Search Documents

Sort by

  • NIOSH
    OFR-96-82 Thixogelled Halon/Dry Powder Fire Suppressant

    By W. B. Tarpley

    This program was conducted to demonstrate the unique advantages of suppressing methane ignition in underground mines by use of Energy & Minerals Research Company's thixogel fire extinguishing sys

    Jan 1, 1981

  • NIOSH
    OFR-96-83 A Study Of Explosion-Proof Enclosures

    By P. A. Cox

    The purpose of the initial research performed under this contract was to determine the margins of safety in explosion-proof (XP) enclosures, which were designed and certified according to the current

    Jan 1, 1982

  • NIOSH
    OFR-96-86 Flywheel-Powered Shuttle Car

    By Donald Christofferson

    This report documents the program conducted to demonstrate the application of a flywheel-powered propulsion system to underground mining shuttle cars. Such application can replace the present electric

    Jan 1, 1986

  • NIOSH
    OFR-96-92 The Materials Flow Of Cobalt In The United States

    By Kim B. Shedd

    An initial evaluation of the flow of cobalt-containing materials in the United States was prepared. The following aspects of materials flow were included: cobalt released as a result of mining and pro

    Jan 1, 1992

  • NIOSH
    OFR-97(1)-75 Quick Disconnect Couplers For Trailing Cables

    Three complete connector assemblies and six separate contacts were submitted to a series of tests to establish the connectors permissibility and compliance with U. S. Bureau of Mines research Contract

    Jan 1, 1974

  • NIOSH
    OFR-97(1)-77 Development Of A Conveyor-Type Cross Pit Overburden And Material Handling System - Revision -1

    By L. J. Defferding

    This report documents the work performed by Battelle-Northwest and its sub-contractors in Phase I of a project to develop a cross pit conveyor system for the Bureau of Mines. The conveyor system des

    Jan 1, 1976

  • NIOSH
    OFR-97(2)-75 Report Of Qualification Test U.S. Bureau Of Mines Connector Development

    Three complete connector assemblies and ten separate contacts were submitted to a series of tests to establish the connector permissibility and compliance with the Bureau of Mines' research Contr

    Jan 1, 1972

  • NIOSH
    OFR-97(2)-77 Development Of A Conveyor-Type Cross Pit Overburden And Material Handling System ? Revision 1, Appendix A ? Supplementary Overburden Crushing Info - User Experience With The Stamler Feeder/Breaker For Crushing Material Other Than Coal

    Although the Stamler feeder/breaker has been used for coal crushing in underground mines for many years, it has only recently been applied to other crushing operations. Two companies presently using

    Jan 1, 1976

  • NIOSH
    OFR-97(2)-80 Coal Mining Equipment Vibration Data Report - Volume II

    By Ervin P. Fuchs

    Volume II of this report presents the vibration data, octave band data, one-third octave band data and narrow band (amplitude versus frequency) data for ten mining machines. These ten mining machines

    Jan 1, 1979

  • NIOSH
    OFR-97(A)-82 Improved Solution Mining Production Cost Model - Introduction

    On April 1, 1982, the Bureau of Mines and the Department of Energy entered into an Interagency Agreement to develop an enhanced computer cost model for uranium in situ leach mining. The original compu

    Jan 1, 1982

  • NIOSH
    OFR-97-78 Design, Fabrication And Field Testing Of Remotely Operated Longwall Head/Tail Supports

    By Alfred Bellows

    The objective of this contract is to design, build and demonstrate a support system to improve roof control in the entries of longwall mines. The objective of this phase has been the detailed design o

    Jan 1, 1978

  • NIOSH
    OFR-97-79 Evaluation Of Roof Conditions From Bolting Machine Parameters

    By Richard W. Lusignea

    This report describes a program to evaluate the feasibility of determining roof features which occur in United States coal mines from changes in bolting machine drilling parameters. The ultimate purpo

    Jan 1, 1978

  • NIOSH
    OFR-97-82 Cost And Sensitivities Analysis For Uranium In Situ Leach Mining

    By George W. Toth

    Uranium in situ leach mining has recently emerged as a viable alternative to conventional miring techniques. The cost implications of in situ mining are therefore of increasing interest to mining para

    Jan 1, 1981

  • NIOSH
    OFR-97-84 Coal Waste Disposal Survey. Coal Refuse - An Increasingly Serious Problem For Colorado Plateau Production

    By Susan M. White

    Increased coal production, wider use of indiscriminate mining techniques, improved cleaning methods, and greater emphasis on clean fuels is increasing the rate at which wastes accumulate Over the next

    Jan 1, 1982

  • NIOSH
    OFR-98-75 Coal Mine Vacuum Sweeper

    A mobile vacuum sweeper to remove loose coal and coal dust from underground coal mine workings was designed, built, tested, and evaluated. The design was based on an extensive test program. Pick up

    Jan 1, 1975

  • NIOSH
    OFR-98-77 Rapid Excavation Of Rock With Small Charges Of High Explosives

    By George B. Clark

    The purpose of this investigation was to determine the feasibility of designing and testing the elements of a small charge blasting system which will eliminate, or reduce to acceptable levels, most of

    Jan 1, 1976

  • NIOSH
    OFR-98-80 Concept Study Shuttle Car Cable Reel

    By R. J. Gunderman

    Cable reel systems for shuttle cars were investigated to determine whether an improved system could be identified. Interviews and mine visits were conducted to better define limitations and problems w

    Jan 1, 1980

  • NIOSH
    OFR-98-81 Study Of Respirable Dust Outby The Working Face Of A Coal Mine

    By R. L. Rankin

    The program objective was to conduct surveys of respirable dust concentrations in coal mining operations at locations outby the working face. The results of these surveys were directed toward 1. ident

    Jan 1, 1980

  • NIOSH
    OFR-98-82 Compaction Criteria For Coal Waste Embankments

    By N. S. Shan

    This report presents the results of a study to determine compaction criteria for coal waste embankments. The purpose of this study is to evaluate the costs and resulting effects on the engineering pro

    Jan 1, 1981

  • NIOSH
    OFR-98-83 Evaluation Of Charged Walter Sprays For Dust Control

    By J. McCoy

    Charged sprays and fog have been evaluated for reducing respirable dust concen¬trations. Charged spray technology was reviewed for effectiveness, equipment and theoretical considerations. A mathematic

    Jan 1, 1983