Search Documents

  • ABM
    Implantação Do Sistema De Gestão Da Confiabilidade - Fbox

    By Breno Carvalho de Oliveira

    A prática da manutenção evita a ocorrência de falhas e reduz significativamente os ganhos na produtividade e qualidade do produto. Devido a sua importância, empresas de logística e operações ferroviár

    Oct 30, 2017

  • AUSIMM
    Optical and SEM-Based Microscopy Integration for Optimisation of Geometallurgical Modelling and Ore Deposit Characterisation

    By R Hartner

    Digital optical microscopy (DOM) and automated SEM-based (ASEM) mineralogy systems (MLA, QEMSCAN) have experienced significant developments within the last decade. However these developments have been

    Sep 5, 2011

  • ABM
    Melhorias Na Operação De Um Distribuidor De Lingotamento Contínuo Com O Auxílio De Simulações Numéricas

    By Marcos Pereira Manso, Carlos Alberto Rodrigues Lares, Sandro Luiz Zahner, Alexandre Dolabella Resende, Marcelo Martins Ferreira, Rodrigo Garcia Ribeiro

    O Distribuidor é um equipamento fundamental no processo de Lingotamento Contínuo por ter como função, dentre outras, assegurar a continuidade do processo durante a troca de panela, bem como manter o a

    Oct 1, 2019

  • SME
    Slurry Walls, Tiebacks, and Tiedowns: Maximizing the Efficiency of Underground Station Space

    By James Parkes

    "The proposed Baltimore Red Line light rail system includes a 3.4 mile downtown tunnel (DTT) with five underground stations. The design of the underground stations involved overcoming several challeng

    Jan 1, 2016

  • DFI
    Jet Grouting at the West Toronto Diamond Grade Separation Project

    By Jim Bruce, Naresh Gurpersaud

    "The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co

    Jan 1, 2017

  • SME
    Combined Ground Freezing Application for the Excavation of Connection Tunnels for Centrum Nauki Kopernik Station—Warsaw Underground Line II

    By Achille Balossi Restelli, Elena Rovetto, Andrea Pettinaroli

    "The Station “C13” of Warsaw Underground Line II, with tunnel crown 10m below the water table, required the excavation of three connection tunnels, underpassing a six-lane in service road tunnel, work

    Jan 1, 2016

  • CIM
    The Sinking of Nutrien’s Scissors Creek Service Shaft

    By Kevin J. Melong

    "Redpath Canada Limited and joint venture partner Thyssen Mining and Construction Canada have recently completed the sinking of the Scissors Creek service in Saskatchewan through its joint owned compa

    Jan 1, 2019

  • DFI
    Introduction (10b9df94-8559-46e8-b74a-5e5ae2f990b0)

    "The development of non-destructive testing (NDT) methods for deep foundations occurred in several parts of the world, gradually coming together into the present state of the art. The compilation of t

    Jan 1, 2004

  • CIM
    Analysis on Material and Energy Balances of Ironmaking Systems under Novel Operating Concditions of Blast Furnace

    By Y. Kashiwaya, J. Yagi, P. R. Austin

    The problems of global environment and resources have become important issues in recent years, and the iron and steelmaking industry is requested to decrease energy consumption and carbon dioxide emis

    Jan 1, 2015

  • SME
    Comparison Between Sprayed and Cast in Situ Concrete Secondary Linings at Bond Street and Farringdon Stations

    By Eleanor Kentish, Nathan Bond, Edward Batty, Simon Webber, Alan Skarda

    "Crossrail is Europe’s largest construction project — a new 100km rail route running through central London. A joint venture of BAM, Ferrovial and Kier (BFK) has constructed the tunnels and escalator

    Jan 1, 2016

  • CIM
    Aggregate Resources of Southern Ontario

    By M. A. Vos

    "Aggregates are the low-cost mineral raw material of building construction. Large volumes of aggregate are consumed each year. The availability of aggregates in southern Ontario is discussed in the co

    Jan 1, 1972

  • AUSIMM
    Review of Static and Seismic Stability of a Cross-valley Sand Tailings Embankment in a High-rainfall, High-seismicity Setting

    By B P. Wrench, M J. Gowan, P J. Chapman

    Embankment dams constructed mainly of sand or non-plastic fine soils are susceptible to liquefaction, particularly in high-rainfall, high-seismicity environments where there is sufficient water to sat

    Jul 27, 2015

  • CIM
    Underground Operations at Texada

    By The Satff

    "TEXADA Island is situated in the Strait of Georgia, about 100 miles northwest of Vancouver. The property of Texada Mines Ltd. lies on the southwest coast of the northern end of the Island. A part of

    Jan 1, 1967

  • IIMP
    Oro, ccori en quechua

    By Jorge Olivari Ortega

    "El presente texto describe el origen etimológico de la palabra oro, propiedades e historia. El término oro deriva del latín aurum, cuya raíz refiere al color, gelb al color y ccori al origen. Este me

    Sep 1, 2015

  • ISEE
    How Genetic Algorithms and Cloud Processing Optimise

    By Mark Roberts

    Automation, data analytics and optimisation are key trends in the mining industry. Doing more, and better, while expending less resources targets KPIs around efficiency and productivity. With the expl

    Feb 6, 2023

  • SME
    Crossing an Environmentally Sensitive Shore Area— Micro-Tunneling in the Australian Outback - RETC2021

    By Taner Aydogmus

    The A$29 billion Chevron-operated Wheatstone Project is one of Australia’s largest resource projects. Located at Ashburton North, 12 kilometers west of Onslow in Western Australia, the project will co

    Jun 13, 2021

  • AUSIMM
    Characterisation and calculation method of friction resistance based on fractal theory of roadway rough surface

    By B Wu, C Zhao, B Lei

    At present, the friction factor is calculated by measuring pressure drop and airway configurations. However, the workload of on-site measurement is heavy, and the measurement results are easily distur

    Oct 12, 2022

  • AUSIMM
    Integrated process modelling for the Kalgoorlie Nickel Smelter

    By G Sartor, A Rich, D Grimsey, R Forzatti, M White

    An in-depth process model was developed for the pyrometallurgical, off-gas systems and water balance of the Kalgoorlie Nickel Smelter. This model was used to assess plant capacity with changing concen

    Aug 21, 2024

  • AUSIMM
    Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysis

    By H Kurth

    Oyu Tolgoi copper and gold mine in the southern Mongolia holds mineral resources that make it one of the largest known copper and gold deposits in the world. The project is operating an open pit mine

    Mar 22, 2022

  • ABM
    A Nova Linha De Decapagem Da Usiminas

    By Ailton Lopes de Oliveira

    A Usiminas, como empresa de ponta na produção de aços planos, visando manter e ampliar a sua liderança na produção e comercialização destes produtos, investiu uma elevada soma na modernização de sua l

    Jul 30, 2018