Search Documents

  • AUSIMM
    Optimisation of Hydraulic Filling for Underground Disposal of Tailings in Peru

    By D M R Stone

    Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis

    Jan 1, 1998

  • AUSIMM
    Still Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice Fill

    By Andersson PO

    Boliden Mineral AB Boliden Mineral AB operates nine mines in Northern and Central Sweden, producing zinc, lead and silver concentrates and copper and gold. Seven of these mines use cut and fill (C&F

    Jan 1, 1998

  • AUSIMM
    Design and Operation of Backfill for Reliable High Solids Concentration Discharge

    By A G McLean

    This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying p

    Jan 1, 1998

  • SME
    Waste Clay Ponds In Florida-Regulatory Status Report

    By S. Partney

    Waste clay ponds are a necessary part of the phosphate rock beneficiation process. They are large, averaging a square mile in size; unsightly, in that they protrude 20 to 50 feet (6 -15 meters) above

    Jan 1, 1998

  • TMS
    Thermodynamic Analysis of Copper Smelting Process

    By Zhang Chuanfu, Tan Pengfu

    "A thermodynamic model is developed to predict the distribution behaviors of Ni, Co, Sn, Pb, Zn, As, Sb, Bi, Au and Ag in copper pyrometallurgical process. In this model, as more as 21 elements (Cu, S

    Jan 1, 1998

  • AUSIMM
    Classified Tailings as Part of an Intergrated Regional Support System

    By D R Van Eck

    Western Deep Levels, a seismically active deep level told mine. stalled placing backfill in their narrow tabular workings as part of the regional support strategy in 1986. Over the years the percent

    Jan 1, 1998

  • SME
    An Update On The Nitrox Process

    By Gus Van Weert

    Capital and operating costs for a 10 tpd NITROX PROCESS® demonstration plant are being established. The flowsheet is based on Dickenson Mines' Red Lake arsenopyrite concentrate. Support for the work c

    Jan 1, 1998

  • SME
    Advances In The Calmef Process For Treatment Of Concentrates

    By Donn A. Calder, Wayne C. Henderson

    The Calmet Process for extraction and recovery of gold and silver from concentrates and high:grade ores has been a commercial reality for over two years. During that time period, almost seventy-five d

    Jan 1, 1998

  • SME
    Transfer Risk - Accelerate Closure (Trac™ ): A Fixed-price Contract Program For Site Remediation/case Closure

    By Kevin Bell

    The TRAC™ Program was developed to provide our clients with a mechanism that allows them to better manage site remedia­tion and closure costs. This program provides a fixed-price contract for site rem

    Jan 1, 1998

  • SME
    Metal Recovery Aids In Heap Leaching Appucations

    By James H. Nulty, Joseph S. Roti

    Wetting agents used for heap leach gold applications would appear to have technical merit in aiding in recovering higher levels of precious metal. Many questions, however, remain as to whether they wi

    Jan 1, 1998

  • SME
    Oal-gold Agglomeration -a Novelapproach To Gold Recovery

    By C. F. Bonney

    Spherical or oil agglomeration has been recognised for many years as a possible process for the recovery of mineraVmetal values. BP has investigated the potential of spherical agglomeration for a numb

    Jan 1, 1998

  • SME
    Heap Leaching In Desert And Equatorialcondidons

    By J. Libaude

    The Changement mine in French Guyana has, since 1983, processed gold ore by classical gravity methods. A large part of the gold is in the form of very small, free or enclosed grains. Recovery by gravi

    Jan 1, 1998

  • SME
    Design And Operation Of A Microwave Pilot Plant For Calcining Refractory Gold Ores And Concentrates

    By P. Brooks, W. LaRochelle, J. M. Tranquilla

    EMR's recently commissioned Pilot Plant in Fredericton, N.B. Canada, the latest and largest in the company's sequence of prototype and demonstration systems, is being used as a process development fac

    Jan 1, 1998

  • SME
    The Itos Chloride Leach Plant For Silver - Two Years Into Production

    By Daniel W. Kappes

    In late 1995 at the Randol symposium in Squaw Valley, I gave a paper which described the Itos project flowsheet. At that time, project construction was nearly completed and stmtup was close. This pape

    Jan 1, 1998

  • SME
    Ilvipact Of Top Management Phil.dsophy On Heap Leach Design

    By R. Bruce Thorndycraft

    Heap leaching should not be chosen for development of a property solely on the basis of paper studies. Management should be made to understand where the risks are in heap leaching, and management shou

    Jan 1, 1998

  • AUSIMM
    Metallurgical Characterisation of George Fisher Ore Textures and Implications for Ore Processing

    By Vink L, Johnson N. W, Mackenzie J, Young M. F, Johnston M, Landmark V

    The influence of ore textures on metallurgical behaviour is poorly understood for most ores. An alternative method for characterising ore textures and for determining the resulting implications on o

    Jan 1, 1998

  • AUSIMM
    From Green Field Site to Block Cave Mine - Results of Northparke's Drill and Blast Design Process

    The green field site is one that has no history of mining and as such it presents the designer with a blank canvas, on which any number of drill and blasting options can be drafted. No matter which mi

    Jan 1, 1998

  • TMS
    Hw Process Technologies, Inc's Engineered Membrane Separation (EMS) ,Of Copper And Gold In Cyanide Solutions

    HW Process Technologies, Inc. (HWPT) has developed a patented membrane-based ion fractionation system, which specifically separates copper from gold and silver species in a cyanide matrix. This Engine

    Jan 1, 1998

  • SME
    BHP Copper's Lower K Hoist Conversion: Deeper, Faster, More Efficient

    By K Louie

    When BHP Copper's Lower Kalamazoo Project commenced production in January 1997, two of the four original hoists had been converted to hoist ore from the Lower K level. Conversions on these hoists

    Jan 1, 1998

  • SME
    Geology Of Wyoming's Powder River Basin Coalfield

    By Gary B. Glass

    In 1997, 92.3% or 235.7 Mt (259.8 million st) of coal produced in Wyoming came from the Wyodak coal zone in the eastern Powder River coalfield. The mined portions of the zone consist of one to three b

    Jan 1, 1998