Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Observational Method Using Real Time Surface Settlement Monitoring On The South Toulon Tunnel Project - Introduction - Project History

    By B. C. Vargas

    The Toulon tunnel project is a key component of the Highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig

    Jan 1, 2012

  • SME
    Holistic planning and approval of sustainable lignite mining and utilization

    By L. Kulik, J. den Drijver

    Rhenish lignite will continue to play an indispensible role in the energy mix of the German Federal Republic for a long time to come. The use of lignite for electricity generation, upgrading and, if n

    Jan 1, 2011

  • SME
    Use of infrared sensors for monitoring methane in underground mines

    Federal regulations require the use of methane monitors on all mining machines. All machine-mounted methane monitors currently used in underground coal mines rely on catalytic heat of combustion senso

    Jan 1, 2009

  • SME
    Rock Mechanics Of The Davis Detector Cavern ? Introduction

    By W. G. Pariseau

    This contribution describes rock mechanics features of the Davis Cavern at the former Homestake Mine in Lead, South Dakota, U.S.A. The mine is located in the northern Black Hills of South Dakota. In

    Jan 1, 2012

  • SME
    Uranium as nuclear fuel - scarce or sufficient available resource?

    By C. Slotta, F. Charlier, P. Blomen

    "Within the energy concept of the German government, the operating time of nuclear power plants was initially extended from about 8 to 14 years. It is planned, however, that every power plant will gra

    Jan 1, 2011

  • SME
    Performance Of The Lorraine Mine Site Cover To Limit Oxygen Migration

    By Bruno Bussière, Michel Aubertin, Anne-Marie Dagenais, Johanne Cyr

    A five steps remediation program was commissioned in 1998 for the acid generating Lorraine mine site, located in the Témiscamingue region, Quebec, Canada. It included, as the main expenditure, a cover

    Jan 1, 2005

  • SME
    Effects of Longwsll Subsidence on Escarpment Stability

    By Valois R. Shea-Albin

    Increasing pressure from State and Federal agencies to mitigate mining-induced subsidence damage to overlying structures has presented a unique problem to the coal industry in the western United Stat

    Jan 1, 1986

  • SME
    Kinetic And Equilibrium Effects In Gold Ore Cyanidation

    By M. I. Brittan

    Cyanide leaching of two West African gold ores was studied in multiple laboratories to provide process-engineering data for plant design purposes. Unusually slow leach extraction kinetics were observe

    Jan 1, 2008

  • SME
    Advanced Surface Enhancement Technology For Decreasing Wear And Corrosion Of Equipment Used For Mineral Processing

    By Chaoxun Zhao, Daniel Tao, Craig Blue, Narendra B. Dahotre, Rick Honaker, Bhupendra K. Parekh, Hongyang Han

    Equipment wear and corrosion have significant adverse impacts on the operating cost and efficiency of mineral processing plants. In this project advanced surface enhancement technologies are being in

    Jan 1, 2005

  • SME
    Phosphogypsum Uses

    By P. R. Clifford

    Phosphogypsum is a byproduct of the manufacture phosphoric acid. There are approximately one billion tons of phosphogypsum stored in stacks in northern and central Florida. The Florida Institute of

    Jan 1, 2002

  • SME
    Refractory Copper Ore From Nchanga, Zambia: A Materials Characterization Study

    By O. N. Sikazwe

    The Nchanga Cu-Co ore deposit of the Zambian Copperbelt, is hosted in Neoproterozoic siliciclastic-carbonate sedimentary rocks, and it consists of two orebodies: the Lower Orebody (shale) and the Uppe

    Jan 1, 2008

  • SME
    New York Subway Stations And Crossover Caverns—Update On Initial Support Design

    By Charles Stone, Hannes Lagger, Dru Desai

    The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car

    Jan 1, 2007

  • SME
    Precious Metal Recovery Using Sluice Boxes in Alaska and Canada

    By James A. Madonna

    Information gathered while studying geological parameters that govern fine gold deposition in the a1luvial environment can be applied to the technological development and selection of fine gold recove

    Jan 1, 1988

  • SME
    Study on Strata Control Based on Pillar Stress and Surface Cracks in Shallow Multi-Seam Mining

    In order to ensure safe mining and reduce surface damage in shallow multiple-seam mining, the failure characteristics of interburden strata with different coal pillar offset distances between pillars

    Jul 28, 2020

  • SME
    Investigation Of The Selectivity Of Ethoxylcarbonyl Thionocarbametes During The Flotation Of Copper Sulfides

    In this study, the flotation performances of ethoxycarbonyl thionocarbamate (ECTC), dialkyl thionocarbamate (DATC) and xanthate copper sulfide collectors are compared by the structure-reactivity relat

    Jan 1, 2008

  • SME
    Evolution Of Controlled Blasting Practices Dragon Products Company, LLC Quarry Operations, Thomaston, Me

    By K. Boakye

    This paper presents the results of a review of historic blast design practices at the Dragon Products Company, LLC (Dragon) Quarry Operation, along with the results of two different blast design vibra

    Feb 27, 2013

  • SME
    Selective Froth Recovery (SFR) System To Increase Flotation Recovery

    The SFR system utilizes a skimmer or extractor placed at or near the slurry-froth interface where there is a higher concentration of valuable mineral particles. With assistance of hydrocyclones, it is

    Jan 1, 2012

  • SME
    Monitoring Used as an Alarm System in Tunneling

    By M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli

    This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th

    Jan 1, 2007

  • SME
    Use Of High Efficiency Electrical Submersible Pumps For Large Scale Mine Dewatering

    By K. Lang

    A case study is provided that highlights the successful use of high efficiency electrical submersible pumps (ESPs) adapted from the oil and gas industry for a large scale, open pit mine dewatering

    Feb 27, 2013

  • SME
    Stanford LCLS Project - Detailed Construction Design for the Intersection Between Access Tunnel and FEH Cavern

    By Heiner J. Sander

    Stanford University operates the National Research Facility which is located at the Stanford Linear Accelerator Center (SLAC) in Menlo Park, California. In order to improve and allow for enhanced expe

    Jan 1, 2008