Search Documents

Sort by

  • AUSIMM
    Predictive Site-Wide Water Quality Modelling as a Tool for Mine Planning and Permitting - A Recent Canadian Example

    By A Fitzpatrick

    An integrated and dynamic water balance and water quality model for a proposed base metal mine has been created using the GoldSimÖ software package. The model was initially developed to address the wa

    Jul 10, 2012

  • AUSIMM
    Predictive spatial modelling of rock mass properties using machine learning techniques

    By J Q. Shi, M Karakus, Y Liu

    Predicting the spatial distribution of rock mass properties in cave mining is a critical challenge. In this study, we introduce a novel machine learning-based model to advance our comprehension of roc

    Sep 1, 2024

  • AUSIMM
    Predictive Three-Dimensional Modelling of Nuggety Gold Orebodies, Sunrise Dam, Western Australia

    By M J. Nugus, F Clark, E J. Hill, J T. Carswell, J S. Cleverley, N H. S Oliver

    High-nugget gold orebodies are difficult to model in 3D because samples from diamond drill core are generally too small to provide reliable estimates of the gold content of the larger body of rock, an

    Sep 26, 2013

  • SME
    Predominance Area Diagrams Bounding the Cu-As-S-O System’s 3DPredominance Diagram at 900 K (627 °C) Mining, Metallurgy and Exploration

    By M. Sadegh Safarzadeh, Stanley M. Howard

    The two-dimensional predominance area (Kellogg) diagram (PAD) surfaces bounding the three-dimensional Cu-As-S-O system were constructed at 900 K. The computations employed gases As4O6(g), O2(g), and S

  • NIOSH
    Predriven Recovery Rooms Reduce Longwall Equipment Transfer Time - Objective

    Reduce longwall equipment transfer time between panels by utilizing a predriven recovery room, and thus eliminate the premove preparation associated with most equipment recovery methods. Background

    Jan 1, 1989

  • SME
    Preexcavation Deep-Hole Stress Measurements For Design Of Underground Chambers--Case Histories

    By Bezalel C. Haimson

    Long before excavation begins, the in situ stresses in the horizon of planned underground chambers can be measured by employing the hydrofracturing technique in existing exploratory holes. Such measur

    Jan 1, 1976

  • AIME
    Preface

    Jan 1, 1924

  • AIME
    Preface

    Jan 1, 1923

  • AIME
    Preface

    Jan 1, 1888

  • AIME
  • AIME
  • AIME
  • AIME
  • AIME
  • AIME
  • IOM3
    Preface (2a00466e-9a28-4c59-b79a-3ed1115d65b4)

    By Ruddle R. W.

    Although copper has been smelted for many years, relatively small attempt has been made in the past to examine the fundamental physical chemistry of the processes involved. Therefore, technological de

    Jan 1, 1953

  • AIME
  • AIME
  • AIME
  • AIME