Search Documents

  • ABM
    CUSTOMIZATION & VERSATILITY IN COPPER PLATING VARIABLE HIPER COATING

    By Franz Kolmbauer

    At Primetals Technologies Brazil Ltda. Rio de Janeiro Santa Cruz Workshop we electroplate mold coppers for continuous casting by tank plating. Tank plating submerges the copper in the bath of the plat

    Aug 16, 2017

  • CIM
    Classification System Upgrades in HVC Primary Mill Grinding Circuits – Hybrid Cavex Cyclone Testing and Installation

    By Rob Sloan, Simon Yu, Rob Robison, Mark Schmidt

    "In 2000-2009, Highland Valley Copper (HVC) tested new generation 660 mm cyclones supplied by various manufacturers in an aim to replace existing first generation 762 mm cyclones without success. Due

    Jan 1, 2013

  • AUSIMM
    Long-Term Mine Planning at the Largest Phosphate Mine in Brazil

    Tapira Mine (Tapira, MG, Brazil) is the largest phosphate ore and concentrate producer in Brazil. The mine is an open pit, which until recently operated with a large equipment fleet and now uses a sma

    May 1, 2010

  • SME-ICGCM
    Longwall Shield Recovery Using Mobile Roof Supports (64264c53-830d-4e84-b91e-78532103884a)

    By Frank Chase

    Longwall mining has gained the reputation as being the safest extraction method in underground coal mines. However, one of the most difficult tasks associated with longwall mining is moving the face

    Jan 1, 2007

  • IIMP
    La microscopía óptica y los procesos metalúrgicos- aplicaciones en casos peruanos

    By César Cánepa

    Las especies minerales son los sujetos del quehacer metalúrgico -en tanto, el diseño, la optimización operativa y el monitoreo periódico de una planta de tratamiento requieren de un adecuado conocimie

    Sep 12, 2005

  • SME
    Optimization Of A Grinding And Classification Circuit Of A Magnetite Ore Processing Plant Through Computer Simulation

    By J. A. Delgadillo

    Computer simulation and mineral modeling was applied to the optimization of a grinding circuit in a plant processing 256 t/h magnetite. These tools were used to develop a grinding and classification c

    Jan 1, 2008

  • CIM
    World’s First Power Demand Stabilization System for A 3-Electrode Electric Arc Furnace for Shielded Arc Nickel Smelting

    By B. Lueger, D. Shen, M. Sedighy, R. Rand, R. Saleh, J. Cheung, M. Rifai, I. Khan, W. Sauri, D. Setianto

    The world’s first active power demand stabilization system for a 3-electrode electric arc smelting furnace was commissioned at PT Vale Indonesia in December 2012 on Furnace No. 2 using an SPLC (Smart

    Jan 1, 2014

  • AUSIMM
    Small Scale Carbonization and Coke Studies in Coalfield Exploration and Mine Development

    Reliable and discriminating small, laboratory scale methods of study have been developed and used successfully in the critical evaluation and interpretation of the carbonization characteristics of a w

    Jan 1, 1969

  • AUSIMM
    Geostatistical Modelling of Hydraulic Fracturing Pressures at El Teniente Mine

    By P Landeros, D Benado, J Cornejo, A Pinochet, C Caviedes

    In 2005, El Teniente mine began preconditioning the primary rock mass by hydraulic fracturing (HF). The major perceived benefits of this process are a decrease in the magnitude of the expected maximum

    May 9, 2016

  • DFI
    I - 280 / San Francisco Pile Load Test Results And Seismic Design Guidelines - 1. Earthquake Loading Of Structures - A Brief Overview - 1.1 The 1989 Loma Prieta Earthquake - 1.1.1. CSMIP Records - Recorded Time-History Data

    By James A. Mason

    The State of California has instrumented numerous buildings, bridges, and dams throughout the state with earthquake recording devices. These accelerometers are strategically placed to measure the resp

    Jan 1, 1993

  • SAIMM
    Presidential Address: Rock Engineering - Good Design Or Good Judgement?

    Rock engineering has now been practised as a discipline for about50 years, and many sophisticated methods of analysis for use in rock engineering design have been developed. However, analysis is only

    Jan 1, 2003

  • CIM
    Fugitive Dust Control at Porcupine Joint Venture – Dome Mine

    By John Folinsbee, Brian Danyliw, Tony Y. Chong

    "Control of fugitive dust has become increasingly important in the mining industry both from a health and safety and environmental standpoint. Mining operations in particular have required improved fu

    Jan 1, 2005

  • AUSIMM
    Management of Seismicity at the Beaconsfield Gold Mine, Tasmania

    By A R. Penney

    Since mining-induced seismicity first became apparent at the Beaconsfield Gold Mine in 2002, there has been an ongoing program of geotechnical investigations to understand the phenomenon and allow for

    Jan 1, 2008

  • AUSIMM
    Using Mineral Maps to Rank Potential Processing Behaviour

    Using Mineral Maps to Rank Potential Processing Behaviour

    Sep 13, 2010

  • AUSIMM
    Violent Rupture of Mid-Crustal Barriers by Fluidised Breccia (Cloncurry Fe-Oxide-Cu-Au District, Australia): Implications for Cu-Au Mineralisation and Kimberlites

    By L R. Marshall, M J. Rubenach, T G. Blenkinsop, J S. Cleverley

    The source and transport regions of fluidised (transported) breccias outcrop in the Cloncurry Fe-oxide-Cu-Au district, providing insights into the origins of other fluidised magmatic-hydrothermal brec

    Jan 1, 2005

  • AIME
    Geophysics - Progress and Prospects

    By Sherwin F. Kelly

    One of the most succinct and illuminating perspectives of the field of geophysical exploration to appear in recent years is an article by E. A. Eckhardt, in the magazine Geophysics for October 1949. A

    Jan 1, 1950

  • SME
    Evaluating Ground Conditions Ahead of a TBM Using Probe Drill Data

    By Steven K. Duke, Jay Arabshahi

    An economic, real-time probe drill monitoring system was developed for Metropolitan Water District’s Arrowhead Tunnels project to quantitatively evaluate ground conditions ahead of a TBM. This system

    Jan 1, 2007

  • AUSIMM
    An Integrated Solid Waste Management Method for Western Macedonia, Greece

    An Integrated Solid Waste Management Method for Western Macedonia, Greece

    Sep 13, 2010

  • DFI
    Structural And Geotechnical Aspects Of Long Driven Piles For Urmiyeh Lake Causeway Bridge

    By Mohammad Eslami

    The Tabriz-Urmiyeh Highway shortens the distance of north-western cities of Iran by about 130 km, resulting in improved access and efficient transit between Iran and Europe through Turkey. The highway

    Jan 1, 2010

  • AUSIMM
    Features of the New Lead Refinery at Port Pirie

    A new lead refinery with a capacity of 230,000 tons per year commenced operation at Port Pirie in October, 1959. This plant superseded the refinery which had operated from 1933 with the advent of the

    Jan 1, 1963