Search Documents

Sort by

  • TMS
    Pilot Trial of Detoxification of Chromium Slag in Cyclone Furnace and Preparation of Glass-Ceramics with the Water-Quenched Melt

    By Lingling Zhang, Daqiang Cang, Guizhou Zhao

    Pilot trial ofthe detoxification ofchromium slag in cyclonefurnace and the preparation of glass-ceramics were investigated in a power plant in China. 10wt.%chromiumslagweremixedwithpulverizedbituminou

    Mar 1, 2018

  • TMS
    Pilot Trial of Direct Modification of Molten Blast Furnace Slag and Production of High Acidity Coefficient Slag Wool Fibers

    By Jun Li, Lingling Zhang, Daqiang Cang, Guizhou Zhao

    Pilot trial of direct modification of molten blast furnace slag and production of high acidity coefficient slag wool fibers were investigated nearby a blast furnace. Molten blast furnace slag discharg

    Mar 1, 2018

  • AUSIMM
    Pilot Tunnel and Blast Enlargement for Vibration Control

    By Lunardi P, Pelizza S

    The link between the Lecco bypass and major road SS36 (Italy) requires the construction of a double two-way tunnel (through the mount San Martino carbonatic massif). The tunnel excavating section

    Jan 1, 1987

  • IOM3
    Pilot-plant bio-oxidation of gold-bearing arsenopyrite concentrates

    By J. R. Budden, P. A. Spencer, J. Barrett

    The initially produced arsenic (III) is very toxic to the unconditioned culture but the mixed culture has the capacity to oxidise it to arsenic (V) in the presence of iron (III). It was possible to bu

    Apr 1, 1991

  • CIM
    Pilot-plant data for the design of primary autogenous and semi-autogenous mills

    By C. A. Rowland

    "Plant owners and operators, plant designers and grinding mill manufacturers are giving much attention to the design and manufacture of autogenous and semi-autogenous grinding mills, particularly the

    Jan 1, 1981

  • CIM
    Pilot-Plant Facilities for Hydraulic Transport of Solids

    By L. G. Smith, C. A. Shook, W. H. W. Husband, W. Schriek

    "The flow of slurries in pipelines is governed by many variables, and the study of the influence of each of these variables is difficult, if not impossible, in some cases. Many correlations are availa

    Jan 1, 1973

  • AIME
    Pilot-Plant Investigation of Concentration of Blackbird Cobalt Ore by Roast-Flotation Process

    By S. F. Ravitz, S. R. Zimmerely

    High-grade cobalt concentrates were produced from the complex Blackbird ore with very good recovery in continuous pilot-plant operations in which a low-grade bulk cobaltite-pyrite flotation concentrat

    Jan 10, 1950

  • SME
    Pilot-Plant Pressure Filtration Of Coal-Preparation-Plant Refuse Slurry

    By D. W. Hutchinson

    One of the most important problems facing the coal industry today is the disposal of refuse from the coal preparation plants in a safe, economical, and efficient manner while complying with all legal

    Jan 1, 1977

  • AIME
    Pilot-Plant Production Of Electrolytic Magnesium From Magnesia

    By C. K. Stoddard, R. G. Knickerbocker, E. T. Leidigh, R. R. Lloyd, K. L. Mattingly

    DURING July 1941, a study was initiated at the Boulder City Experiment Station of the Bureau of Mines on proposed methods for the production of magnesium metal. The major emphasis was placed upon deve

    Jan 1, 1945

  • SME
    Pilot-Plant Solution Mining And Environmental Monitoring At The Mutooroo Copper Mine, South Australia - Introduction

    By J. H. Canterford

    To date, large-scale solution mining has received little attention in Australia, although the potential of this technique has not gone unnoticed. The possibility of long-term damage to the local envir

    Jan 1, 1981

  • SAIMM
    Pilot-Plant Solvent Extraction Of Cobalt And Nickel For Avmin?s Nkomati Project

    By A. Feather

    Avmin have developed a flowsheet for the refining of copper, nickel and cobalt from Nkomati concentrates. Cobalt is recovered from calcium-saturated solution using Cyanex® 272. Nickel is subsequently

    Jan 1, 2002

  • AUSIMM
    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore

    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore The results of pilot-plant tested ammoniacal-cyanidation of gold recovery from copper gold-bearing ore are

    Sep 13, 2010

  • CIM
    Pilot-plant treatment of a Quebec talc ore

    By P. R. A. Andrews

    "Talc ore from Bakertalc, High water, Quebec analyzing about 60% talc, previously dry ground to about 95% minus 53 µm was beneficiated in an 11.4 kg/ h pilot-plant flotation circuit. A concentrate of

    Jan 1, 1989

  • CIM
    Pilot-Scale and Continuous Bench Testing of the Aims Cn-DTM Cyanide Destruction Process on an Australian Gold Plant Tailings Effluent

    By S. Glen

    Cyanide management practices on modern gold plants are becoming more onerous, due to environmental pressures, particularly for signatories to the International Cyanide Management Code. Operations are

    Jan 1, 2011

  • CIM
    Pilot-Scale Evaluation for the Codelco Continuous Converting Process

    By A. Moyano

    The development of the traditional converting process performed in a PeirceSmith or Hoboken converter is limited by the investment magnitude associated to the fulfillment of the environmental regulati

    Jan 1, 2007

  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014

  • CIM
    Pilot-Scale Industrial Microwave-IR Sorting of Porphyry Copper Ores

    By C. Dodds, R. S. Ferrari-John, The University of Nottingham, G. Dimitrakis, J. Katrib, A. R. Batchelor

    "Sorting technologies have the potential to reduce energy use in comminution by rejecting uneconomic ore before feed material enters the mill. However, a major challenge for sorting porphyry copper or

    Jan 1, 2016

  • AUSIMM
    Pilot-Scale Kiln Processing of New Zealand Ilmenite

    By Mills R, Shannon W. T, Finch J

    As an extension to investigations into methods of upgrading the Iitania content of ilmenite concentrate from beach sands using 100 g/day, a small pilot plant treating 23 kg/ day of ilmenite was used.I

    Jan 1, 1977

  • SME
    Pilot-Scale Passive Treatment Test of Contaminated Waters at the Historic Ferris-Haggarty Mine, Wyoming

    By James J. Guesk, Robert W. Reisinger, Timothy C. Richmond

    A high-altitude (2,900 m [9,500 ft]) historic underground copper mine in Wyoming is discharging copper-laden water with a neutral pH into an otherwise pristine creek. The Wyoming Abandoned Mine Land p

    Jan 1, 2000

  • AUSIMM
    Pilot-Scale Study of Deep Cone Thickener for Phosphatic Clay Dewatering

    Pilot-Scale Study of Deep Cone Thickener for Phosphatic Clay Dewatering

    Sep 13, 2010