    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Pile Foundations In Liquefiable Soils - A Case Study - Synopsis

    By R. K. M. Bhandari

    Geotechnical investigation for a LPG plant located in Assam state - an area of high seisimicty - revealed a layer of loose to medium silty sand susceptible to liquefaction at some depth below the fini

    Jan 1, 1996

  • DFI
    Pile Inspector's Guide To Hammers ? Introduction

    The pile inspector is a critical element in the quality control process necessary for a successful pile installation project. This guide is intended to provide the inspector with a basic understanding

    Jan 1, 1995

  • DFI
    Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - Introduction

    By Jon H. Gould

    This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub

    Jan 1, 1992

  • DFI
    Pile Installation Recorder Tests For ACIP/CFA Piles - Introduction

    By Garland Likins

    The Texas Department of Transportation, now considering using Augered Cast-In-Place (ACIP) Piles (also known as Continuous-Flight-Auger or CFA Piles) in their foundations, awarded a research project t

    Jan 1, 1998

  • DFI
    Pile Integrity Testing In The Netherlands

    By Peter Middendorp

    Pile foundations are widely applied in the Netherlands because of the soft soil conditions. One of the popular pile types are cast-in-situ piles, which have to be integrity tested to get accepted. Int

    Jan 1, 2006

  • DFI
    Pile Lateral Behaviour under Full Scale Lateral Load Tests in Thick Compacted Marine Carbonate Sand Fill of an Artifical Island

    By Challa Venkata Rami Reddy, Anindya Roy, G. R. Konni

    This paper presents the results of pile lateral capacities obtained from both conventional design and fullscale pile lateral load tests. Conventional design using P-Y curve analysis is very commonly b

    Sep 8, 2021

  • DFI
    Pile Load Test On 1200 Mm Dia Pile In Cemented Soil - Synopsis:

    By B. Ramanathan

    The results of a pile load test on a 1200 mm dia and 25 m long bored Cast-in-situ pile in soft rock is reported. The subsoil has a high N value of above 60 from 7 m to 21 m. The soft rock was observed

    Jan 1, 1996

  • DFI
    Pile Load Test Results For Highway 280 Pile Uplift Test Site

    By Douglas Brittsan

    This paper presents pile tension and compression load test results for the Southern Freeway Viaduct (North) pile load test site. The testing program represents a collaboration between California Depar

    Jan 1, 1993

  • DFI
    Pile Load Test Results Using The New Statnamic Method

    By Matthew Janes

    Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa

    Jan 1, 1990

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • DFI
    Pile Load Testing in New York City

    By Joel Moskowitz, Jan Cermak

    "New York City has unique geologic conditions which must be considered when designing pile foundations. Where shallow foundations are not feasible, the City's subsurface conditions require a variety o

    Jan 1, 2005

  • DFI
    Pile Load Testing Of Helical Piles And Driven Steel Piles In Anchorage, Alaska

    By Mohammed Sakr

    The use of helical piles for permanent foundation applications has become a practical and feasible alternative to the traditional cast-in-place concrete or driven steel piles. Research and development

    Jan 1, 2009

  • DFI
    Pile Load Tests

    Case I- Timber Pile Test- 4 pages describe the pile driving record, the pile load test and the boring log. Case II- 24 inch square prestressed concrete pile-5 pages give details about the pile dri

    Jan 1, 1988

  • DFI
    Pile Monitoring, Testing, And Data Processing: New Developments And Remaining Issues

    By Alain E. Holeyman

    After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi

    Jan 1, 2006

  • DFI
    Pile Set-Up to Optimize High-Rise Bridge Design

    By Charles Winter

    The Ohio Department of Transpor- tation's (ODOT's) $228 million 1-480 Valley View Bridge project was needed to keep traffic flowing on one of the state's busiest freeway segments. Deterioration from a

    May 1, 2022

  • DFI
    Pile Settlement Design Using Continuous Surface Wave Testing And Modulus Degradation

    By Hennie F. T. Barnard

    Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me

  • DFI
    Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)

    By Hennie F. T. Barnard, Theodore E. B. Vorster

    Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me

    Jan 1, 2017

  • DFI
    Pile Shaft Capacity from Cone Penetration Test (CPT) Records; Considering Scale Effects

    By Abolfazl Eslami, Sepide Lotfi, Mohammad M. Eslami

    "Via direct CPT methods for pile capacity prediction, correlation coefficients smaller than unity are used to relate cone tip resistance (qc) and sleeve friction (fs) to pile toe capacity (rt) and sha

    Jan 1, 2015

  • DFI
    Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998

    By D. M. Holloway

    As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity

    Jan 1, 1998