Search Documents

Sort by

  • AUSIMM
    The Operation and Interaction of Grates and Pulp Lifters in Autogenous and Semi-Autogenous Mills (60786753-9987-4610-9db2-f26067a91f8f)

    By S Latchireddi

    Close circuiting autogenous and semi-autogenous mills is an energy efficient way of grinding and a number of operations have utilised this in the design of their comminution circuits. Owing to the lar

    Jan 1, 2000

  • AUSIMM
    The Operation and Management of Braeside Borefield, Central Queensland

    By R G. Alford

    Braeside Borefield, located 120 km southwest of Mackay, is owned by BHP Mitsui Coal Pty Ltd (BHP Mitsui). The borefield provides water to BHP MitsuiÆs South Walker Creek and Riverside Coal Mines and c

    Jan 1, 2003

  • CIM
    The Operation of a 30kt/A Copper L-Sx-Ew Plantproject in the DR Congo

    By Wei Wang

    The SMCO copper plant is located in DR Congo, and was designed by China NERIN Engineering Co., Ltd. The process is a typical hydrometallurgical plant with Leach-SX-EW, with the project treating the ox

    Jan 1, 2014

  • AIME
    The Operation Of A Froth Flotation Pilot Plant On Washery-Water Solids

    By C. D. Rubert, W. J. Parton

    LARGE quantities of fine anthracite with associated impurities are discharged with the waste water from the coal-cleaning plants in the Pennsylvania anthracite region. Furthermore, for many years this

    Jan 1, 1944

  • AUSIMM
    The Operation of a Mobile Alluvial Plant

    We operate a 50 cubic metre per hour mobile alluvial tin mine on small scattered deposits in the Irvinebank area. Wash is loaded by a Cat. 950 front end loader into the bin of a screening section and

    Jan 1, 1986

  • RMCMI
    The Operation of Gaseous Mines.

    By Samuel Tescher

    The operation of gaseous mines is a problem, due to the fact that we have not only the ordinary mine accidents to guard against, but have also the ever present menace of a mine disaster involving a la

    Jan 1, 1925

  • AUSIMM
    The Operation of Queensland Alumina Limited

    An international raw material partnership, a $164 million 900,000 long ton per year aluxAna plant; an ideal location at Gladstone, Queensland, Australia - this is Queensland Alumina Limited, on strea

    Jan 1, 1969

  • CIM
    The Operation of Rubber-Lined Pumps at Hollinger

    By Walter Greaves

    THIS paper describes a series of tests performed at the Hollinger mill during the past four years, in which both metal and rubber-lined pumps were used for pumping sand and slime. While conditions wil

    Jan 1, 1939

  • TMS
    The Operation Of The Inco Flash Furnace Uptake: Combustion Of H2S And Formation Of Uptake Buildup

    The 15m high Inco flash furnace uptake was designed as a reaction chamber with the objective of destroying the H2S contained in the furnace off-gas by combustion with oxygen at about 1300°C. Until rec

    Jan 1, 2003

  • TMS
    The Operation Of The Inco Flash Furnace Uptake: Combustion OfH2S And Formation Of Uptake Buildup

    By J. Lui

    The 15m high Inco flash furnace uptake was designed as a reaction chamber with the objective of destroying the H2S contained in the furnace off-gas by combustion with oxygen at about 1300?C. Until rec

    Jan 1, 2003

  • AUSIMM
    The Operation of the LAROX PF-50 Pressure Filter at 'Ellatzite-Med' Flotation Plant, Bulgaria

    The Operation of the LAROX PF-50 Pressure Filter at 'Ellatzite-Med' Flotation Plant, Bulgaria The implementation of Larox pressure belt filter, type Larox PF-50 provided within 6˜8% moistur

    Sep 13, 2010

  • AUSIMM
    The Opportunity Cost of Homogenising Concentrator Feed

    Recently published extensions to the mill-dump cutoff grade theory for joint open pit-concentrator operations lead to equations that must be simultaneously satisfied as a necessary condition for an op

    Jan 1, 1981

  • AIME
    The Opportunity of the Engineer

    By PHILIP N. MOORE

    IT is a pleasure to realize even at that day the dignity of the engineer's calling was upheld. May I also add my firm belief that today there be many engineers who will qualify to the specificati

    Jan 1, 1926

  • CIM
    The Opti-Trak system, a system for automating today's LHDs and trucks

    By D. W. Euler, D. G. Brophey

    "In an attempt to address the issue of rising labour costs, and to improve productivity, a laser-based system to guide underground LHDs and trucks has been developed. This comprehensive system is know

    Jan 1, 1994

  • CIM
    The Optical Properties of Mixed Au and Pt Nanoparticle Colloids

    By Daven N. Compton

    The optical properties of Au nanoparticles have been known for some time, with both Au colloids and Au nanoparticles embedded in glasses having been extensively studied. In this study, Pt nanoparticle

    Oct 1, 2003

  • CIM
    The Optimal Block Size in the Block Caving Mining Method

    By J. Someehneshin

    Nowadays along with population growth, industry development, consumption of mineral resources and the fact that the reserves on hand are running out, the depth of surface and underground mines for fur

    Aug 1, 2013

  • SME
    The Optimal Control on Ore-Rock Excavation in Surface Mining

    By G. Q. Huang, Q. X. Yun, Z. Y. Gui

    This paper provides a new approach to deal with control of ore-rock excavation by means of the optimal control theory-an important branch in cybernetics. In the optimal control theory, the elementary

    Jan 1, 1996

  • SME
    The Optimal Controlled Flow Mine Ventilation Problem: An Operations Research Approach

    By Thys B. Johnson

    This paper presents a new algorithm for solving the Controlled Flow Mine Ventilation Problem in an optimal manner - minimum power consumption. The use of booster fans and restrictions on the locations

    Jan 1, 1982

  • TMS
    The Optimax? Program ? The Optimal Relationship For Owner/Clients To Procure Industrial Services

    By Neil Smith

    Mineral processing plants typically procure a range of industrial services from contractors. Their satisfaction and value received is directly affected by how the services are procured, rationalized a

    Jan 1, 2006

  • TMS
    The Optimisation and Control of Process Chemistry at Bulong Nickel Operations (abstract only)

    By John Frederick Colloghon, O&apos

    Bulong remains the only hydrometallurgical process plant in the world that recovers nickel and cobalt directly from high pressure acid leach (HPAL) laterite leach liquors without need for precipitatio

    Jan 1, 2004