Search Documents

Sort by

  • DFI
  • DFI
  • AUSIMM
    Piling and Raise Bore Construction – Key Learnings from a Client’s Perspective

    By R Austerberry, S Green

    Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me

    Mar 24, 2014

  • DFI
    Piling Design and Construction Codes and Standards for Buildings A United States Perspective

    By Rudolph P. Frizzi

    "Abstract Pile design for building structures in the United States is typically performed by: 1) investigating and assigning engineering parameters to the respective ground bearing materials, 2) calcu

    Jan 1, 2014

  • DFI
    Piling Framed Tie down Concrete Retaining Wall

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins

    Jan 1, 2007

  • DFI
    Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in

    Jan 1, 2007

  • DFI
    Piling In Calcareous Red Bed Soils and Weak Rock Formation – Design Development for a Gas Processing Facility

    By Rick Piovesan, Pramod Rao, Nihal Bohra, Mark Wahler

    "This paper discusses the approach followed for the geotechnical design of 355 mm and 457 mm diameter driven open-ended steel pipe piles used for a gas plant at a green field site in Pilbara region in

    Jan 1, 2015

  • DFI
    Piling In Coal Measures At The City Of Manchester Stadium For The Commonwealth Games 2002

    By Colin Curtis

    The City of Manchester is hosting the 2002 Commonwealth Games. A world class Stadium with a 38,000 capacity was commissioned for a site located close to the City Centre. The Stadium location is in an

    Jan 1, 2002

  • DFI
    Piling Practice in Sedimentary Granular Soils of Santa Cruz, Bolivia

    By Mario Terceros H, Bengt H. Fellenius

    "ABSTRACTThe city of Santa Cruz, Bolivia, is historically dominated by houses and three to five storey buildings.The geology in and around the city is such that even very light buildings need to be su

    Jan 1, 2014

  • DFI
    Piling Problems - Introduction

    By D. Millgard

    Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.

    Jan 1, 1991

  • DFI
    Piling Projects Constructed With Vinyl Polymer Support Fluid In Glasgow, Scotland

    By Derek J. Lennon

    Ground conditions in central Glasgow generally comprise loose granular deposits overlying stiffer soils. CFA piling would normally be preferred for urban sites in these ground conditions, but flightin

    Jan 1, 2006

  • DFI
    Piling The Gateway To Europe

    By Howard Roscoe

    Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su

    Jan 1, 2002

  • SME
    Pillar And Roof Bolting Design Under Conditions Of Weak Roof And Multi-Seam Interaction - A Case Study

    By Y. Q. Zhang, S. S. Peng

    Numerical modeling was used to design the pillars and bolting plan for a mine with weak roof and multi-seam stress condition. Previous mining experience, pillar/roof yielding and in-situ horizontal st

    Jan 1, 2004

  • AUSIMM
    Pillar Barricades at Broken Hill South Limited, Broken Hill, N.S.W.

    This paper describes the methods of constructing timber barricades against pillars of ore in the South Mine, property of Broken Hill South Limited, Broken Hill, N.S.W., and discusses the behaviour of

    Jan 1, 1946

  • SAIMM
    Pillar Behaviour and Seismicity in Platinum Mines

    By S. M. Spottiswoode

    Crush pillars are widely used in mine workings on the Merensky Reef in the Bushveld Complex to prevent panel collapses. Crush pillars are expected to fail as or soon after they emerge from the face an

    Jan 1, 2014

  • CIM
    Pillar Blasting at the Murray Mine

    In April, 1961, a large pillar was removed by blasthole mining methods at Inco's Murray mine. More than half a million pounds of explosives were used to break 2,120,000 tons of ore in a single un

    Jan 1, 1963

  • AIME
    Pillar Blasting at the Pine Creek Mine

    By L. A. Wright

    Union Carbide Corp.'s Pine Creek mine in California is the largest known tungsten deposit in the West, and the producer of well over five million tons or ore to date. Located 21 miles northwest o

    Jan 5, 1964

  • SME-ICGCM
    Pillar Collapse at Welgedacht Colliery, South Africa: A Case Study

    By J. Nielen van der Merwe

    During the process of pillar extraction at the Welgedacht Colliery, an unexpected pillar collapse resulted in the entrapment of equipment. The area was visited soon after the event to evaluate the sta

    Jan 1, 1999

  • AIME
    Pillar Deformation in a Bituminous Coal Mine

    By Charles Holland

    MINERS have observed for many years that as pillars are removed in mining operations the pillar adjacent to those mined out frequently shoes evidence of being compressed. Although this has been known

    Jan 1, 1937

  • SME-ICGCM
    Pillar Design - Continuous Miner Butt Section And Longwall Development Sections

    By Lawrence R. Artler

    The North American Coal Corporation, its subsidiaries and other coal companies, have been mining the Pittsburgh #8 seam in Eastern Ohio for several decades. Underground mining by the "room and pillar"

    Jan 1, 1984