Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimisation of Rotary DrillingOptimising drill performance has always been a primary goal of drilling and blasting managers. Improving drilling rates and utilisation will ultimately drive the cost per foot or metre downward. Ad
Jan 1, 1995
-
Optimisation of Sampling Procedures at the Fimiston Open Pit, KalgoorlieBy Chapman G. J
Mining operations require detailed and precise methods and procedures for the optimum selection of ore from waste. A fundamental procedure applied to achieve this selection is accurate sampling. The k
Jan 1, 1993
-
Optimisation Of SiMn Production At TransalloysBy J. Griesel, P. H. F. Bouwer, K. Bisaka
Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon
Jan 1, 2004
-
Optimisation Of Single-Layer Cover Made Of Desulphurized Tailings: Application To The Doyon MineBy I. Demers
Doyon mine, Quebec, Canada evaluates the possibility of desulphurizing their tailings to produce material to be used in as cover over the acid generating tailings disposal site. Laboratory tests were
Jan 1, 2008
-
Optimisation of Slope Angles at Rosario Mine, CollahuasiBy A R. Bonani, M P. Pe±a
The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p
Jan 1, 2007
-
Optimisation Of Specific Power Consumption In The Production Of Ferro Alloys Through Rationalisation Of Charge DistributionBy S. Ranganathan
Production of ferro-chromium in the submerged-arc furnace is highly energy-intensive. Several process rates have been attempted to reduce the specific energy consumption in the production of this allo
Jan 1, 2007
-
Optimisation of Spray Collers for Cooling Deep Coal MinesBy Hagen G, Uhlig H
In the Federal Republic of Germany the thermal environment in underground coal mines has deteriorated progressively over the past years. The number and capacity of refrigeration plants have increa
Jan 1, 1988
-
Optimisation of Steam and Energy Usage in a Nickel RefineryThe nickel refinery at Yabulu consumes an average of 118,000 kg/h of low pressure steam in stripping operations to-recover ammonia and carbon dioxide from product liquor and ore tailings streams. The
Jan 1, 1985
-
Optimisation of surface tailings storage and tailings backfill – a case studyBy B P. Wrench, N R. Steward, C Wu
A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi
Jul 23, 2018
-
Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, FinlandOptimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland
Sep 13, 2010
-
Optimisation Of The Anode Sector At Norddeutsche AffinerieBy Torben L. Edens
Norddeutsche Affinerie is the largest copper producer in Europe. Two sites are in operation for the production of refined copper: primary copper production is located in Hamburg and secondary copper p
Jan 1, 2006
-
Optimisation Of The Ball Mill Circuit Using A Simulator In Conjunction With Measurements From A Non-Intrusive SensorThe ball level and pulp load play a key role in the operation of industrial scale ball mills. These two operating variables have a significant influence on the performance of the ball mill and any att
Sep 1, 2012
-
Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional SimulationBy J Bower
The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by t
Jan 1, 2009
-
Optimisation of the Leach Conditions for a Copper/Uranium OreBy S. J. Macnaughton
The Olympic Dam deposit in South Australia contains 2% copper and 0.06% uranium, which are present as bomite, chalcocite, chalcopyrite, uraninite, coffinite and brannerite. The copper is principally r
Jan 1, 1999
-
Optimisation of the Milling Design of the Chessy Project Near Lyon, FranceBy Gallet M, Watsford R. M S
The 1989 feasibility study of the chessy, france, copper, zinc, pyrite and barite orebody was based upon a classical flowsheet. The flowsheet included, three stages of crushing, conventional rod and
Jan 1, 1991
-
Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South AustraliaBy B Cook, M Karakus, J Light, E K. Chanda
The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements
Mar 24, 2014
-
Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process ControlBy J Hartog, V Beehan, D Beeson
Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing
Sep 1, 2014
-
Optimisation of the Performance of Flotation Circuits Using a Genetic Algorithm Oriented by Process-Based RulesOptimisation of the Performance of Flotation Circuits Using a Genetic Algorithm Oriented by Process-Based Rules
Sep 13, 2010
-
Optimisation Of The Phosphate Nokes Process At The El Teniente By-Product Molybdenite PlantBy S. H. Castro
The El Teniente molybdenite plant (Chile), with a nominal capacity of 3,200 tpd of bulk Cu-Mo concentrate, produced approximately 3,385 metric tonnes of Mo during 1998 by using the phosphate Nokes pro
Jan 1, 1999
-
Optimisation of the Prominent Hill Flotation CircuitBy P Woodward, T Ly, N Muhamad
OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial
Jul 15, 2013