Search Documents

  • SME
    Cathodoluminescence (Cl) Microscopy Application To Refractories And Slags

    By R. E. Moore

    Refractories are unique ceramic materials, which are used in large quantities in steel making furnaces, metal smelting vessels, and glass melting tanks. They are required to possess high thermal shock

    Jan 1, 2001

  • SME
    Separation Chemistry In The Refining Of An Off-Grade Molybdenite Concentrate By Leaching With An Acid Mix

    By P. M. Prasad

    Off-grade molybdenite concentrates, mainly derived from secondary sources as by-products of the processing of copper, uranium and tungsten ores, do not satisfy the purity requirements (percent MoS2) f

    Jan 1, 2007

  • AUSIMM
    Personal Liability - Chartered Practising Status and Best Practice Defences for Pacrim Practitioners

    Whether you are an employee, contractor or consultant working in the mineral industry, there are pressures to deliver the best possible performance. Technical professionals are usually driven by an in

    Jan 1, 1995

  • ISEE
    How Electronics Initiation has Changed the Rules of Blast Design

    By Thierry Bernard

    For many years now electronic initiation has brought the time parameter to the centre of blast designs forever. Although this parameter existed before the era of electronic detonators, Blasting engine

    Jan 1, 2005

  • SAIMM
    System Ductility Of Long Fibre Reinforced Shotcrete

    By H. A. D. Kirsten

    Shotcrete has become a strategic component of support in underground mines. The ductility of reinforced shotcrete makes it a safe and economic means of surface support under adverse static and dynamic

    Jan 1, 1998

  • AUSIMM
    Improvements in Stoping Practice at the Great Boulder Proprietary Gold Mines Limited

    By Holly J

    The period following World War II has seen many changes in stoping techniques at The Great Boulder Gold Mine. The new methods resulted in improved unit production figures, and have given some relief f

    Jan 1, 1956

  • SAIMM
    Integrated Optimization Of Underground Mine Design And Scheduling

    By J. Little

    It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, comput

    Oct 1, 2013

  • SME-ICGCM
    The Next Generation of Cable Bolts for Improved Ground Support

    By Stephen C. Tadolini

    PC-Strand tendons, commonly referred to as cable bolts, have become a major rock reinforcement device for underground mining and civil applications. The most common configuration is a 1+6 strand, whic

    Jan 1, 2012

  • SAIMM
    The Ultimate Screener - Introduction

    By R. Dass

    Paper written on project work carried out in partial fulfilment of B. Sc Eng (Extractive Metallurgy) degree Screening is an industrial process that splits material at a specific cut size into one f

    Jan 1, 2004

  • AIME
    Minerals Beneficiation - Analysis of Data from Continuous Flotation Tests

    By C. C. Harris, A. Jowett, S. K. Ghosh

    An equation derived from first-order kinetics and accounting for return from froth to pulp has correlated continuous flotation data. The concentration of floatable material in the pulp can be altered

    Jan 1, 1963

  • AUSIMM
    DRI - An Alternative Amongst Many

    A laboratory size solvent extraction apparatus has been constructed, which incorp- orates three stages of countercurrent extraction, followed by two stages of counter- current stripping. The model u

    Jan 1, 1999

  • SME-ICGCM
    Ground Control Design Challenges At The El Boleo Copper Project (fe854eab-fde5-445c-8a43-3f4fce2f58ca)

    By David Conover

    The El Boleo Copper Project is currently in the final design stages for development of a 3-MM-tonne/yr underground copper mine located in Baja California, Mexico. The nearly horizontal mineralized zo

    Jan 1, 2009

  • SME
    Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and Exploration (e0c562d4-30bd-4458-b8cb-8e6a1cd409aa)

    By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu

    A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was

  • SAIMM
    Improving the quality of tinplated steel using a novel technique to study the effect of industrial process parameters - Synopsis

    By G. S. Maré

    Tin plating operations are of a complex nature due to the many operational variables that need to be controlled in order to create a product of required quality. The work in this report lays the bas

    Jan 1, 2010

  • DFI
    Methods Of Constructing Concrete Piles On Heavily Contaminated Sites

    By N. C. Matheson

    The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c

    Jan 1, 1989

  • AUSIMM
    The Measurement of Blast Induced Vibrations in Soil

    By G C. Sen

    All mining and quarrying operations that employ blasting to fragment and move broken ground have a price to pay for æby-productsÆ such as vibration and noise. These æby-productsÆ cannot be eliminated

    Jan 1, 1999

  • SAIMM
    Unplanned dilution and ore loss prediction in longhole stoping mines via multiple regression and artificial neural network analyses

    By H. Jang, Y. Kawamura

    Unplanned dilution and ore loss directly influence not only the productivity of underground stopes, but also the profitability of the entire mining process. Stope dilution is a result of complex inter

    Jan 1, 2015

  • AUSIMM
    Characterisation of Manganese Ores

    Characterisation of Manganese Ores

    Sep 13, 2010

  • DFI
    Wharf Damage Due To Settlement Of Deep Soft Subsoil ? Synopsis

    By Z. Y. Ding

    This paper emphasize two points in piled wharf design which are important than structure calculation. First, during design of piled wharf on soft stratum, the bank slope stability is the first importa

    Jan 1, 1991

  • AUSIMM
    Statistical Analysis of Sampling and Assaying Results, Drilling Campaign, King Island Scheelite Mine, Tasmania

    During the drilling campaign conducted between October, 1942; and May, 1943, to prove the extent of the scheelite deposit worked by King Island Scheelite N.L. at Grassy, King Island, Tasmania, 35 hole

    Jan 1, 1950