  • CIM
    The Importance of Water Utilization for Maximizing Grinding Circuit Classification System Efficiency

    By Robert E. McIvor

    "The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill’s grinding performance. The factors which affect ci

    Jan 1, 2009

  • DFI
    Construction And Design Of Drilled Shafts In Hard Pinnacle Limestones

    By Dan A. Brown

    The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos

    Jan 1, 1991

  • SME
    El Abra - Two Years Later

    By Rainer Kahrger

    This paper is a follow-up to the paper presented at the SME meeting in April of 1996. Since then, the El Abra facility has been started up, 9 months ahead of schedule, and has processed about 45 milli

    Jan 1, 1998

  • AUSIMM
    A Roast-Leach Method for Recovering Valuable Metals from Nickel Refinery Copper Sulphide Precipitates

    Gold, silver and palladium may be separated from the other base metals and sulphur contained in copper sulphide precipitates derived from the Sherritt-Gordon nickel process using a process involving a

    Jan 1, 1982

  • AUSIMM
    Enhancing Flotation Performance With Process Control at Century Mine

    By S Smit, P J. J Strobo

    ZINIFEX Century Mine is a zinc, lead and silver concentrate producer. Flotation is the primary method of minerals separation in this circuit. The flotation circuit is quite large with 79 flotation cel

    Jan 1, 2004

  • DFI
    A Historic Capitol And A Deep Excavation

    By Richard F. Sliwoski

    The Virginia State Capitol was designed by Thomas Jefferson and constructed in 1785. The Capitol is of great historic and architectural significance to not only the Commonwealth of Virginia but to the

    Jan 1, 2006

  • SME
    Exploratory Shafts For The Nuclear Waste Repository In Basalt

    By Birger Schmidt

    INTRODUCTION Conceptual design of the first Exploratory Shaft (ES-I) for the Nuclear Waste Repository in Basalt (NWRB) began in July 1981; detailed design began in February 1982, and was largely co

    Jan 1, 1987

  • NIOSH
    OFR-151-81 Evaluation And Demonstration Of A New Post Disaster EM Communication Technique For Mines

    By M. P. Ristenbatt

    A new automated post-disaster signaling system, intended to use through-the-earth EM propagation, was demonstrated in the laboratory at an input SNR of -34 dB. The system presently available requires

    Jan 1, 1981

  • SME
    Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York City

    By Dean Workman

    Located in downtown New York City, this project necessitated an innovative conveyor design for successful muck removal. This paper will discuss the technical challenges and engineering solutions of th

    Jan 1, 2008

  • SAIMM
    Factors Affecting The Quality Of Tunnel Infrastructure At Premier Diamond Mine

    By M. S. Smith

    Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The condition of tunnels at Premier has deteriorated to such an extent that an objective viewpo

    Jan 1, 2004

  • ISEE
    Air overpressure Prediction Equation for Construction Blasting

    By Calvin Konya, Anthony Konya

    State and Federal construction specifications require the Blasting Contractor to prepare a Master Blasting Plan which is reviewed by the Owner’s Representative. The Master Blasting Plan requires the

    Jan 1, 2015

  • AUSIMM
    The Morphology and Evolution of Massive Sulfide Chimney Samples from the Southern East Pacific Rise

    By C E. J de Ronde, J L. Mauk

    Sulfide chimney samples collected during the 1998 - 1999 R/V Atlantis û DSV Alvin 3 - 30 research cruise have been examined and classified into four types, based on common characteristics. Chimney mor

    Jan 1, 2003

  • SME-ICGCM
    Utilization of the Hilti OneStep Rock Anchor at Twentymile Coal Company to Reduce the Overall Amount of Time for Face Stabilization During Longwall Recovery

    By Bill Stormes

    This paper will discuss implementation of the Hilti OneStep rock anchor technology to improve face bolting operations during the May 2008 longwall move; increase rock anchor installation capacity; and

    Jan 1, 2008

  • NIOSH
    RI 7596 Hydraulic Fracturing Of Wyoming Green River Oil Shale: Field Experiments, Phase I

    By H. E. Thomas

    [The Bureau of Mines has conducted a field hydraulic fracturing experiment to determine the preferential orientation of induced fractures in oil shale at a depth of about 400 feet in the Green River B

    Jan 1, 1972

  • NIOSH
    Survey of noise in coal preparation plants

    By JeffreyS. Vipperman, Daniel R. Babich, EricR. Bauer

    In response to the continuing problem of noise induced hearing loss NIHL among mine workers, the National Institute for Occupational Safety and Health NIOSH has conducted numerous noise surveys in

  • CIM
    Large Flotation Machine Development and Operation

    By M. Churchill, V. R. Degner

    "Over the past two decades, declining ore body grades, increased operating costs and increased construction costs have provided an incentive for the development of progressively larger flotation machi

    Jan 1, 1982

  • NIOSH
    RI 8131 Production of Blister Copper by Electric Furnace Smelting of Dead-Burned Copper Sulfide Concentrates

    By D. L. Paulson

    The Bureau of Mines is investigating pyrometallurgical and chemical methods for extracting copper from sulfide ores under conditions that provide for control of gaseous and solid emissions. Under this

    Jan 1, 1976

  • AIME
    PART XII – December 1967 – Communications - Application of a Solid Electrolytic Cell for Measuring Equilibrium P O2 over Liquid Metal-Oxygen Solutions

    By N. A. D. Parlee, M. M. A. El-Naggar, G. 8. Horsley

    The apparatus was of a modified Sieverts type1'2 with a reaction tube designed to function also as the cell component of an oxygen pressure gage. The reaction tube assembly is shown in Fig. 1

    Jan 1, 1968

  • AUSIMM
    Petrographic Evidence Relating to Movement on the Thackaringa-Pinnacles Fault, Broken Hill District

    Although the pattern of metamorphic zones south of the Thackaringa-Pinnacles Fault is much obscured by polymetamorphism, displacement of the orthopyroxene isograd by the fault agrees with the displace

    Jan 1, 1965

  • AUSIMM
    Rock Mass Classification is Only Part of the Answer to Assess Raise Boring

    By J Wallis

    The stability of a raise bore is often assessed using the rock mass classification system published by McCracken and Stacey as a modification of the Q system. Often the assessment is done using a spre