Search Documents

Sort by

  • DFI
    Recommendations For Implementing And Interpreting Non­Destructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.

    By Jose L. Garcia

    The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra

    Jan 1, 2006

  • SAIMM
    Recommendations For Site Investigation, Design, Construction, Testing, Monitoring And Maintenance Of Permanent Intruded Concrete Plugs

    By G. S. Littlejohn

    Following study of historical South African practice and a review of recent experience gained during the design, construction and testing of the high pressure plugs at the South Deep Water Barrier Pro

    Jan 1, 2006

  • IMMS
    Recommendations For The Conservation And Management Of The Biodiversity Of Deep Sea Ecosystems Targeted By Seabed Mining (Polymetallic Nodule Deposits, Cobalt-Rich Ferromanganese Crusts And Hydrothermal Sulfides)

    By Virginie Tilot

    Recommendations have been drafted following an international multidisciplinary panel discussion organized at UNESCO/IOC by the Académie des Sciences d?Outre-Mer on 15 December 2010 conveyed, according

    Jan 1, 2011

  • AUSIMM
    Recommended Design Methods and Serviceability Limits for Permanent Rock Bolts

    By D J Maconochie

    The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with

    Mar 8, 2011

  • CIM
    Recommended Practices for Application, Installation and Calibration of a Weightometer

    By D. G. MacBeth

    Most belt scales on the market are factory calibrated to minimum accuracy figures of 0.1% - 0.2% at several load points. However, if the same belt scale is not properly installed and maintained on the

    Jan 1, 1975

  • CIM
    Recommended reading: IGWG report on mining taxation

    By Robert B. Parsons

    "A joint federal/provincial/industry subcommittee of the Intergovernmental Working Group on the Mineral Industry (IOWG) has published an informative and readable report on taxation matters concerning

    Jan 1, 1986

  • DFI
    Recommended Steps And Procedures For Planning And Performing A Geotechnical Investigation For A Seismic Retrofit ? Introduction

    By Mark DeSalvatore

    Currently, at Caltrans, the Office of Structure Design is carrying out an extensive seismic retrofit program involving transportation structures throughout California. The goal of the retrofit program

    Jan 1, 1993

  • CIM
    Recommentlotions on Mining Taxation Submitted to the Ontorio Committee on Taxation

    By W C. Shakespeare

    The Ontario Committee on Taxation is making a comprehensive study of taxation in the Province of Ontario, and in this connection has received representations concerning mining taxation from a number o

    Jan 1, 1965

  • SAIMM
    Recommissioning A Two-Km Long Waste Mica Slurry Pipeline

    By P. Harris, N. Heywood

    An existing 1 800 m long pipeline, which carried waste mica slurry from kaolin processing, is to be recommissioned. The mica solids throughput is to be substantially increased from 5.2 t/h up to a max

    Jan 1, 2007

  • SAIMM
    Reconciliation along the Mining Value Chain

    By A. S. Macfarlane

    "SynopsisMetal accounting and reconciliation is an increasingly important governance issue in all mining operations, in that it is required, from a risk management perspective, that the company is in

    Jan 1, 2015

  • AUSIMM
    Reconciliation at KCGM Fimiston Operation

    By T Berryman

    The Fimiston reserve is being depleted at the rate of one million ounces per year; most of which is processed by the Fimiston plant, with the remainder being stockpiled. As for most other large open c

    Jan 1, 2006

  • AUSIMM
    Reconciliation at the Musselwhite Mine - From Exploration to Production

    The Musselwhite mine, located in northwestern Ontario, Canada, has been an underground narrow-vein gold producer since the spring of 1997. As an exploration project at the feasibility stage, much effo

    Jan 1, 2002

  • SME
    Reconciliation of Mine Site, Mineral Processing Plant, Concentrate and Tailings Inventories

    By J. Mark Richardson

    Modern mining operations are increasingly affected by complex economic factors. Broad and rapid fluctuations in metal prices, rising operating costs, socio-political trends and the inherent technical

    Jan 1, 1991

  • AUSIMM
    Reconciliation of Orebody Model Predictions – System and People

    By T Burns, P Savory

    In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data

    Aug 18, 2014

  • AUSIMM
    Reconciliation of the McKinnons Gold Deposit, Cobar, New South Wales

    By Snowden D. V, Standing C. A, Ryba A, Bywater A

    McKinnons open pit gold mine, located within the Cobar Basin in New South Wales, is characterised by complex mineralisation controlled by the intersection of steep faults in the hinge zone of an ant

    Jan 1, 1997

  • SAIMM
    Reconciliation of the Mining Value Chain – Mine to Design as a Critical Enabler for Optimal and Safe Extraction of the Mineral Reserve

    By M. Bester, R. Carey, T. Russell, J. van Heerden

    "In order to reach the goal of optimal and safe extraction of the mineral reserve, the mining industry is increasingly focusing on reconciliation across the mining value chain to ensure that the minin

    Jan 1, 2016

  • AUSIMM
    Reconciliation Principles for the Mining Industry

    Reconciliation involves the collection of tonnage, grade (quality) and contained metal (product) data from disparate and hopefully independent sources. Examples are exploration data, production sampli

    Sep 26, 2011

  • SME
    Reconciliation Wars — Who’s Data Is Right?

    By J. Best, K. Gallant

    This paper explores the age-old concept of mine-mill reconciliation from a new perspective. Advances in reconciliation processes have been slow to materialize because in the quest for “rightness”, eng

    Jan 1, 2004

  • AUSIMM
    Reconciliation – Outcomes and Expectations

    By W J. Shaw

    Mining operations must become more predictable to overcome the volatility that has characterised the mining industry. Comparisons of production against predictions will become more consistent as minin

    Aug 18, 2014

  • NIOSH
    Reconciling longwall gob gas reservoirs and venthole production performances using multiple rate drawdown well test analysis

    By C. Özgen Karacan

    Longwall mining is an underground mining method during which a mechanical shearer progressively mines a large block of coal, called a panel, in an extensive area. During this operation the roof of the

    Jan 1, 2009