Search Documents

Sort by

  • CIM
    Private Regulatory Fragmentation As Public Policy: Governance In Canada?s Mining Industry (DRAFT / ABRIDGED VERSION)

    By José Carlos Marques

    This paper addresses recent calls to study the role of the state in private regulation. Using an historical, organizational-field approach, I trace and explain the evolution of public debates and inte

    Aug 1, 2013

  • SME
    Private Weather Services Can Benefit Mineral Producers

    By G. H. K. Schenck

    Weather changes of a daily, weekly, or seasonal period affect mineral production and cause significant losses that are considered unavoidable. Private weather forecasting services are available on a c

    Jan 1, 1970

  • CIM
    Privateer Mine

    By H. C. Gunning

    The Privateer is the major mine of the Zeballos mining camp; with a total production from May 1937 through the first half of 1946 of $5; 610; 423 from 139; 254 tons of ore. This includes a small produ

    Jan 1, 1954

  • AIME
    Pro and Con Licensing

    THE Directors of the Institute at the May meeting voted to take a referendum of our members on the subject of licensing engineers. At the June meeting, this action was rescinded, it being felt that th

    Jan 7, 1923

  • SME
    Proactive Approach To Addressing Environmental Concerns For Tunneling Under Austin

    By Ray Brainard

    The Jollyville Transmission Main will be a 10.5-km- (6.5-mile)-long, 213-cm (84-in.) diameter rock tunnel. The tunnel will pass beneath the Balcones Canyonlands Preserve, which was established to prot

    Jan 1, 2012

  • ISEE
    Proactive Controls for Highwall Stability

    By Trevor Ames

    Highwall instability, and sometimes referred to as ground failures, historically are a consistent contributor of mine injuries and fatalities within surface mines. To combat this several efforts, incl

    Jan 1, 2015

  • CIM
    Proactive Corrosion Management and Monitoring Techniques to Improve Operations and Maintenance Strategies

    By Afshin Sadri, Wai Lai Ying, Brycklin Wilson, Zoe Coull

    "Although there have been great steps forward to integrate corrosion engineering into operations, there is still an underlying tendency for maintenance tasks to be performed in a reactive manner. This

    Jan 1, 2017

  • SME
    Proactive Interburden Fracturing Using Underground Inseam Drilling with Validation Monitoring

    A series of gas inrush events occurred during development at Grosvenor mine resulting in exposure to elevated levels of methane at the production face. A total of 22 gas inrush events occurred releasi

    Jan 7, 2020

  • AUSIMM
    Proactive Measures for Fatality Prevention in the Mining Industry ù Why Fatalities Persist While Lost Time Injuries Decline

    The traditional measure of Lost Time Injury Frequency Rate (LTIFR) as a measure of improvement in safety performance is recognised as inadequate and misleading, lulling managers into believing that sa

    Jan 1, 2003

  • SME
    Proactive measures to evaluate geotechnical risk in development for deep mining – Onaping Depth Project case study

    By B. Simser, T. Butler, A. Hall

    The longterm future of Glencores’ mining operations in the Sudbury basin area of Ontario, Canada likely depends on mining deposits at depths below two kilometres. To gain a better insight into the roc

    Apr 26, 2022

  • CIM
    Proactive Mineral Waste and Acid Rock Drainage Management at Rio Tinto

    By R. K. Borden

    Rio Tinto is committed to proactive mineral waste and acid rock drainage management. Corporate requirements are closely aligned with the GARD Guide principles of early geochemical characterization and

    Jan 1, 2011

  • SME
    Proactive Safety Practices At S&B Industrial Minerals S.A.

    By M. Stefanakis

    Respect for the people is one of the main values of S&B. Such respect needs to be manifested by actions ensuring the bodily and spiritual integrity of personnel in pursuing their work. The ultimate ta

    Jan 1, 2007

  • ISEE
    Proactive Waste Minimization Initiatives for Energetic Waste Sites

    By T Barnes, K D. Sexton, T J. Tope

    For the past decade, the U.S. Department of Defense (DoD) has been under increasing pressure from state and federal regulatory authorities to develop management strategies for waste streams generated

    Jan 1, 1997

  • SME
    Proactively Improving Fluid Power Safety

    By T. R. Ley

    "INTRODUCTION Brutally honest mining executives will tell you that “safety is job #1 but.. dollars are also extremely important”. When economic times are tough, as they are now in mining, it can feel

    Jan 1, 2016

  • CIM
    Probabilistic Analysis for Mine Design, Using Coal Pillar Design to Illustrate its Potential Usefulness

    By T. R. Kostecki, J. Hirschi

    "Analytical engineering design is based upon a trial-and-error iterative and deterministic process. Within this process, the engineer obtains some estimated values, plugs them into de facto closed-for

    Jan 1, 2015

  • AIME
    Probabilistic Analysis Of Blasting Impact On Open Pit Stability

    By Dae S. Young

    A new probabilistic approach is introduced for slope stability analysis including adverse impact of blasting vibrations. The material strength within a slope area is randomized in this bi-variate join

    Jan 1, 1984

  • SME-ICGCM
    Probabilistic Analysis of Blasting Impact on Open Pit Stability (95ce6127-68ed-453f-9268-476a1af1dd45)

    By Dae S. Young

    A new probabilistic approach is introduced for slope stability analysis including adverse impact of blasting vibrations. The material strength within a slope area is randomized in this bi-variate join

    Jan 1, 1984

  • AIME
    Probabilistic And Computer Methodologies Used By The U. S. Geological Survey For Geological Estimates Of Undiscovered Oil And Gas Resources In The United States

    By Betty M. Miller

    INTRODUCTION In September 1974 the Resource Appraisal Group of the Branch of Oil and Gas Resources, U. S. Geological Survey, was asked to aid the Federal Energy Administration (FEA) in its legal re

    Jan 1, 1977

  • SAIMM
    Probabilistic approach in rock slope stability analysis for Himalayan conditions

    By S. Pathak, B. Nilsen

    Abstract: In recent years, probabilistic approach with the calculation of probability of failure instead of a factor of safety against failure is emerging in practice. The main objective of the paper

    Jan 1, 2003

  • SME-ICGCM
    Probabilistic Approach to Coal Pillar Design

    By Ben Fahrman

    The classical approach to engineering design involves the purely deterministic calculation of the factor of safety, the ratio of strength to stress. The factor of safety is an easy calculation to perf

    Jan 1, 2013