Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Adsorption Mechanism Of Organic And Inorganic Ions By A Clay Absorbent: SepioliteBy E. Sabah
A series of adsorption tests are carried out to understand the ability of cationic surfactants and metal ions to adsorb onto sepiolite. Adsorption tests conducted as a function of heat treatment revea
Jan 1, 1998
-
Chemical Consolidation In A Mixed Face TunnelBy Terence G. McCusker, E. Roy Anderson
A four-mile length of interceptor sewer tunnel in Manhattan has finished sizes ranging from 10'6" to 14'6" horseshoe. Mixed face conditions were anticipated in three areas and encountered in
Jan 1, 1997
-
Sinter---Pellets---Fuel?By H. E. Rowen
I hope my title is not confusing; even more so that I am not. Actually pelletizing and sintering, meaning both the formation of pellets and the hardening of them, are closely related to each other and
Jan 1, 1962
-
Operating Ideas That Have Saved Me Some Bucks-Coal Preparation at MeigsBy Michael E. Lively
DOUG HALBE: We've talked about copper operations and gold operations. For our third section on the topic "Operating Ideas That Have Saved Me Some Bucks," we'll turn to the coal fields. Our f
Jan 1, 1998
-
Study On Mesozoic Carbonates Of The Ionian Zone And Their Petroleum Potential Based On Stable Isotopes, Total Organic Carbon, SEM And Clay Minerals (NW Greece)By K. Getsos
Western Greece is a favorable site for exploration and discovery of oil fields. The most important potential source rocks seem to be all the rocks deposited before middle Jurassic under special circum
Jan 1, 2006
-
Development of Flowsheet for a Low Grade Chromite Ore in TurkeyBy Ö. Y. Gulsoy, L. Ergün, I. B. Celik
"In this study, the studies to develop a flowsheet for a low grade chromite ore are presented. The existing concentrator had to be suspended due to the decreasing metal prices. The study commenced wit
Jan 1, 2017
-
Arsenic In Geochemical Gold Exploration ? IntroductionBy Wayne S. Cavender
The geochemical association of arsenic and gold in epithermal precious metal deposits of the Basin and Range province is well documented, and in this paper I wish to discuss the evaluation and utiliza
Jan 1, 1964
-
Performance of Reinforced Ribs of Shotcrete (RRS) Under Different Stress RegimesBy Panagiotis Chryssanthakis
"The aim of this study is to give a better understanding for the performance of the composite material RRS and the synergy effect of its components under different stress regimes and while an excavati
Jan 1, 2016
-
The Photogrammetrist?s Role In Environmental SciencesBy John W. Antalovich
Normally I would like to begin a talk on photogrammetry by defining the word. However modern technology has changed the science so radically that it bears little resemblance to its original definition
Jan 1, 1970
-
Underground Storage and Distribution of Hydraulic Fill at Mayflower MineBy George L. Wilhelm
Many factors, some of which are not easily defined or described, must be considered in the design of a hydraulic backfill system. After participating in the design of several plants, I have a convicti
Jan 1, 1968
-
Steps in Reagent DevelopmentBy Peter V. Avotins
During last year's AIME meeting in New Orleans, Deepak Malhotra and I were discussing some of the topics that would be presented in this Symposium. It seemed appropriate that along with papers on
Jan 1, 1986
-
Review of 1988 international mining activitiesBy Charles L. Kimbell
The year 1988 for the minerals indus¬try was one of favorable worldwide economic conditions for continued, rationally constrained growth. There was continued improvement in relations between market
Jan 1, 1989
-
Numerical Prediction Of Subsidence With Coupled Geomechanical-Hydrological ModelingBy S. P. Girrens
A coupled finite element geomechanical- hydrology code is currently under development for application to the problem of predicting groundwater disturbances associated with mine subsidence. The structu
Jan 1, 1982
-
A New 6.4 M Diameter By 10.2m Long Ball Mill At Toquepala ConcentratorBy H. Walqui, A. Buendía
The Toquepala concentrator expansion project incremented the capacity of the existing concentrator by 15,000 Metric tons per day (t/d), from 45,000 to 60,000 t/d. The plant is located in southern Peru
Jan 1, 2003
-
Discussion - Alkali-Silica Reactivity: Mechanisms And Management - Mining Engineering, Vol. 48, No. 12, December 1996, PP. 61-64 – Leming, M. L.By B. Mather
Discussion by B. Mather I was very glad to see an article on alkali-silica reactivity of concrete aggregate in Mining Engineering. It is a topic that should be reexamined every 45 or 50 years. The la
Jan 1, 1998
-
The Effect Of Dense Media Properties On The Performance Of A Dense Medium CycloneBy Y. B. He
The effect of the stability and rheological properties of magnetite dense medium on the separation performance of a 6" dense medium cyclone (DMC) is studied with the use of fine density tracers. The t
Jan 1, 1993
-
Comparative Analysis of 3d Domain Modelling Alternatives: Implications for Mineral Resource EstimatesBy M. Tokoglu
Accurate estimation of resources is one of the major challenges in mineral project evaluation. Contemporary mineral resource estimation practice calls for contribution from several disciplines and exe
Jan 1, 2019
-
Flotation Machine DynamicsBy N. Arbiter
During the first four decades of flotation practice, close to 200 machine designs were patented, although only about a score were ever used commercially. By the end of that period, the rigors of use h
Jan 1, 1989
-
Discussion - New size laboratory ball mill for Bond Work Index determination – Mining Engineering Vol. 46. No. 4. pp. 352-353By H. Nemutolluhi
Discussion by G.E. Agar In the April issue of Mining Engineering there is a technical note "New size laboratory ball mill for Bond Work Index determination" written by M. Nematollahi which is very
Jan 1, 1996
-
Construction of the N20 To N25 Tunnel (basic) Segment of the Superconducting Supercollider Project]By Joseph A. Whitchurch
The N20 to N25 Tunnel (basic) segment was the second tunnel contract awarded for construction by The PB/MK Team. This project embodied 3.9 km (2.4 miles) of tunnel and was located within the northwest
Jan 1, 1995