conditions. Therefore, the continuous monitoring and forecasting of abnormalities is impera
Jan 1, 2006
-
Solutions to Prevent Materials-Handling Injuries in Underground Coal MinesBy Brian P. Stapleton, Bill M. Stewart, Joel R. Warneke, Curtis C. Clark
Of the 28 accident/injury classifications listed by the Mine Safety and Health Administration, handling materials is second only to roof falls in terms of generating the highest number of reportable a
-
Actual vs. Baseline Tracking During TBM Tunneling In Highly Variable Glacial GeologyBy Ulf G. Gwildis
The Bright water Conveyance System includes 21 km of tunnels mined by two earth pressure balance Tunnel Boring Machines (TBMs) and two slurry TBMs. The probabilistic baseline approach defined in the G
-
Optimisation of Circuits for Pressure Leaching of Sulfide Ores and ConcentratesBy Fadeela Saloojee, Frank K. Crundwell
"Pressure leaching is an option for copper recovery from chalcopyrite. Leaching takes place at high temperatures and pressures in the presence of an oxidising agent. This work shows how the performanc
Jan 1, 2015
-
Comparative Tests Of Hammer Drill BitsBy Carroll Forbes
INTRODUCTION MANY different shapes of drill bits are in use with hammer drills, but little definite information is available whereby to judge which one of these shapes is the best. The following inv
Jan 8, 1917
-
RI 3452 Studies Of Roof Movement In Coal Mines - 2. Crucible Mine Of The Crucible Fuel Co. ? IntroductionBy E. R. Maize
This report is the second of a series on roof movement in coal mines. The first (R. I. 3355)4/ dealt with convergence of roof and floor and movement of the surface accompanying and following extractio
Jan 1, 1939
-
Advances in grid-based numerical modeling techniques for improving gas management in coal minesEffective gas management in coal mines, as well as proper ventilation design, is very important for maintaining the safety of underground coal miners. Advances in numerical modeling techniques have en
Jan 1, 2009
-
RI 5497 Solution Techniques In Fluorescent X-Ray Spectrography ? SummaryBy William J. Campbell
This report describes a Bureau of Mines study undertaken to determine the applications and limitations of solution techniques as a general method of fluorescent X-ray spectrographic analysis. Syst
Jan 1, 1959